Hall County · Code of Ordinances
Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.10 - SEWERS AND SEWAGE DISPOSAL / Article I - PUBLIC SEWERS
13.10.1640. Affirmative defenses to discharge
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
violations.
A. Treatment upsets.
(1) For the purposes of this section, upset means an exceptional incident in which there is unintentional and temporary noncompliance with categorical, state or local pretreatment standards or requirements,
including wastewater discharge permit conditions, because of factors beyond the reasonable control of the permitted user.
An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
(2) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical, state or local pretreatment standards or requirements
if the requirements of paragraph A.(3) of this section are met.
(3) Any permitted user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that:
(a) An upset occurred and the permitted user can identify the cause(s) of the upset;
(b) The facility was at the time being operated in a prudent and workmanlike manner and in compliance with applicable operation and maintenance procedures;
(c) The permitted user has submitted the following information to the POTW and treatment plant operator within 24 hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five days):
i. A description of the indirect discharge and cause of noncompliance;
ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and
iii. A plan of action to reduce, eliminate and prevent recurrence of the noncompliance.
(4) In any enforcement proceeding, the permitted user seeking to establish the occurrence of an upset shall have the burden of proof.
(5) Permitted users will have the opportunity for a judicial determination on any claim of upset in an enforcement action brought for noncompliance with categorical, state or local pretreatment standards or requirements.
(6) The permitted user shall control production or all discharges to the extent necessary to maintain compliance with categorical, state or local pretreatment standards or requirements upon reduction, loss or
failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power
of the treatment facility is reduced, lost or fails.
B. General/specific prohibitions. A permitted user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general and specific prohibitions in sections 13.10.1100 through 13.10.1160 and
13.10.1200 through 13.10.1260 of this chapter if it can prove that it did not know or have reason to know that its discharge, alone or in conjunction with discharges from other sources, would cause pass through or interference and that either:
(1) A local limit exists for each pollutant discharged, and the industrial user was in compliance with each limit directly prior to and during the pass through or interference; or
(2) No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the control authority was regularly
in compliance with its NPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal requirements.
C. Treatment bypasses.
(1) A permitted user may allow a bypass to occur which does not cause pretreatment standards or requirements, including permit conditions, to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Paragraphs C.(2) and (3) of this section.
(2) (a) If a permitted user knows in advance of the need for a bypass, it shall submit prior notice to the POTW,
at least ten days before the date of the bypass if possible.
(b) A permitted user shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards or requirements to the POTW within 24 hours from the
time it becomes aware of the bypass.
A written submission shall also be provided within five days of the time the permitted user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the bypass. The POTW may waive the
written report on a case-by-case basis if the oral report has been received within 24 hours.
(3) (a) Bypass is prohibited, and the POTW may take enforcement action against a permitted user for a bypass, unless:
i. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; and
ii. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during
normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods
of equipment downtime or preventive maintenance.
(b) The POTW may approve an anticipated bypass, after considering its adverse effects, if the POTW determines that it will meet the two conditions listed above in Paragraph C.(3)(a) of this section.
(Res. of 1-8-09(1), §§ 1, 2(Exh. A))
13.10.1700. FEES.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.