Skip to content
Georgia Commons
Menu

Hall County · Code of Ordinances

Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.10 - SEWERS AND SEWAGE DISPOSAL / Article I - PUBLIC SEWERS

13.10.1800. User charge system for operation and maintenance costs.

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Basis for user charge. The wastewater characteristics which are used to determine user charge are:

(1) BOD;

(2) Suspended solids;

(3) Flow volume;

(4) Oil and grease;

(5) Phosphorus; and

(6) TKN.

Normal wastewater dischargers and industrial wastewater dischargers of normal strength wastewaters shall be charged a basic user charge in which flow volume is the wastewater characteristic for determining the charge.

B. Basic user charge. The formula for determining basic user charge which applies to normal strength discharges shall be as follows:

R = V m C t R = Monthly user charge V m = Volume contribution in accordance with this Section from a user in units of 100 cubic feet C t = Sanitary sewer user charge as defined in Section 13.10.1720 (dollar per 100 cubic feet for operation and maintenance)

C. Surcharged wastewater. When BOD, suspended solids, oil and grease, phosphorus or TKN concentrations in a user's wastewater discharge is in excess of the range of concentration in normal strength wastewater as set forth in Section 13.10.1740A., a surcharge shall be added to the base charge.

D. Surcharge determination. When BOD, suspended solids, oil and grease, phosphorus, or TKN exceed the range of concentration of those pollutants in normal strength wastewater as set forth in Section 13.10.1750A., a surcharge shall be added in the basis charge. The surcharge shall be determined as follows:

C s = (B c × B + S c × S + G c × G + P c × P) V u C s = Surcharge for wastewater (dollar per month) B c = Operation, maintenance and replacement costs for treatment of one mg/L of BOD in 100 cubic feet B = Concentration of BOD from a user above base load (mg/L) S c = Operation, maintenance and replacement costs for treatment of one mg/L of suspended solids in 100 cubic feet V u = Flow volume in units of 100 cubic feet per month S = Concentration of suspended solids from a user above base level (mg/L) G c = Operation, maintenance and replacement costs for treatment of one mg/L of oil and grease in 100 cubic feet G = Concentration of grease from a user above base level (mg/L) P c = Operation, maintenance and replacement costs for treatment of one mg/L of phosphorus in 100 cubic feet P = Concentration of phosphorus from a user above base level (mg/L)

E. Sanitary sewer user charge determination. The sanitary sewer user charge, C t, which shall be revised not less frequently than biennially, shall be determined as follows:

C t = B d B c + S d S c + G d G c + P d P c + V c B d = Average mg/L of BOD of normal strength wastewater contributed S d = Average mg/L of suspended solids of normal strength wastewater contributed G d = Average mg/L of oil and grease

of normal strength wastewater contributed P d = Average mg/L of phosphorus of normal strength wastewater contributed V c = Operation, maintenance and debt service cost of the sewerage system of flow volume in units of 100 cubic feet Ct, Bc, Sc, Gc and Pc are as defined in paragraphs B. and D. of this section. Bd ,Sd ,Gd and Pd shall be revised not less frequently than biennially and shall be determined by dividing actual wastewater treatment plant loading less total surcharged loading by total annual volume contribution by domestic waste water dischargers.

Vc, Bc, Sc,Gc and Pc shall be revised not less often than two years by dividing their respective annual maintenance and operation costs by their respective annual loadings. Wastewater discharge volume (Vm) for dischargers of normal strength wastewater shall be 100 percent of the amount of water metered. For industrial wastewater dischargers which discharge surcharged waste, the wastewater discharge volume (Vu) shall be 100 percent of the amount of water metered, unless it can be shown that the volume of wastewater discharge is less.

F. Biennial review. The total cost of operation, maintenance and debt service of the sewerage system, its approved user charge system and the contribution of the users shall be reviewed not less than every two years. Charges for users shall be revised to maintain the distribution of costs among users and to generate sufficient revenue to pay the total operation and maintenance cost necessary to the proper operation and maintenance of the sewerage system.

G. Inconsistent agreements. The user charge system shall take precedence over any terms, conditions of agreements, or contracts between the county and the user, including industrial users, districts, other municipalities or federal agencies which are inconsistent with the requirements of Section 204(b)(1)(a) of the Clean Water Act and these regulations.

H. Excess revenue. Revenues collected in excess of revenues used to defray operation, maintenance and renewal and extension costs in any year shall be applied to the costs of operation and

maintenance for the next year, and the user charge adjusted to absorb the excess.

I. Toxic pollutants. Each user which discharges any toxic substance to the publicly owned sewer which causes an increase in the costs of managing the effluent or the sludge of the treatment works shall pay for the increased costs.

J. Extraneous flows. Maintenance and operation costs for all flows not attributable to users shall be distributed among all users in proportion

of flow volume of the user discharge.

K. Notification. Each user shall be notified no less than annually with a regular bill of the rate and that portion of the user charges which are attributable to wastewater treatment services.

L. Implementation. The county shall implement the user charge system upon its adoption by the Hall County Board of Commissioners. For the

first year of operation, operation and maintenance charges shall be based upon past experience and judgment. After one year of documentation of operation and maintenance cost and user loadings, user charges will be revised based on

actual data. User charges shall be reviewed annually and revised to reflect actual operation and maintenance cost of the treatment plant works.

M. Records. The county shall document the various waste treatment plant loading categories and the operation and maintenance costs attributable to each category, record user charge revenues and demonstrate that the user charge derived is a proportional distribution of operation and maintenance costs.

History

The history line the source prints at the end of the section.

(Res. of 1-8-09(1), §§ 1, 2(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/code/13.10.1800@2026-05-28-bd6b561af9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.