--- title: Hall County Code of Ordinances, 13.20.030. Application, review and fee requirements collection: local-codes id: local-code:hall-county/code/13.20.030 cite_as: Hall County, Ga., Code of Ordinances § 13.20.030 canonical_url: https://georgiacommons.org/counties/hall/code/13.20.030 md_url: https://georgiacommons.org/counties/hall/code/13.20.030.md text_url: https://georgiacommons.org/counties/hall/code/13.20.030/text source_url: https://library.municode.com/ga/hall_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:hall jurisdiction_name: Hall County county_fips: "13139" corpus_version: local-codes-hall-county-fec03cfd98ae publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/hall/code/~part-iii/~title-13/~chapter-13.20.md previous: https://georgiacommons.org/counties/hall/code/13.10.md next: https://georgiacommons.org/counties/hall/code/13.20.040.md index: https://georgiacommons.org/counties/hall.md branch: code edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hall-county/code/13.20.030@2026-05-28-9250cfaa5b --- # Hall County Code of Ordinances, 13.20.030. Application, review and fee requirements > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.20 - CONSTRUCTION STANDARDS AND OPERATIONAL RESPONSIBILITIES FOR SEWERAGE SYSTEMS AND FOR REUSE SYSTEMS A. Review. Prior to submission of the application permit and plans for the construction of a sewerage system or reuse system to the Hall County Planning Department and Building Inspections for final review, all documents shall be submitted to the Hall County Public Works and Utilities for preliminary review. B. Fee. The fee for inspections shall be as set in the Hall County Sewers and Sewage Disposal Fee Schedule as adopted by the Hall County Board of Commissioners and shall cover the cost of construction inspections of a sewerage system or reuse system performed by the Hall County Public Works and Utilities Department. C. Sewerage systems. 1. No unauthorized person(s) shall uncover, make any connections or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written building sewer permit from the building official. 2. Classes of building sewer permits. (a) There are two classes of building sewer permits: (1) For residential and commercial service, and (2) For service to establishments producing industrial wastewater. (b) For either class of building sewer permit, the owner(s) or an authorized representative shall make application on a form furnished by the county, which application shall be supplemented by any plans, specifications, or other information required by the county. In addition to the building sewer permits described in this section, all significant industrial users and other users, as determined by the director or other sections of this chapter shall obtain an industrial discharge permit as described in chapter 13.10. of this title. (c) The director may require a user of sewer services to provide information needed to determine compliance with this chapter. For residential developments over ten homes, commercial developments and industrial developments, this information shall be signed and sealed by a professional engineer licensed in the State of Georgia. These requirements may include: (1) Wastewaters discharge peak rate and volume over a specified time period; (2) Chemical analyses of wastewaters; (3) Information on raw materials, processes and products affecting wastewater volume and quality; (4) Quantity and disposition of specific liquid, sludge, oil, solvent or other materials important to sewer use control; (5) A drawing of sewers on the user's property showing sewer and; if any; pretreatment facility location; (6) Details and descriptions of wastewater pretreatment facilities; and (7) Details and descriptions of systems to prevent and control the losses of materials through spills to the county's sewer. D. Reuse systems. 1. All permit applications for reuse water shall describe water uses requested by the applicant. 2. No unauthorized person(s) shall uncover, make any connections or opening into, use, alter, or disturb any reuse system or appurtenance thereof without first obtaining a written building sewer permit from the building official. 3. Connections to the reuse pipe may occur only after the end reuse user has completed and signed the reuse water end user application and had their participation in the public information program documented by the county. 4. Any permit granted by the county is only for the owner and does not transfer when there is a change in the ownership of the reuse user or any change in the tenancy of the property for which the permit is applicable. ## History (Res. of 1-8-09(2), §§ 1, 2(Exh. A); Res. of 3-28-13, § 1(Exh. A))