sewerage systems. A. Building sewers and connections: 1. All costs and expenses incidental to the installation and connection of the building sewer shall be borne by the owner. 2. Aseparate and independent building sewer shall be provided for every building. However, where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, courtyard or driveway, then the front building sewer may be extended to the rear building and the whole considered as one building sewer. The county shall not be liable for any damage caused by or resulting from any such single connection aforementioned. 3. Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the building official, to meet all requirements of this chapter. 4. The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the building and plumbing codes and other applicable rules and regulations of the county. All work shall conform to the applicable regulations of the Federal Occupational Safety and Health Administration. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the American Society of Testing Materials and Water Environment Federation Manual of Practice No. 9, as amended, shall apply. 5. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer. 6. No person(s) shall make connection of roof downspouts, foundation drains, areaway drains, or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer unless such connection is approved by the director for purposes of disposal of polluted surface drainage. 7. The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing codes and other applicable rules and regulations of the county, or the procedures set forth in appropriate specifications of the American Society of Testing Materials and the Water Environment Federation Manual of Practice No. 9, as amended. All such connections shall be made watertight and verified by proper testing. 8. Cleanout required at point of connection. (a) A sanitary sewer cleanout shall be installed on all building sewers as close as possible to the point at which county maintenance begins. This point shall be the curbline, the right of way line, the property line, or the easement line, whichever is applicable. Such cleanout shall be six inches in diameter and shall have a brass cleanout plug. (b) The installation and cost of such cleanout shall be borne by the owner at the time of development. 9. The applicant for the building sewer permit shall notify the director when the building sewer is ready for inspection and connection to the public sewer. The connection and testing shall be made under the supervision of the director or his representative. 10. All sewer connections or "taps" shall be made exclusively by personnel of the county or their designee. 11. Connections to lines laid in streets; responsibility for chokes. (a) Sewer connections or "taps" hereinafter made by the county to sewer lines laid in the streets shall run from the sewerline to the curb line of the street. When such connections or "taps" are made on outfall or interceptor sewerlines, or any sewerline other than one laid in the street, such "tap" shall extend for a distance of not more than 20 feet from the line connected with or "tapped". (b) The property owners, or persons using sanitary sewer service, shall be responsible for repairs due to sewer chokes when the sewer choke is beyond the curb line of the street or 20 feet from the line connected with or tapped, whichever distance is closest to the sewerline. The county will make repairs and charge the cost thereof to the property owner or person using sanitary sewer service. 12. Connections—Fittings, equipment, and supervision. (a) All connections to sewer pipes comprising the sewer system of the county shall be made with an insertion type "Y" or "T" fitting under the supervision of the director. (b) All fittings and other equipment used in such connections shall be approved by the director before use in making any connection. 13. The county shall designate the size of all sewers, the grade and location of all manholes. 14. Property owners using sanitary sewer service pursuant to this chapter shall furnish all right-of-way and easements needed for sewer construction and for use thereof. 15. Unless approved by the Hall County Public Works and Utilities Director, no person shall construct any sewer pipe or conduit for sewage in any street within four feet on each side of the centerline of any sewer. B. Redundancy, reliability of sewerage system: 1. Federal Environmental Protection Agency (EPA) Class I Reliability will be provided. 2. Unless authorized by the director, pump stations, when required, shall have a minimum of three submersible type pumps, with two of the pumps jointly capable of pumping two and one-half times the estimated average daily flow. 3. Raw sewage screening and grit removal operations must have a minimum of two units, each having a capacity for two and one-half times the average daily flow. 4. Aeration basin operations must employ a minimum of two basins with equal volumes. If sequencing batch reactor (SBR) process is employed, then there will be three basins with equal volume, with two of the basins having 75 percent of the maximum month design flow. 5. Activated sludge aeration: If diffused aeration is used, then multiple blowers will be installed with remaining units capable of transferring 100 percent of the oxygen demand with the largest blower out of service; diffuses with multiple sections capable of transferring 110 percent of oxygen demand. If mechanical aerators are used, then multiple units are required in each basin. The remaining units must be capable of maintaining design oxygen transfer level with largest aerator out of service. 6. Final clarifiers: Multiple final clarifier units must be utilized with remaining units capable of handling 75 percent of the maximum month design flow. 7. Chemical use: Multiple chemical feeders must be used and must incorporate a backup unit. 8. Filters: Must utilize multiple filter units, with remaining units having 75 percent of the design maximum month flow when one unit is out of service and a second unit is in backwash. 9. Disinfection: Must utilize multiple disinfection units, with remaining units having 75 percent of the design maximum month flow when one unit is out of service. System must be designed to automatically switch over in case of failure. Ozonation systems and UV systems must have standby capabilities of 100 percent. 10. Sludge digester: System must incorporate two sludge digester units, each with 75 percent capacity for the maximum month flow with sufficient volume to meet Class A pathogen destruction in accordance with the federal Environmental Protection Agency 503 regulations. 11. Must have multiple sludge pumps with remaining units capable of handling 75 percent of the design maximum month flow. 12. The sewerage system must utilize best available technology, including, but not limited to reverse osmosis and ultraviolet disinfection. Best available technology practices are available through Hall County Public Works and Utilities. 13. The sewerage system must be constructed within a secondary containment structure. The containment structure must have capacity equal to, or greater than, 110 percent of the volume of the largest vessel. C. Alarm systems, remote monitoring, and emergency power generation: 1. The alarm system will be incorporated into the design, and the alarm system shall activate in the following circumstances: a. Loss of normal power, b. Failure of pumping systems, c. Failure of disinfection systems, or d. Excess turbidity. The alarm system must have remote monitoring/ autodialing capabilities. 2. Pump stations will be equipped with a monitoring system compatible with current county standards to relay alarm conditions to the county's designated monitoring center. 3. On-site emergency power generation shall be capable of operating all pump stations, lift stations, operator's office, and one aeration blower. Emergency power generation shall switchover automatically in case of outage. Alternatively, the system may be equipped with dual feed power supply. The system must switchover to the auxiliary feed automatically in the case of an outage. D. Pump stations: 1. Pump stations shall meet the minimum design standards set forth by the most recent county pump station guidelines. These guidelines are available through Hall County Public Works and Utilities. 2. Pump stations will have sumps capable of containing two hours of flow at the estimated average daily flow rate. The normal pumping cycle will be set so that no more than 15 minutes of the volume will be used during the normal pumping cycle. E. Storage/capacity requirements of sewage: 1. Minimum storage of four weeks inclement weather shall be provided for reuse water or effluent. 2. Wastewater treatment works needs to be designed for a ten-year rainfall of 65 inches including the reuse water rate. 3. Maximum one and one-half inches of reuse water irrigation per week is allowed. F. Buffer requirements: Plant construction must comply with all federal, state and local buffer requirements, including, but not limited to: 1. Official Code of Hall County, Georgia, chapter 8.40 (Erosion and Sedimentation Protection), chapter 8.170 (Stream Buffer Protection) and chapter 17.225 (Protected Water Supply Watershed, Protected Groundwater RechargeArea, and Wetlands Protection Overlay Zoning) as well as any subsequent buffer requirements adopted into the Official Code of Hall County, Georgia; 2. The state buffer guidelines as found in Guidelines for Slow-Rate Land Treatment of Wastewater, latest Edition, Georgia Department of Natural Resources and Guidelines for Water Reclamation and Urban Water Reuse, latest Edition, Georgia Department of Natural Resources; and 3. All other applicable state and federal law. In the event any requirements are in conflict, the more stringent standard shall be applied: