Hall County · Code of Ordinances
Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.30 - TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION
13.30.040. Private wastewater disposal.
About this text
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Where a public sanitary sewer is not available under the provisions of chapter 13.10, the building sewer shall be connected to a private
wastewater disposal system complying with the provisions of this chapter and other county or state requirements.
B. Before commencement of construction of a private wastewater disposal system, the owner(s) shall first obtain a written permit signed by the building official. The application for such permit shall be made on a form furnished by the county, which the applicant shall supplement by any plans, specifications and other information as is deemed necessary by the building official or health department. A permit and inspection fee shall be paid to the county at the time the application is filed.
C. A permit for a private wastewater disposal system shall not become effective until the installation is completed and approved by the building official. The building official shall be allowed to
inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the building inspector when the work is ready for final inspection, and before any underground portions are covered.
D. The type, capacities, location and layout of a private wastewater disposal system shall comply with all requirements of state and federal water pollution control agencies of jurisdiction
and with the local board of health. No permit shall be issued for any private wastewater disposal system employing subsurface soil absorption facilities where the front footage of the lot is less than 75 feet and the area of the lot is less
than 12,000 square feet. Prior to issuing a permit for any private wastewater disposal system employing subsurface soil absorption facilities, such facilities must meet all regulations governing
such systems as required by the county's planning and zoning regulations and Hall County Health Department regulations. No septic tank or
cesspool shall be permitted to discharge to any natural outlet or to any well.
E. At such time as a public sewer becomes available to a property served by a private wastewater disposal system, as provided in section 13.10.1110, a direct connection shall be made to
the public sewer within 90 days after notification by the building official or by the health department that the operation of the private facility is no longer acceptable, and any septic tanks, cesspools and similar private wastewater disposal facilities shall be cleaned of sludge and filled with
suitable material.
F. The owner(s) shall operate and maintain the private wastewater disposal facilities in a sanitary manner at all times, at no expense to the county.
G. No statement contained in this chapter shall be construed to interfere with any additional requirements that may be imposed by the health department.
H. Private wastewater disposal into publicly owned septic tank receiving station.
1. Permit and bond required. No person shall discharge wastewater into the publicly owned treatment works or storage facility without a written permit signed by the director or his designated representative.
The application for such permit shall be made on a form furnished by the county, which the applicant shall supplement by any plans, analyses, specifications and any other information as deemed necessary by the director or any state or federal regulatory agency. All persons at the time
of obtaining a written permit to discharge wastewater into the publicly owned treatment works or storage facility shall post a cash bond in an amount equal to the cost
of the installation.
2. Designated area for private wastewater disposal. No person shall discharge wastewater at any point of the sewerage system of the county except at the publicly owned
treatment works or storage facilities at times specifically designated by the director.
3. Prohibited discharges. No person shall discharge or cause to be discharged wastewater from sources other than singlefamily dwellings or equivalent domestic sewage located in Hall County, Georgia.
No person shall discharge or cause to be discharged materials, water or waste if it appears likely in the opinion of the director that such wastes will harm either the sewers, sewerage treatment process and/or
equipment or the environment; have an adverse effect on the receiving stream;
prevent the use or disposal of sludges by processes as may be selected in the future; will endanger life, limb, public property, or constitute a nuisance; or cause the treatment plant to violate its NPDES
permit or applicable receiving water stan dards. Some of the substances prohibited are: any pumping from grease, sand, or oil interceptors and any substances the Act (Public Law 92-500), all amendments thereto and regulations promulgated thereunder.
4. Action required by the director. If in the opinion of the director the private wastewater to be discharged into the publicly owned septic tank receiving station is
from a source located outside of Hall County, Georgia, or may have deleterious effect on the sewerage works, processes, equipment, receiving waters, or the environment or would otherwise create a hazard to human or animal life or constitute a public nuisance, the director may:
(a) Reject the waste and require the removal of the wastewater by the person who discharged the wastewater into the publicly owned treatment works or storage facility within 24 hours after oral or hand-delivered
written notice, and if the wastewater is not removed within 24 hours after the person receives such notice, the wastewater shall be removed by the county at the person's expense.
(b) Require a complete analysis of such wastewater to determine compatibility with current treatment processes at the expense of the person who
proposes the discharge of the wastewater into the publicly owned treatment works or storage facility.
(c) Require additional payment to cover the added costs of processing and treating the waste not covered by existing fees or sewerage charges as may be enacted from time to time by the county commission under provisions of chapter 13.10.
(d) Immediately revoke, orally or in writing, the sewerage permit of the person violating any provision of this chapter and terminate that person's
future use of the publicly owned treatment works or storage facility.
5. Fees charged. All persons using the publicly owned treatment works or storage facilities shall pay such charges for the
use of same as are now in effect or as may hereinafter shall be enacted by the county commission.
6. Collection of costs or expenses. The director shall notify the person in writing of all additional costs or expenses owed by the
person to the county under this chapter, and the person shall pay such costs or expenses to the county within 30 days of the date that the written notice is mailed.
If the costs or expenses are not paid within such 30 days, the director shall pay the costs or expenses out of the person's posted cash bond and the person shall post a new cash bond under section
13.30.040H.(1) of this chapter and shall not discharge wastewater into the publicly owned treatment works or storage facilities until a new cash bond is posted
pursuant to section 13.30.040H.(1) of this chapter.
7. Identification of wastewater source. No person shall discharge wastewater into the publicly owned treatment works or storage facilities, without having supplied the following information to the director:
(a) The name and address of the owner or tenant of each residential singlefamily dwelling from which wastewater is collected;
(b) The number of gallons of wastewater collected from said residential singlefamily dwelling; and
(c) Any other information deemed necessary by the director.
8. Exceptions by county commission. No statement contained in this chapter shall be construed as preventing any special agreement or arrangement between the county commission and private waste collectors
subject to payment therefore by the private waste collectors.
History
(Res. of 1-8-09(3), §§ 1, 2(Exh. A))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.