Haralson County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article V - BUILDING PERMITS
Sec. 10-177. Permit application.
About this text
- As published by Municode, current through 2023-06-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
When required, any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work. No permit shall be issued unless the proposed construction complies with the provisions of chapter 50 pertaining to zoning.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.