Skip to content
Georgia Commons
Menu

Haralson County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article V - BUILDING PERMITS

Sec. 10-193. Conditions of the permit.

About this text

  • As published by Municode, current through 2023-06-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Generally; abandonment. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the technical codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of this chapter.

An application for a permit for any proposed work shall be deemed to have been abandoned 12 months after issuance with regard to buildings and six months after issuance with regard to mobile homes unless an inspection is conducted within six months of the permit issuance, and a minimum of one approved inspection must be conducted within one year of last inspection to keep permit active.

(b) Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions that, in the opinion of the building official, are hazardous or complex, the building official shall require that computations shall supervise such work. In addition, they shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the technical codes. In the event such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed by the building official.

(c) Plans. When the building official issues a permit, he shall enforce, in writing or by stamp, both sets of plans with "Reviewed for Code Compliance." One set of drawings so reviewed shall be retained by the building official and the other set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:haralson-county/code/10-193@2023-06-06-a75dbf7f9c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Haralson County Code of Ordinances, Sec. 10-193. Conditions of the permit | Georgia Commons