(a) Other than in a residential subdivision development, the owner of a lot upon which a single-family dwelling is being constructed may, upon first obtaining a temporary permit from the zoning administrator, temporarily place a manufactured house on said lot for use as a temporary dwelling for a period of 12 months or until construction of the dwelling is completed, whichever shall first occur. (b) The application for a temporary permit shall have attached thereto a separate statement of the applicant that he acknowledges and agrees that the permit, if granted, is valid only for the time specified and that upon completion of the dwelling or the expiration of the permit, as the case may be, he shall cause the removal of said manufactured house and his failure to do so grants to the county the right to remove the same from the lot at applicant's expense. (c) The manufactured house must at least be HUD approved but is not required to have hardboard siding or a pitched roof.