Sec. 40-14. Construction plans and development permit.
About this text
- As published by Municode, current through 2023-06-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Application. Upon approval of a preliminary plat, or if no preliminary plat is required, the subdivider or land developer may apply for construction plan approval and approval of a development permit. In the case of a minor subdivision, or in cases where a preliminary plat is not required by this article, the subdivider or land developer may apply for approval of construction plans; provided, however, that in the case of a minor subdivision or land development the applicant for construction plan approval should hold a pre-application conference with the director of zoning and permits to ensure that plans meet the intent and specific provisions of this chapter and other applicable regulations. The construction plan approval and development permitting process is administrative. Applications for construction plan approval and development permit shall be made in accordance with requirements shown in Table 4-1 and Table 4-2. No application for construction plans shall be accepted for processing nor development permit approved by the director of zoning and permits until a preliminary plat, if required, has been approved by the planning commission and the proposed construction plans are found by the director of zoning and permits to be in substantial conformity with said approval and any conditions of such approval.
(b) Decision criteria. The only basis upon which the director of zoning and permits may deny a construction plan or development permit is the failure of the application to meet the requirements of this chapter or any other applicable local regulations or the failure of the construction plans and application to meet the requirements of preliminary plat approval specified by the planning commission.
(c) Certificate of approval. All copies of the construction plans shall be noted by inscription on the plan noting such approval by the director of zoning and permits.
Construction plan approval shall expire and be null and void after a period of one year, unless activity toward improvements on the land has been initiated, or unless the director of zoning and permits approves an extension of time.
(d) Engineered drawings. Engineering drawings for public streets, including cross sections and centerline profiles, and public and private water, sewer, drainage, and utility systems, certified by a professional engineer registered in the State of Georgia, or if authorized under state law, a registered land surveyor, or professional landscape architect, shall be required to be submitted for review and approval, and such plans must meet the requirements of this chapter and the specifications of the director of zoning and permits.
Prior to approval and recording of a final plat, or prior to the approval of any certificate of occupancy, if required, a registered engineer for the subdivider/developer shall submit one copy of all finished, as-built plans of improvements, demonstrating that said improvements, as installed, meet the requirements of this chapter and certifying that the plans accurately reflect actual construction and installation. The director of zoning and permits shall maintain all as-built street and utility plans for future use by the county.
(e) Permits for construction in public right-of-way. Permits from the director of zoning and permits shall be required for construction in any public right-of-way. Permits will not be issued until such time that plans have been submitted and approved by the director of zoning and permits.
(f) Improvements to abutting land. For subdivisions and land developments that abut and access an abutting public street, the subdivider or land developer shall install curb and gutter, sidewalk, other road improvements, and, if required, a deceleration lane, according to standards and specifications of this chapter and the director of zoning and permits, along all abutting public streets. When a subdivision or land development uses an unpaved public right-of-way for access, the subdivider or land developer shall improve that right-of-way to a pavement width consistent with county road design standards. Said improvements shall be from the subdivision or land development entrance to the paved county road which the director of zoning and permits determines will be the primary direction of travel for residents of the subdivision or occupants of the land development.