Skip to content
Georgia Commons
Menu

Haralson County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS AND LAND DEVELOPMENT

Sec. 40-5. Applicability and general provisions.

About this text

  • As published by Municode, current through 2023-06-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Applicability. This chapter shall apply to all real property within unincorporated Haralson County.

(b) Land is one tract until subdivided. Until property proposed for subdivision has received final plat approval and been properly recorded, the land involving the subdivision shall be considered as one tract, or as otherwise legally recorded.

(c) Subdivision of land. No person shall sell, advertise, or offer to sell, by deed, map, plat or other instrument, any parcel of land not subdivided under the requirements of this chapter. It shall be unlawful for any person to transfer or sell land by reference to, or by exhibition of, or by other use of, a plat of a land subdivision that has not been approved and recorded in accordance with the requirements of this chapter. The description of such land by metes and bounds in the instrument of transfer shall not exempt the transaction. No plat of land subdivision shall be entitled to be recorded in the Office of the Clerk of the Superior Court of Haralson County, and it shall be unlawful to record such a plat of land subdivision, unless and until it shall have been approved in accordance with the requirements of this chapter.

(d) Minor subdivision and subdivision exemptions. For the purpose of these regulations, the following shall be considered subdivisions but exempt from the requirements of major subdivisions, except as noted herein. All such subdivisions shall be drawn to final plat standards pursuant to the major subdivision ordinance and the applicant shall submit three copies of plats, and the required fee as may be established from time to time by the board of commissioners, to the zoning and permit office for review and approval, which shall proceed pursuant to the final plat approval process in the major subdivision ordinance, as modified herein, and the requirements stated in this section. The subdivider shall comply with the county erosion and sedimentation control ordinance. Should the zoning and permit office not approve any such exemption plat, the zoning and permit office shall express in writing the basis for the refusal to approve. The owner of record may file with the zoning and permit office a written appeal of the decision which together with a report from zoning and permit office shall be forwarded to the director of the zoning and permit office for consideration.

(1) Minor subdivisions. The division of land in into lots having a minimum lot area of at least five acres provided:

a. 1. Each proposed lot fronts on an existing public street which contains or shall contain at least a 60-foot right-of-way at no cost to the county. In the event more than three proposed lots front on an unimproved road, the subdivider shall enter into a development agreement with the county to bring the portion of the unimproved road adjacent to the lots up to the applicable county improved road standards at the subdivider's sole cost and expense or, in the discretion of the director of the zoning and permit office and the director of public works, if the portion of the road to be improved is not adjacent to an improved road, the county may enter into a development agreement, pursuant to which the subdivider shall provide, at the time of selling off the lots, a development impact fee in the amount of the necessary funds to offset the county's future costs and expenses to improve the road, when and if the county is able and desires to improve the road, which funds can also be used by the county to maintain the

unimproved road until such time as it is improved. The subdivider shall also enter into a development agreement with the county water authority to bring or install waterlines to the lots or upgrade the waterlines bringing water to the lots up to the applicable county water authority standards to provide adequate domestic and fire flow services at the subdivider's sole cost and expense or, in the discretion of the county water authority, the county water authority may enter into a development agreement, pursuant to which the subdivider shall provide, at the time of selling off the lots, a development impact fee in the amount of the necessary funds to offset the county water authority's future costs and expenses to improve the water lines, when and if the county water authority is able and desires to improve the water lines, which funds can also be used by the county water authority to maintain the waterlines until such time as they are improved.

If the improvements are to be undertaken by the subdivider, then the development agreement shall provide that all such public facilities shall be constructed or bonded prior to the issuance of a building permit for all or any portion of the proposed development.

2. The county authorizes and delegates to the chairman of the board of commissioners the authorization to enter into a development agreement with a subdivider pursuant to this section only if the director finds that the proposed development, which is the subject of this section, meets all requirements of this section, the county zoning regulations, the county subdivision regulations, and all other applicable regulations. Further, the county hereby authorizes the chairman of the board of commissioners to execute a development agreement and otherwise to perform all acts

necessary to deliver binding development agreements for the completion and installation of necessary public facilities.

b. Lot size minimums:

Types of Lots Min. Lot area Min. Road Frontage and Setback Lot width at building setback line Other requirements Regular Lots 5 acres Min. 300 ft.

road frontage with min. 150 ft.

setback from edge of right-ofway 300 ft.

c. Each proposed lot shall meet or exceed all other minimum requirements of the appropriate zoning district.

d. No lot shall be more than four times as deep as it is wide at the building setback lines.

e. Drive connections shall be placed to meet the visibility, maximum sight distance, spacing, and location, requirements in the major subdivision ordinance.

f. All slope and utility easements shall be provided at no cost to the county as determined by the zoning and permit office or the director.

g. A subdivider using this minor subdivision exemption shall provide an accurate preliminary conceptual plan, sketch, or drawing, as long as it is to scale, showing all proposed lots to be created out of an original or parent tract or parcel in accordance with the applicable procedures and standards for preliminary plat approval under the major subdivision ordinance.

h. Final plat approval of a lot or lots is required prior to creation of a new lot and may be revised under the procedures for revised final plat approval under the major subdivision ordinance.

i. Any proposed minor subdivision under this subsection that exceeds 20 lots shall require board of commissioners approval and shall follow the procedures and standards provided for in the county's zoning ordinance for conditional uses.

j. Each proposed lot shall comply with all the requirements of the county environmental health department.

k. A lot created under this subsection (1) titled "minor subdivisions," including any remaining portion of the original or parent lot, shall not be re-subdivided pursuant to the provisions of this subsection (1) for minor subdivision or subsection (2) for subdivision exemptions.

l. Applications for variances to the measurement requirements for yards, height, frontage, setbacks, and similar dimensional aspects may be made to the appeals board under the procedures and standards provided for in the county's zoning ordinance for variances; provided, however, that there shall be no administrative variances to the provisions of this subsubsection and there shall be no variances to the minimum acre requirements under this subsection.

m. The director of the zoning and permits office, along with the director of public works, shall be required to sign and certify that the preliminary plan and final plat or plats meet the requirements of the county's code of ordinances.

(2) Subdivision exemptions. The division of land in an appropriate zoning district into three or fewer lots:

a. Each proposed lot fronts on an existing public street which contains or shall contain at least 60-foot right-of-way at no cost to the county.

b. Lot size minimums:

Types of Lots Min. Lot area Min. Road Frontage and Setback Lot width at building setback line Other requirements Regular Lots 5 acres Min. 300 ft.

road frontage with min. 150 ft.

setback from edge of right-ofway 300 ft.

Types of Lots Min. Lot area Min. Road Frontage and Setback Lot width at building setback line Other requirements Flagpole/Irregular Lots (i.e.

a regular without the min.

required road frontage but at least a 60 ft.

driveway for ingress and egress to a regular lot) 10 acres Min. 60 ft. road frontage and width for dedicated driveway for ingress and egress to lot;

easements for ingress and egress are not permitted 210 ft. Driveways for flagpole and irregular lots cannot be side by side and must be separated by regular lots. A flagpole or irregular lot cannot be located behind or to the rear of an adjacent flagpole or irregular lot (i.e.

no stacking of flagpole and irregular lots)

c. Each proposed lot shall meet or exceed all other minimum requirements of the appropriate zoning district.

d. No lot shall be more than four times as deep as it is wide at the building setback lines. The driveway portion of a flagpole or irregular lot will not be considered in this calculation.

e. Drive connections shall be placed to meet the visibility, maximum sight distance, spacing, and location, requirements in the major subdivision ordinance.

f. All slope and utility easements shall be provided at no cost to the county as determined by the zoning and permit office or the director.

g. A lot created under this subsection (2) titled "subdivision exemptions," including any remaining portion of the original or parent lot, may not be re-subdivided pursuant to the provisions of this subsection (2) within 12 months of the creation of the lot by recording a plat or deed.

h. Each proposed lot shall comply with the requirements of the county environmental health department.

i. Applications for variances to the measurement requirements for yards, height, frontage, setbacks, and similar dimensional aspects may be made to the appeals board under the procedures and standards provided for in the county's zoning ordinance for variances; provided, however, that administrative variances to the provisions of this subsection are limited to twenty percent (25%) of a specific measurement and there shall be no variances to the minimum acre requirements under this subsection. An administrative variance for a dedicated easement having a minimum of 30 feet as egress and ingress to any landlocked parcel may be granted provided that all the other requirements of this section

(2) are satisfied.

(3) Large or single lot split. When a lot greater than 15 acres is proposed to be divided from a larger parcel pursuant to any of the subdivision exemptions allowed under paragraph (2) or (3) of this section above, or only a single lot greater than 15 acres is proposed to be recorded and approved for construction, the following shall apply:

a. A lot created under this subsection (4) shall be exempt from any width-to-depth calculation concerning the shape of the lot.

b. All other requirements pertinent to the specific type of exemption under subsection (1) or (2) of this section above shall be met.

(4) Required language for all final plats.

a. If any lot on a final plat is adjacent to an unimproved county road, a final plat shall state: "HARALSON COUNTY PUBLIC WORKS HAS NO IMMEDIATE

OR FUTURE PLANS TO IMPROVE THE EXISTING ROAD SHOWN ON THIS

PLAT TO A PAVED SURFACE. ACCEPTANCE OF THIS PLAT IS

ACKNOWLEDGEMENT THAT THE ROAD AS SHOWN MAY CONTINUE TO

BE AN UNIMPROVED ROAD FOR AN UNLIMITED TIME PERIOD."

b. Unless a final plat is approved and signed by the Haralson County Water Authority, a final plat shall state: "HARALSON COUNTY WATER AUTHORITY DOES NOT HAVE ANY EXISTING OR ADEQUATE WATER LINES

WHICH CURRENTLY SERVE THIS PROPERTY AND HAS NO IMMEDIATE

OR FUTURE PLANS FOR WATER LINE EXTENSION OR UPGRADE TO

SERVICE THIS PROPERTY. THE PROPERTY OWNER OR SUBSEQUENT

OWNERS SHALL ASSUME THAT THE PROPERTY AS SHOWN ON THIS

PLAT WILL BE SERVED BY A PRIVATE WELL SYSTEM."

(e) Development or improvement of land. No person shall disturb or develop land or engage in development except in accordance with this chapter. It shall hereafter be unlawful for any person to disturb or develop any land until construction plans submitted and development permit, if required, has been approved by the director of zoning and permits in accordance with this chapter. No person shall begin construction of any improvement on any lot prior to the approval of a preliminary plat, if required by this chapter, nor prior to approval of a development plan for said improvement as required by this chapter. The director of zoning and permits shall not authorize or permit the clearance of trees and vegetative materials, except for grubbing, outside approved construction limits.

(f) Exemption from development permit. Any development or activity that is exempt from the county's soil erosion and sedimentation control shall be similarly exempt from the development permit requirements of this chapter.

(g) Preliminary plat and plans required prior to construction. No person shall commence construction of any improvements on any lot, prior to the approval of a preliminary plat if required by this chapter, nor prior to approval of construction plans and engineering plans for said improvements are approved as required by this chapter.

(h) Building and other permits. No building permit or certificate of occupancy, if required by the local government, shall be issued for a building, structure, or use, nor shall any excavation, grading, or land disturbance applications be approved, on any parcel of land regulated by this chapter that has not been approved in accordance with the provisions of this chapter.

(i) Public streets and lands. No land dedicated as a public street or for other public purpose shall be opened, extended, or accepted as a public street or for other public land unless such improvements are constructed in accordance with the specifications of this chapter and said land and/or improvements are formally approved and accepted as public improvements by the board of commissioners in accordance with procedures established in this chapter.

(j) Appeals. Any person aggrieved by an interpretation or decision of the director of zoning and permits or other official responsible for the administration of this chapter may file an appeal to the board of appeals in accordance with the appeal procedures in the zoning ordinance of this Code.

(k) Special review of subdivisions along state routes. No subdivision plat containing land that abuts a state route shall be approved until such plat has been submitted for review and comment by the Georgia Department of Transportation, in accordance with the provisions of O.C.G.A. § 32-6-151. When the county receives such a plat, it shall submit two copies of the proposed subdivision plat to the Georgia Department of Transportation if such proposed subdivision includes or abuts on any part of the state highway system. The Georgia Department of Transportation, within 30 days of receipt of the plat, shall recommend approval and note its recommendation on the copy to be returned to the director of zoning and permits or recommend rejection. Failure of the Georgia Department of Transportation to act within this 30 day period shall constitute approval. If the plat is recommended for rejection, the reasons for rejection and requirements for approval shall be given the director of zoning and permits in writing. A recommendation for rejection shall be binding on the director of zoning and permits and the planning commission unless the Haralson County board of commissioners, by official action recorded in its minutes, overrules the recommendation for rejection.

History

The history line the source prints at the end of the section.

(Res. of 1-23-2024(1), § 1(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:haralson-county/code/40-5@2023-06-06-0d026d1b5a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.