--- title: Hart County Code of Ordinances, Sec. 18-102. Lot size and setback requirements collection: local-codes id: local-code:hart-county/code/18-102 cite_as: Hart County, Ga., Code of Ordinances ยง 18-102 canonical_url: https://georgiacommons.org/counties/hart/code/18-102 md_url: https://georgiacommons.org/counties/hart/code/18-102.md text_url: https://georgiacommons.org/counties/hart/code/18-102/text source_url: https://library.municode.com/ga/hart_county/codes/code_of_ordinances date: 2025-09-23 status: active jurisdiction: county:hart jurisdiction_name: Hart County county_fips: "13147" corpus_version: local-codes-hart-county-9640c83f485c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/hart/code/~part-ii/~chapter-18/~article-v.md previous: https://georgiacommons.org/counties/hart/code/18-101.md next: https://georgiacommons.org/counties/hart/code/18-103.md index: https://georgiacommons.org/counties/hart.md branch: code edition: As published by Municode, current through 2025-09-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hart-county/code/18-102@2025-09-23-b334abbe46 --- # Hart County Code of Ordinances, Sec. 18-102. Lot size and setback requirements > As published by Municode, current through 2025-09-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article V - DUPLEX CONSTRUCTION Lot size and setback requirements are as follows: (a) Minimum lot size: 65,340 square feet. (b) All lots shall have a minimum of 100 feet of road frontage or 60 feet adjacent to a cul de sac, or as otherwise required by the health department at the septic site, whichever is greater. (c) The principal building, HVAC, and any structures including retaining walls on any lot shall meet the following setback requirements which shall be clear and unobstructed: (1) Front: a. Sixty feet from the right of way of the county road or the specific state highways of Smith McGee, Cokesbury and Reed Creek Highways. b. On interior subdivision roads, 40 feet from the right-of-way of the interior roadway (see corner lots below). c. For all state highways except Smith McGee, Cokesbury and Reed Creek Highways, and for all county roads with a speed limit of 50 miles per hour or more, building setbacks must be 100 feet from the edge of the right of way which abuts the property line. d. All corner lots must meet the requirements for either type of roadway that the property line is adjacent to. (2) Rear: Ten feet from the property line. (3) Side: Ten feet from the property line. ## History (Ord. of 07-25-2023 (1))