Skip to content
Georgia Commons
Menu

Hart County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - FLOW RATE RESTRICTIONS ON PLUMBING FIXTURES

Sec. 18-67. Compliance with plumbing code required—Residential buildings.

About this text

  • As published by Municode, current through 2025-09-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

No construction may be initiated within the county for any residential building of any type that does not comply with the following requirements of the state plumbing code, O.C.G.A.

§ 8-2-3:

(1) Employs a gravity tank type, flushometer valve, or flushometer tank toilet that uses more than an average of 1.6

gallons of water per flush;

(2) Employs a showerhead that allows a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure;

(3) Employs a urinal that uses more than an average of 1.0 gallon of water per flush;

(4) Employs a lavatory faucet or lavatory replacement aerator that allows a flow of more than 2.0 gallons of water per minute;

or

(5) Employs a kitchen faucet or kitchen replacement aerator that allows a flow of more than 2.5 gallons of water per minute.

History

The history line the source prints at the end of the section.

(Ord. of 6-25-1991, § 2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hart-county/code/18-67@2025-09-23-6b91a85cef

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hart County Code of Ordinances, Sec. 18-67. Compliance with plumbing code required—Residential buildings | Georgia Commons