Hart County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 66 - ROADS AND BRIDGES / Article V - ROAD ADOPTION
Sec. 66-136. Procedures.
About this text
- As published by Municode, current through 2025-09-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Roads to be adopted into the county road system must have a completed right-of-way deed that has been signed by all applicable property owners. The public works director or his designee (including but not limited to an affected property owner) will be responsible for obtaining all necessary signatures. The deed shall be given to the county attorney in order to confirm its accuracy.
If the county attorney determines the deed to be valid, the deed will be returned to the public works director with a statement certifying to the accuracy of the deed. If the county attorney
determines that the deed is invalid, a statement of explanation will be returned along with the deed to the public works director. The public works director will recommend to the board of commissioners the adoption of all roads into the county road system for which completed right-ofway deeds have been obtained.
(b) Gravel roads proposed for adoption must have a minimum of 40 feet of right-of-way. Paved roads proposed for adoption must have a minimum 40 feet of right-of-way with a minimum pavement width of 20 feet.
(c) An application designed by the public works director, which contains certain descriptive information regarding a road proposed for adoption by the board of commissioners, must be completed.
(d) Under no circumstances will driveways be considered for adoption. Driveways are defined as a privately owned road providing access from a public thoroughfare to property owned by a single property owner, whether the property includes a single tract or multiple tracts.
(e) All roads proposed for inclusion in the county road system and/or proposals for adopting additional right-of-way on existing county roads must be approved by the board of commissioners at an official meeting. Upon official adoption, the county clerk will stamp the deed
with a notice indicating the date of adoption by the board of commissioners.
(f) After official adoption of roads by the board of commissioners, the county attorney shall record the deed in the clerk of superior court's office. The county attorney will return a copy of the recorded deed to the public works
director.
(g) The public works director will forward to the department of transportation a completed local certification acceptance form, a copy of the recorded deed, and a copy of the county road map
with the location of the road indicated. A copy of the same material shall also be provided to the
tax assessor's office.
(h) In cases of extreme extenuating circumstances (i.e., immovable structures) that would prevent obtaining the right-of-way width otherwise required by this section, the board of commissioners will consider petitions by affected property owners for a variance to this article.
(Procedure of 4-22-1997, §§ 1—8)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.