--- title: Hart County Code of Ordinances, Sec. 66-166. Procedures collection: local-codes id: local-code:hart-county/code/66-166 cite_as: Hart County, Ga., Code of Ordinances § 66-166 canonical_url: https://georgiacommons.org/counties/hart/code/66-166 md_url: https://georgiacommons.org/counties/hart/code/66-166.md text_url: https://georgiacommons.org/counties/hart/code/66-166/text source_url: https://library.municode.com/ga/hart_county/codes/code_of_ordinances date: 2025-09-23 status: active jurisdiction: county:hart jurisdiction_name: Hart County county_fips: "13147" corpus_version: local-codes-hart-county-9640c83f485c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/hart/code/~part-ii/~chapter-66/~article-vi.md previous: https://georgiacommons.org/counties/hart/code/66-137-to-66-165.md next: https://georgiacommons.org/counties/hart/code/66-167-to-66-185.md index: https://georgiacommons.org/counties/hart.md branch: code edition: As published by Municode, current through 2025-09-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hart-county/code/66-166@2025-09-23-a1216d67df --- # Hart County Code of Ordinances, Sec. 66-166. Procedures > As published by Municode, current through 2025-09-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 66 - ROADS AND BRIDGES / Article VI - ROAD MAINTENANCE AND PAVING POLICY (a) In June of each year, the public works director will prepare a list of roads to be submitted to the state department of transportation (DOT) requesting state aide. The request may include aggregate surface course (gravel), striping, and asphalt for paving (first time and/or resurfacing). Unless a variance is granted by the board of commissioners and the DOT, only roads with a minimum 60-foot right-of-way will be considered for paving material request. The public works director will submit this proposed list to the county administrator for review. The list, in turn, will be submitted to the board of commissioners for review and approval. Upon approval, the public works director will forward a copy of the request to the DOT. Additionally, when local funds are available, a paving list may be prepared for roads with 40-foot rights-of-way. (b) In determining priority for road work (with the exception of routine maintenance), the public works director shall use a criterion-based ranking system which takes into account such factors as: (1) Number of dwellings on the road. (2) Number of residents living on the road. (3) Length of the road. (4) If the road is a postal route. (5) If the road is a school bus route. (6) If the road is a connector road. (7) Traffic count. (8) Apparent age of the road. (9) County cost per mile. (10) Overall condition of the road. Other relevant factors may also be considered by the public works director. A description of the ranking system should be provided to the county administrator and the board of commissioners for review upon development. Additionally, a summary of the individual road scores should be included with the proposed list submitted to the county administrator and the board of commissioners. (c) If in the opinion of the public works director it is not prudent for the county to directly undertake any facet of road construction work that is required, he shall advise the county administrator of the situation. If the county administrator concurs, the public works director will be instructed to solicit bids for the required work. The bids will be opened and considered at an official meeting of the board of commissioners. (Policy of 4-23-1997, §§ 1—3)