--- title: Hart County Code of Ordinances, Sec. 66-186. Required; exceptions collection: local-codes id: local-code:hart-county/code/66-186 cite_as: Hart County, Ga., Code of Ordinances § 66-186 canonical_url: https://georgiacommons.org/counties/hart/code/66-186 md_url: https://georgiacommons.org/counties/hart/code/66-186.md text_url: https://georgiacommons.org/counties/hart/code/66-186/text source_url: https://library.municode.com/ga/hart_county/codes/code_of_ordinances date: 2025-09-23 status: active jurisdiction: county:hart jurisdiction_name: Hart County county_fips: "13147" corpus_version: local-codes-hart-county-9640c83f485c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/hart/code/~part-ii/~chapter-66/~article-vii.md previous: https://georgiacommons.org/counties/hart/code/66-167-to-66-185.md next: https://georgiacommons.org/counties/hart/code/66-187.md index: https://georgiacommons.org/counties/hart.md branch: code edition: As published by Municode, current through 2025-09-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:hart-county/code/66-186@2025-09-23-636020e802 --- # Hart County Code of Ordinances, Sec. 66-186. Required; exceptions > As published by Municode, current through 2025-09-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 66 - ROADS AND BRIDGES / Article VII - UTILITIES FACILITY INSTALLATION PERMIT (a) This article governs the installation of telephone lines, gas lines, water lines, sanitary sewer lines, electrical lines, fuel lines, steam lines, television cables, open storm drainage, storm sewers and other utilities within countymaintained road or street rights-of-way. New facilities or extensions of existing facilities within such rights-of-way shall require a written application and a permit issued by the board of commissioners. Service lines and maintenance and repair of existing facilities where, other than replacement lines or facilities, no new lines or facilities are installed shall not require a permit unless a pavement cut is required, but all other requirements of this article shall apply to such activities, where applicable. In all cases, service connections which involve setting a pole on county right-of-way or cutting or boring beneath the pavement will require a permit. (b) Emergency cuts without a permit may be made when required. Such cuts shall be followed by a written application or report to the county planning director within two working days thereafter. Repairs to the pavement and disturbed soil and all other applicable requirements of this article shall apply to such emergency cuts. For the purpose of this article, emergency is defined as an occurrence which results in a loss of service or would otherwise pose an immediate risk of loss of life, equipment or other valuable commodity. ## History (Ord. of 10-27-1998, § 1)