Every pit privy shall conform to the following specifications: (1) The pit privy must conform to those specifications contained in the rules and manual for on-site sewage management systems, chapter 290-5-26. (2) An earth fill shall be placed completely around the base of the privy in such manner as to prevent surface water from entering the pit. (3) Whenever sludge in the pit is within 18 inches of the ground surface, the owner shall move the privy to a new location or destroy the privy and build a new one in a new location, and he shall fill the old pit with earth.