(a) All septic tanks shall conform to the specifications contained in the rules and manual of on-site sewage management systems, chapter 290- 5-26. (b) The contractor shall keep a record showing: (1) The property owner's name; (2) Location of all tanks set; and (3) Construction permit number. This record shall be available for inspection by the department.