--- title: Heard County Code of Ordinances, Sec. 18-68. General standards collection: local-codes id: local-code:heard-county/code/18-68 cite_as: Heard County, Ga., Code of Ordinances § 18-68 canonical_url: https://georgiacommons.org/counties/heard/code/18-68 md_url: https://georgiacommons.org/counties/heard/code/18-68.md text_url: https://georgiacommons.org/counties/heard/code/18-68/text source_url: https://library.municode.com/ga/heard_county/codes/code_of_ordinances date: 2024-07-16 status: active jurisdiction: county:heard jurisdiction_name: Heard County county_fips: "13149" corpus_version: local-codes-heard-county-ba3fcb4a8e53 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/heard/code/~part-ii/~chapter-18/~article-iii.md previous: https://georgiacommons.org/counties/heard/code/18-48-to-18-67.md next: https://georgiacommons.org/counties/heard/code/18-69.md index: https://georgiacommons.org/counties/heard.md branch: code edition: As published by Municode, current through 2024-07-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:heard-county/code/18-68@2024-07-16-8de7ed3641 --- # Heard County Code of Ordinances, Sec. 18-68. General standards > As published by Municode, current through 2024-07-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - FLOODS / Article III - PROVISIONS FOR FLOOD HAZARD REDUCTION In all areas of special flood hazard the following provisions are required: (1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure; (2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage; (3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage; (4) All heating and air conditioning equipment and components, all electrical, ventilation, plumbing, and other services facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (5) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces; (6) New replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwater into the system; (7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; (8) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and (9) Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this article shall be undertaken only if the nonconformity is not furthered, extended or replaced. ## History (Ord. No. 50-400, art. 4, § A, 12-12-1995)