(a) All timber harvesters harvesting timber in Heard County must comply with all relevant provisions of O.C.G.A. § 12-6-24, as amended, in order to use and road(s) in Heard County for transporting harvested timber.

(b) An appointment for ingress/egress inspection shall be scheduled 24 hours in advance of the inspection with the Heard County building and zoning department to allow the Heard County code enforcement officer or his designated agent to inspect the site prior to any activity at the proposed ingress/egress location. The timber harvester shall provide written notice of the timber harvesting operation to the building and zoning department, which at a minimum, shall include:

(1) A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road;

(2) A statement as to whether the timber will be removed pursuant to a lump-sum sale, per-unit sale, or owner harvest for purposes of ad valorem taxation under O.C.G.A. § 48-5-7.5;

(3) The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to lump-sum or per-unit sale or the timber owner if the harvest is an owner harvest; and

(4) The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber;

(5) Further such persons shall give notice of cessation of cutting within 24 hours after job is completed to the Heard County building and zoning department, code enforcement officer, or his designated agent to inspect site.

(c) The following minimum standards shall be met unless directed otherwise by the county public works department or the county code enforcement officer, or their designated agent:

(1) Installation of driveway. Use one and one-half inch to three and one-half inch stone; minimum pad thickness of six inches; minimum pad width of 20 feet;

minimum pad length 50 feet; excavate footprint three inches; if tire washing is required, route runoff from washing to an approved sediment trap or sediment basin; install filter fabric under the entire pad; periodically dress with one and one-half inch to three and one-half inch stone; maintain in a condition that will prevent tracking and flow of mud onto public rights-ofway and roads; immediately remove mud and debris tracked or spilled onto roadways. This will be for all existing or future entrances/exits.

(2) Driveways shall be piped by the harvester, and upon completion of the harvesting, the pipe shall be removed and the right-of-way returned to its original condition.

(3) The harvester shall clear and gravel an equipment yard or loading dock on the property where the work is to be performed, and said yard shall be of sufficient size to accommodate that particular harvesting operation.

(d) No harvester equipment or vehicle(s) may be parked on a county right-of-way or use the county right-of-way as a loading facility.

(e) Once items (a) thru (c) have been accomplished, the timber harvester must provide the following to the building and zoning department:

(1) Persons or firms conducting timber-harvesting activities in Heard County shall furnish to Heard County, Georgia, a surety bond or bank letter of credit in the sum of $5,000.00 in a form required by law and approved by the Heard County attorney prior to beginning any timber harvesting activities in Heard County. No more than one bond from each harvester shall be required regardless of the number of tracts being harvested so long as the bond remains in effect during all harvesting operations. Said bond or letter of credit shall indemnify and protect Heard County for any damage to county road(s) or clean-up cost associated with any timber harvesting activity conducted in the county.

(2) Said bond(s) or letter(s) of credit shall be valid only for the calendar year in which it is issued, but may be transferred from one timber harvesting operation, once completed, to another.

(3) Timber harvester shall submit the fully completed notice of timber harvesting activity form along with all requested additional information and surety bond(s) or bank letter of credit(s) to the building and zoning department, which then shall review the documentation submitted and notify the timber harvester of approval or denial to proceed with the timber harvesting process.

(f) Once approval is granted, the timber harvester shall post a copy of the approval to proceed in clear view from the road at the previously inspected and approved ingress/egress point and maintain display until the timber harvesting activity is completed.

(g) Surety bond(s) or letter of credit(s) shall not be released or transferred to another location until a final inspection has been conducted by the roads department and a copy of said release is provided to the building and zoning department.

The re-inspection of the ingress/egress location by the code enforcement officer or his agent is required to ensure that the right-of-way is reestablished to its original condition prior to truck traffic. Any damages to the right-of-way or county roads utilized as the haul route shall be repaired at the expense of the timber harvester.

Pursuant to the Heard County soil erosion, sedimentation ordinance, chapter 14, article II, a citation will be issued immediately upon proof of any sediment entering onto a county or state road or sedimentation entering any waterway of the United States.

All procedures shall be followed in order to have temporary right-of-way access.

Failure to do so could result in Heard County revoking temporary access and/or inhibit release of bond(s) until all requirements are met.

History

The history line the source prints at the end of the section.

(Ord. of 3-28-2013, § 1; Ord. of 6-23-2015(1), § 1)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:heard-county/code/34-93@2024-07-16-9cd6dc9e19

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Heard County Code of Ordinances, Sec. 34-93. Timber harvesting requirements and application process | Georgia Commons