(a) Utility. Utility easements for overhead services shall be located within the platted street right-of-way and shall be a minimum width of 15 feet. Whenever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within said subdivision or phase thereof. Water and sewer lines outside of street rights-of-way shall follow side and rear property lines and shall have a minimum easement width of 20 feet, except that a greater width shall be provided where it is determined by the county engineer or person designated by the commission chairperson, county commission or county manager, that a greater width is necessary for maintenance or construction. (b) Drainage. Drainage easements shall be provided as required by the county engineer after review of the preliminary construction plans and preliminary plat of the subdivision.