Heard County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS / Article II - APPROVAL OF SUBDIVISIONS / Division 3 - REVIEW AND APPROVAL
Sec. 40-86. Preliminary plat.
About this text
- As published by Municode, current through 2024-07-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Purpose. The purpose of the preliminary plat is to safeguard the subdivider from unnecessary loss of time and expense in preparation of a subdivision plat which does not conform with the specifications of the subdivision regulations. The preliminary plat requires only approximate accuracy of scale and dimension. Public agencies (health department, county engineer or person designated by the commission chairperson, county commission, etc.) having jurisdiction will review preliminary plats regarding matters within their jurisdiction. During the review process, the subdivider or his agent may be called upon for consultation.
(b) Subdivisions requiring no new street, water, or sewer facilities. All subdivisions which do not involve the platting, construction, or opening of new streets, water or sewer facilities may be accepted by the planning commission in the form of a final plat, provided that essential data required by the reviewing agencies to insure compliance with the intent of these regulation is submitted. This essential data includes a proper soils inventory, a contour map and necessary percolation tests.
(c) Filing. Any person desiring to subdivide land shall file with the planning commission (through the county building and zoning office) five copies of the preliminary plat accompanied by a letter of application. The letter of application shall contain the name and address of the developer and his agent, the zoning of the property to be subdivided, whether or not the subdivision will be developed in phases, any plans for potential annexation and plans for serving the proposed subdivision with sewer and water facilities, or individual septic and water. The plat shall be prepared in accordance with these regulations and with applicable county specifications by a registered land surveyor, who is licensed under the laws of the state. The preliminary plat shall be deemed filed with the planning commission when it is filed with the building and zoning department. At the time of filing, a certificate of filing shall be provided to the subdivider and shall include the time and date of filing. The building and zoning department shall have the authority to reject the preliminary plat if he finds that it does not comply with these regulations. If the building and zoning department rejects the preliminary plat, he shall provide the subdivider with a written statement specifying all the aspects in which the plat fails to comply. The subdivider may appeal to the planning commission from such rejection. Filing of the preliminary plat shall be accomplished at least 14 days prior to the regular planning commission meeting at which it is to be considered. The preliminary plat shall include:
(1) Title block and north arrow. The plat will show the name of the proposed subdivision, its location, the name, address and registration number of the surveyor preparing the plat and the date of the plat. A north arrow shall be included with a notation referencing the bearings to magnetic north.
(2) General layout. The plat shall show information as to the proposed street layout and widths, layout of lots with a notation as to the minimum size and width of lots and any proposed open space. Any lands to be dedicated will be identified. Plat scale, total acreage of the site and total number of lots created shall also be indicated. Lot and block identification and building setback lines shall also be indicated.
(3) Topography. The plat shall show existing contour lines dashed and any proposed contour lines solid, both sets of lines to be at two-foot intervals, mean sea level (MSL). Prominent drainage features, such as, lakes, depressions, streams, etc., which could affect the design of the subdivision shall be shown.
Engineering data showing the high-water elevation and how it was established shall be submitted.
(4) Existing features. The plat shall show the locations and names of existing and platted property lines, streets (and its right-of-way), railroads (and its rightof-way), public and private rights-of-way, sanitary sewer (and size), easements, storm drainage (and size), parks and other public open spaces, land lot and land district lines, city limits lines, if applicable and names of adjoining property owners or subdivisions.
(5) Location map. The plat shall include a small scale map of sufficient clarity so that the location of the proposed subdivision can be readily determined.
(6) Water and sewer. A statement from the subdivider shall be submitted with the preliminary plat which will describe the method by which sanitary sewer and water facilities will be provided. If a nonpublic sewer is proposed to serve a subdivision, then a soils inventory, soils percolation test results and contour map shall accompany the preliminary plat at the time of submission. The contour map shall show location and identification of each soil class and site of each percolation test. Percolation tests shall be made in accordance with county health department requirements.
(7) Future tract plan. In cases where a subdivision is to be developed in stages with additional plats being filed with the planning commission at a later date, the filing of the initial plat will be accompanied by a future tract plan, a reasonably accurate plat in sketch form of the entire tract which will show the future street system and topography for the entire tract. Once the required tract plan has been given approval by the planning commission, five copies of the approved future tract plan must be provided for distribution to the various reviewing agencies and the county building inspector.
(d) Completeness. If any of the facts in subsection (c) of this section are omitted or misrepresented on the plat, the chairperson may refuse to review the plat and shall return the plat to the subdivider to be completed or revised.
(e) Approval by individual agencies. No preliminary plat shall be approved by the planning commission unless it is approved by the county engineer or person designated by the commission chairperson, county commission or delegate and county health department. These agencies shall approve with or without modification or disapprove the preliminary plat to the extent that each has jurisdiction. If the plat is rejected, the reviewing, agency shall provide the planning commission with a written statement specifying all aspects where the plat fails to comply.
(f) Approval by planning commission. Approval or disapproval of the preliminary plat shall be accomplished within 30 days after the plat is filed with the planning commission. If after 30 days the planning commission has failed to act, the preliminary plat shall be deemed approved and heard by the county commission at their next regularly scheduled meeting.
(g) Approval of construction drawings. Upon approval of the preliminary plat and before preparation of the final construction drawings for the minimum improvements required by these regulations, the subdivider shall receive tentative approval of said engineering plans from the county engineer.
(1) The design of all minimum improvements shall be under the direction of an engineer registered in the state. All plans shall bear his seal.
(2) A certificate of approval from the county health department shall accompany all water and sewer plans.
History
(Ord. of 1-12-1999, § 4-1)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.