No construction may be initiated in the county for new constructions of any residential or commercial building, or for the repair or renovation of or addition to any existing building when such repair or renovation of or addition to such existing building includes replacement of toilets or showers or both, that: (1) Employs a gravity tank-type, flushometer-value, or flushometer-tank toilet that uses more than an average of 1.6 gallons of water per flush; (2) Employs a showerhead that allows a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure; (3) Employs a urinal that uses more than an average of 1.0 gallons of water per flush; (4) Employs a lavatory faucet or lavatory replacement aerator that allows a flow of more than 2.0 gallons of water per minute; or (5) Employs a kitchen faucet or kitchen replacement aerator that allows a flow of more than 2.5 gallons of water per minute.