--- title: Heard County Code of Ordinances, Sec. 8-125. Certificates of—Occupancy collection: local-codes id: local-code:heard-county/code/8-125 cite_as: Heard County, Ga., Code of Ordinances § 8-125 canonical_url: https://georgiacommons.org/counties/heard/code/8-125 md_url: https://georgiacommons.org/counties/heard/code/8-125.md text_url: https://georgiacommons.org/counties/heard/code/8-125/text source_url: https://library.municode.com/ga/heard_county/codes/code_of_ordinances date: 2024-07-16 status: active jurisdiction: county:heard jurisdiction_name: Heard County county_fips: "13149" corpus_version: local-codes-heard-county-ba3fcb4a8e53 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/heard/code/~part-ii/~chapter-8/~article-v.md previous: https://georgiacommons.org/counties/heard/code/8-99-to-8-124.md next: https://georgiacommons.org/counties/heard/code/8-126.md index: https://georgiacommons.org/counties/heard.md branch: code edition: As published by Municode, current through 2024-07-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:heard-county/code/8-125@2024-07-16-51b783244a --- # Heard County Code of Ordinances, Sec. 8-125. Certificates of—Occupancy > As published by Municode, current through 2024-07-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article V - ISSUANCE OF CERTIFICATES (a) Required. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy. The certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the building official. (b) Issuance of certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the technical codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of this chapter. (c) Temporary or partial occupancy. A temporary or partial certificate of occupancy may be issued for a portion of a building that may safely be occupied prior to the final completion of the building. (d) Existing building certificate of occupancy. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued.