--- title: Heard County Code of Ordinances, Sec. 8-126. Same—Completion collection: local-codes id: local-code:heard-county/code/8-126 cite_as: Heard County, Ga., Code of Ordinances § 8-126 canonical_url: https://georgiacommons.org/counties/heard/code/8-126 md_url: https://georgiacommons.org/counties/heard/code/8-126.md text_url: https://georgiacommons.org/counties/heard/code/8-126/text source_url: https://library.municode.com/ga/heard_county/codes/code_of_ordinances date: 2024-07-16 status: active jurisdiction: county:heard jurisdiction_name: Heard County county_fips: "13149" corpus_version: local-codes-heard-county-ba3fcb4a8e53 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/heard/code/~part-ii/~chapter-8/~article-v.md previous: https://georgiacommons.org/counties/heard/code/8-125.md next: https://georgiacommons.org/counties/heard/code/8-127-to-8-150.md index: https://georgiacommons.org/counties/heard.md branch: code edition: As published by Municode, current through 2024-07-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:heard-county/code/8-126@2024-07-16-dfccdd695c --- # Heard County Code of Ordinances, Sec. 8-126. Same—Completion > As published by Municode, current through 2024-07-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article V - ISSUANCE OF CERTIFICATES (a) Issuance. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy. (b) Service utilities; connections. No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by the technical codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued. (1) Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy. (2) Authority to disconnect service utilities. The building official shall have the authority to authorized disconnection of utility service to the building, structure or system regulated by the technical codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified, prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter.