(a) Compliance to technical codes. The building official upon notification from the permit holder or his agent shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical code. (1) Building. Building inspections shall be as follows: a. Foundation inspections. Foundation inspections shall be made after trenches are excavated and forms erected. b. Frame inspections. Frame inspections shall be made after the roof, all framing, fire blocking and bracing is in place and all concealing wiring, all pipes, chimneys, ducts and vents are complete. c. Final inspections. Final inspections shall be made after the building is completed and ready for occupancy. (2) Electrical. Electrical inspections shall be as follows: a. Underground inspections. Underground inspections shall be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. b. Rough-in inspections. Rough-in inspections shall be made after the roof, framing, fire blocking and bracing is in place and prior to the installation of wall or ceiling membranes. c. Final inspections. Final inspections shall be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. (3) Plumbing. Plumbing inspections shall be as follows: a. Underground inspections. Underground inspections shall be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. b. Rough-in inspections. Rough-in inspections shall be made after the roof, framing, fire blocking and bracing is in place and all soil, waste and vent piping is complete, and prior to this installation of wall or ceiling membranes. c. Final inspections. Final inspections shall be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. (4) Mechanical. Mechanical inspections shall be as follows: a. Underground inspections. Underground inspections shall be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. b. Rough-in inspections. Rough-in inspections shall be made after the roof, framing, fire blocking and bracing is in place and all ducting, and other concealed components are complete, and prior to the installation of the wall or ceiling membranes. c. Final inspections. Final inspections shall be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. (5) Gas. Gas installation inspections shall be as follows: a. Rough piping inspections. Rough piping inspections shall be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. b. Final piping inspections. Final piping inspections shall be made after all the piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. c. Final inspections. Final inspections shall be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by the new work or any changes, to ensure compliance with all the requirements of this chapter and to ensure that the installation and construction of the gas system is in accordance with reviewed plans. (6) Energy. Energy inspections shall be as follows: a. Slab insulation inspections. Slab insulation inspections shall be made when the slab rough inspection is made. This is to ensure that all slab perimeter insulation is installed correctly. b. Rough-in inspections. Rough-in inspections are to verify that all perimeter wall insulation is installed correctly before it is concealed by the wallboard. The structure shall be checked to ensure that all openings that will allow air infiltration are sealed by approved methods. c. Final inspections. Final inspections verify that all ceiling, crawl space, or basement insulation is installed to code. SEER rating on air conditioning units shall be checked for compliance. (b) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections. (c) Reinforcing steel and structural frames. Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. (d) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official has been received. (e) Waiver of inspection. In the event of natural disaster, building inspection shall be waived during the period of the disaster, as declared and defined by the board of commissioners of the county.