Skip to content
Georgia Commons
Menu

Henry County · Code of Ordinances

Henry County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Part 5 of 8. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

swivel coupling nut between the device and each valve. Unions or swivel nuts must be integral with the device or valves. Devices shall have three ballvalve test cocks in the vertical position fitted with brass or plastic threaded plugs. A fourth vertical test cock shall be provided on the upstream side of the

inlet shut-off valve. All components of the assembly, including ball valve handles and assembly bolts, shall be equal in corrosion resistance to bronze

or stainless steel in order to resist electrolysis. Access to both checking devices shall be by top and/or side entry for maintenance and repair of all interior parts. Valve handles, except Ttype, shall turn up to close and in board (90 degrees) to open.

2. Installation. The DCV backflow prevention device shall not be buried in earth, but models with ready access to both checks may be installed in meter boxes, pits or vaults, provided ball valve test cocks seated with threaded plugs are used. All components of a DCV installed below ground should be resistant to electrolysis. A resilient seat shut-off valve should be near the inlet

and outlet side of the device, and three approved test cocks provided on the device. Test cocks below ground shall be chlorinated before use.

3. Sample approved devices:

Hersey Model # FDC/Unions Watts Model # U-007-QT

b. High risk consumers. The high risk consumer or property owner shall install a reduced pressure zone (RPZ) backflow prevention device.

1. Specifications. The RPZ shall be of a size to match that of the required service line or meter.

The RPZ assembly shall consist of a pressure differential relief valve located between two (2) positive seating check valves.

The relief valve shall function automatically by sensing the pressure differential across the first check valve and discharge the backflow to atmosphere should the check valve become damaged or fouled. The relief and check valves shall have replaceable seats, and the check valves provided with captured

springs. A full-port ball valve in sizes through two (2) inches, and resilient-seat OS & Y gate valve in sizes over two (2) inches shall be on the inlet and outlet sides of the device, with a union, swivel coupling nut, or flanges between the device and each valve. Unions and swivel nuts must be integral with the device or valves. The device shall be provided with three ball valve

test cocks and a fourth test cock shall be provided on the upstream side of the inlet shutoff valve. Sizes through two (2) inches shall have all test cocks

in the vertical position. Test cocks on all assemblies shall be provided with brass or plastic threaded plugs, and relief valve vent-ports shall have suitable connections for an air gap. When a meter or other device with bronze strainer, integral or attached, is not immediately upstream of the backflow preventer, a bronze strainer

shall be provided between the inlet shutoff valve and the RPZ on sizes through two (2) inches.

All components of the assembly, including ball valve handles and assembly bolts shall be equal in corrosion resistance

to stainless steel. Access to both checking devices shall be by top and/or side entry for maintenance and repair.

2. Installation. The RPZ backflow prevention device shall not be buried in earth but shall be installed above ground in a structure that permits positive drainage, has freeze protection, and is located as close as practical to the outlet side of the meter. In lieu of above ground

installation, the RPZ may be installed immediately inside the facility provided no intervening connections exist between the meter and the device. Where relief valve discharge could cause water damage, it shall be piped via an air gap at the relief valve vent-port to a floor drain.

3. Sample approved devices:

Hersey Model Nos. FRP II-U;

6CM; 6CM-RPDA

Watts Model Nos. U-009-QT;

909OSY; 909DDC.

(2) All backflow prevention devices shall be approved by the American National Standards Institute, the American Society of Sanitary Engineering, the American Water Works Association, the University of Southern California Foundation for Cross Connection Control and Hydraulic

Research, or the Canadian Standards Association. All shut-off valves used with backflow prevention devices shall be resilient seated.

(d) Time for compliance, authorization for installation services by the authority.

(1) Upon application for new water service from the authority, a consumer shall be categorized as a low, medium, or high risk consumer and shall install the designated backflow prevention device required for that category prior to receipt of water services.

(2) Existing high risk consumers shall install the designated backflow prevention device within thirty (30) days of the adoption of this section.

(3) Existing low and medium risk consumers shall install the designated backflow prevention device within sixty (60) days of the adoption of this section.

(4) The authority is authorized to provide service for the installation of backflow prevention devices in compliance with the standards set out in paragraph (c) of this section. Installation shall be at the expense of the property owner.

(e) Inspection of backflow prevention devices required, maintenance and submission of records by property owner.

(1) All backflow prevention devices shall be maintained in proper working order. Reduced pressure zone (RPZ) devices shall be tested immediately after installation

and not less than annually thereafter.

Double check devices (DCV) in use by low or medium risk consumers shall be inspected and tested immediately after installation and at not less than five-year intervals following installation.

(2) The backflow prevention device shall be tested by a nationally recognized testing laboratory in accordance with the following standards:

a. Double check valve device: ASSE standard 1015, and shall bear the ASSE seal.

b. RPZ: ASSE standard 1015, and shall bear the ASSE seal.

c. Synthetic (i.e. rubber or nylon) components within a backflow prevention device shall be replaced not less than every five (5) years.

(3) Each consumer and owner of property which receives water services from the authority shall maintain a written record of the location, testing, and maintenance of each backflow prevention device on his/her property. Said records shall be provided to the authority upon written request by the backflow prevention program manager.

(4) High risk consumers shall submit backflow prevention device inspection and test reports annually to the backflow prevention program manager, or more frequently upon

written request. Said report shall be submitted within fourteen (14) days of completion of the inspection or written request.

(5) The authority is authorized to suspend water service to the consumer's premises in the event backflow prevention device inspection and test reports are not provided as required.

(f) Entry upon premises for purposes of inspection. The authority shall be authorized to conduct inspections to determine compliance with this

section at the discretion of the program manager.

Agents and employees of the authority shall be authorized to enter the premises of the consumer without notice during daylight hours for the purpose of inspection and testing of the backflow prevention device.

(g) Installation of thermal expansion device.

An auxiliary release valve, or expansion chamber, shall be installed where water is heated and stored in a consumer's water system, or a branch of the system, which has been closed by the installation of a backflow prevention device. Said auxiliary release valve or expansion chamber shall be installed to limit thermal expansion of the heated water to not more than eighty (80) psi static (no-flow) pressure at any fixture on the system.

(h) Lawn sprinkler or irrigation systems.

(1) Lawn sprinkler or other irrigation systems, when connected to the authority water system, shall include adequate provision for drainage and backflow prevention.

(2) Where chemicals, pesticides, fertilizer, or other additives are utilized with a sprinkler system, said system shall have an approved reduced pressure zone (RPZ)

backflow prevention device.

(i) Penalties for failure to comply with section.

(1) In the event a backflow prevention device is found not to be in compliance with those standards set forth in paragraph (c) of this section, the property owner or consumer shall cause said device to be repaired or replaced so as to meet the standards set forth in paragraph (c) within five (5) days of written notice by the authority. In the event the backflow prevention device is not repaired or replaced within five (5) days after written notice by

the authority, the authority is authorized to suspend water service to the consumer's premises without further notice until such time as the device is repaired or replaced such as to be in compliance with paragraph (c) of this section.

(2) Violation of this section by the consumer or the property owner may be punished by a maximum fine of five hundred dollars ($500.00) per occurrence.

All existing industrial and commercial customers of the Henry County Water and Sewerage Authority shall, within thirty (30) days of March

11, 1986, install at their own expense a backflow prevention valve approved by the Henry County Water and Sewerage Authority and all future industrial and commercial customers of the Henry County Water and Sewerage Authority shall be required to install at their own expense a backflow prevention valve approved by the Henry County Water and Sewerage Authority prior to the commencement of service.

(Ord. No. 86-10, Art. XVIII, 3-11-86; Ord. No.

98-09, § 2, 6-24-98) Sec. 3-5-233. Allocation of water services.

The authority shall have the right from time to time, if necessary, to allocate water to the consumer under specific rules and regulations that may hereinafter be adopted by the authority.

(Ord. No. 86-10, Art. XVIII, 3-11-86) Sec. 3-5-234. Amendments to article.

Since special circumstances frequently occur which require changes, amendments or modifications to this article, this article may be amended without notice upon the approval of said changes,

amendments or modifications by the authority and the county.

(Ord. No. 86-10, Art. XIX, 3-11-86) Sec. 3-5-235. Promulgation of rules and/or policies.

The authority is authorized to develop, implement, and administer such rules, regulations, and policies as are necessary for the construction,

maintenance and operation of the water facilities of Henry County, including but not limited to achieving and maintaining compliance with the rules, regulations and policies of all federal or state agencies having jurisdiction over same.

(Ord. No. 86-10, Art. XX, 3-11-86; Ord. No. 98-09, § 3, 6-24-98) Sec. 3-5-236. Enforcement, generally.

The authority shall enforce the terms of this article through the administrative procedures hereinbefore set out or through legal actions in a court of law.

(Ord. No. 86-10, Art. XXI, 3-11-86) Sec. 3-5-237. Tampering with authority and county property prohibited;

penalties.

(a) Any consumer, person, firm or corporation who, without the authorization of the authority:

(1) Connects onto a water line of the authority;

(2) Disconnects a water line from a water line of the authority;

(3) Connects onto a water meter of the authority;

(4) Disconnects a water meter of the authority;

(5) Moves, removes, changes, or alters the location of a water meter;

(6) Changes, alters, or damages any water meter or water line so as to prevent proper registration of water passing through said water meter or line;

(7) Obtains water;

(8) Prevents any other person from obtaining water;

(9) Obstructs or otherwise interferes with the reading or maintenance of any water meter;

(10) Obstructs or otherwise interferes with any water line, fire hydrant, pumping station or any appurtenances to water facilities of Henry County;

(11) Creates a hazardous or unsafe condition to the water facilities of Henry County;

shall be issued a citation and, if found guilty, shall be subject to a minimum fine of two hundred fifty dollars ($250.00) to a maximum fine of five hundred dollars ($500.00) and/or imprisonment in the county jail for a minimum of thirty (30) days to a

maximum of sixty (60) days.

(b) The Magistrate Court of Henry County, Georgia, shall have jurisdiction to hear, try and dispose of citations that are issued for said violations.

(c) All consumers, persons, firms, or corporations who are charged with having violated this article shall be issued a citation by the Henry

County Police Department, Henry County Sheriff's Department or a representative of the authority.

Said citation shall require the appearance of the violator in the magistrate court of Henry County, Georgia, to answer said charges.

(Ord. No. 86-10, Art. XXII, 3-11-86; Ord. No.

87-05, 6-2-87) Secs. 3-5-238—3-5-260. Reserved.

ARTICLE III. SEWER USE*

DIVISION 1. GENERALLY

Sec. 3-5-261. Purpose and policy.

(a) This article regulates the use of public and private sewers and drains; private sewage disposal; the installation and connection of building sewers and the discharge of waters and wastes

into the public sewer system; and the removal, transportation and disposal of scavenger wastes;

and provides penalties for the violation thereof and establishment of fees and other matters, in Henry County, Georgia.

(b) This article sets forth uniform requirements for direct and indirect contributors into the wastewater collection and treatment system for

Henry County, Georgia, and enables the authority to comply with all applicable state and federal laws including the Clean Water Act of 1977 and the General Pretreatment Regulations (40 CFR Part 403).

(c) The objectives of this article are:

(1) To prevent the introduction of pollutants into the municipal wastewater system which will interfere with the operation of the system or contaminate the resulting sludge.

(2) To prevent the introduction of pollutants into the municipal wastewater system which will pass through the system, inadequately treated, into receiving waters or the atmosphere or otherwise be incompatible with the system.

(3) To improve the opportunity to recycle and reclaim wastewaters and sludges from the system.

(4) To provide for equitable distribution of the cost of the municipal wastewater system.

(d) This article provides for the regulation of direct and indirect contributors to the municipal wastewater system through the issuance of permits to certain nondomestic users and through enforcement of general requirements for the other

users, authorizes monitoring and enforcement activities, requires user reporting, assumes that existing customers' capacity will not be preempted, and provides for the setting of fees for the equitable distribution of costs resulting from the

program established herein.

(e) This article shall apply to Henry County, Georgia and to persons outside the county who are, by contract or agreement with the authority, users of its wastewater collection and treatment system.

(f) The operation and enforcement of this article shall be overseen by the Henry County Water and Sewerage Authority, the governmental entity

charged with the construction, operation, and maintenance of the water and sewerage system of Henry County. Nothing in this article shall be construed to change or in any way alter the powers and authorities granted by legislation to either the Henry County Water and Sewerage Authority or the governing authority of Henry County, Georgia. The Henry County Water and Sewerage Authority shall be authorized to set and enforce, by resolution, judicial action, or otherwise, such rates, charges, penalties, policies, rules, and regulations as are deemed appropriate by

said authority, and to otherwise take any other action, for the purposes of constructing, operating, and maintaining the water and sewerage system of Henry County.

(Ord. No. 01-09, Art. I, § 1.1, 12-03-2001) Sec. 3-5-262. Definitions.

(a) Unless the context specifically indicates otherwise, the following terms and phrases, as used in this article, shall have the meanings hereinafter designated:

Act or the act: The Federal Water Pollution Control Act, also known as the Clean Water Act, as amended (33 USC 1251), et. seq.

Approval authority: The term "approval authority" shall refer to the State of Georgia's Department of Natural Resources Environmental Protection Division.

Authority (the corporate entity): The term "authority" shall mean the Henry County Water and Sewerage Authority, which is the governmental

body having jurisdiction over the construction, maintenance and operation of the water and sanitary sewer system within Henry County, Georgia, and adjacent areas.

Authority members: Members of the authority shall mean the persons duly appointed to serve as members of the Henry County Water and Sewerage Authority.

Authorized representative of user:

(1) If the user is a corporation:

a. The president, secretary, treasurer, or a vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decisionmaking functions for the corporation; or

b. The manager of one (1) or more manufacturing, production, or operation facilities employing more than two hundred fifty (250) persons or

having gross annual sales or expenditures exceeding twenty-five million dollars ($25,000,000.00) (in second-quarter 1980 dollars), if authority to sign documents has been assigned

or delegated to the manager in accordance with corporate procedures.

(2) If the user is a partnership or sole proprietorship: A general partner or proprietor, respectively.

(3) If the user is a federal, state, or local governmental facility: A director or highest official or his or her designee, appointed or designated to oversee the operation and performance of the activities of the government facility.

(4) The individuals described in subsections

(1) through (3) above may designate another authorized representative if the authorization is in writing, the authorization specifies the individual or position responsible for the overall operation of

the facility from which the discharge originates or overall responsibility for environmental matters for the company, and the written authorization is submitted to

the authority.

Biochemical oxygen demand (BOD): The quantity of oxygen utilized in the biochemical oxidation of organic matter under EPA approved laboratory procedure, after five (5) days and at twenty

(20) degrees centigrade, expressed in terms of concentration (milligrams per liter (mg/L)).

Board: Board shall mean the governing body of the Henry County Water and Sewerage Authority unless otherwise indicated as the Board of Commissioners of Henry County, Georgia.

Board of commissioners: The Board of Commissioners of Henry County (also referred to as county) shall mean the Board of Commissioners

of Henry County, Georgia, the county governing body, and its members, agents, or representatives pertaining to matters of this article.

Building drain: That part of the horizontal piping of a building drainage system which received the discharge of all soil, waste, and other drainage from inside the walls of any building

and that conveys the same to the building service sewer five (5) feet outside the foundation wall of such building.

Building sewer: The extension from the building drain to public sewer or other place of disposal.

Categorical standards: Any regulation containing pollutant discharge limits promulgated by EPA (as hereinafter defined) in accordance with

sections 307(b) and (c) of the act (33 U.S.C.

§ 1317) which apply to a specific category of users and which appear in 40 C.F.R. Chapter 1, Subchapter N, Parts 405-471.

Cesspool: A covered soak pit constructed in the soil for the disposal of domestic waste.

Combined sewer: A sewer receiving both surface runoff and sewage.

Commercial user or contributor: A premises that discharges commercial wastes similar in characteristics discharged by households but distinct from industrial wastes.

Commercial wastes: Wastes which are discharged from an office, store, restaurant, or other commercial establishment that are similar to

domestic waste in terms of characteristics.

Composite sample: A sample which is composed of several individual grab samples collected at regular intervals and mixed together. The time period over which the composite sample is collected shall be stated. Either an eight-hour or a twenty-four-hour sample composited every two

(2) hours, collected by an automatic sampler, will be acceptable.

Control authority: The term "control authority" shall refer to the Henry County Water and Sewerage Authority.

Cooling water: The water discharged from any use, such as air conditioning, cooling, or refrigeration, to which the only pollutant added is heat.

Developer: Developer shall mean any person, corporation, partnership, joint venture, public body, or legal entity that is selling, offering for sale, dividing, subdividing, or developing property for residential, commercial, or industrial use.

Direct discharge: Any discharge directly to the waters of the state.

Domestic waste: Any liquid wastes from the noncommercial preparation, cooking, and handling of food and/or containing only human excrement and similar matter from the sanitary conveniences of dwellings, commercial buildings, industrial facilities, and institutions.

Easement: A right afforded a person to make limited use of another's real property.

Effluent: The discharge flow of a pretreatment facility.

Environmental Protection Agency (EPA): A governmental agency of the United States of America having jurisdiction over certain matters stated

herein.

Environmental Protection Division, Department of Natural Resources, State of Georgia (EPD):

A governmental division of the State of Georgia Department of Natural Resources having jurisdiction over certain matters stated herein.

Existing source: Any source of discharge, the construction or operation of which commenced prior to the publication by EPA of proposed categorical pretreatment standards, which will be applicable to such source if the standard is thereafter promulgated in accordance with section 307 of the act.

Flammable: Flammable shall mean any material which is easily ignited and burns with unusual rapidity.

Floatable oil: Floatable oil is oil, fat, or grease in a physical state such that it will separate by gravity from wastewater by treatment in an approved pretreatment facility. A wastewater shall be considered free of floatable fat if it is properly

pretreated and the wastewater does not interfere with the collection and/or treatment system.

Flush toilet: The common sanitary flush commode in general use for the disposal of human excrement.

Garbage: Solid wastes from the domestic and commercial preparing, cooking, and dispensing of food, and from the handling, storage, and sale of produce.

General manager: The term general manager shall mean the General Manager of the Henry County Water and Sewerage Authority or his or her authorized deputy, agent, or representative, appointed by the authority, and authorized by the authority to fulfill the requirements of these rules and to be responsible for the operations of the water and sewer system.

Grab sample: A sample which is taken on a one-time basis with no regard to the flow and without consideration of time.

Henry County: The public entity located in the State of Georgia, governed by the Board of Commissioners of Henry County.

Holding tank waste: Any waste from holding tanks such as vessels, toilets, campers, trailers, septic tanks, and vacuum-pump tank trucks.

Indirect discharge: The term indirect discharge refers to any discharge into the public sewer system maintained by the authority.

Industrial user or contributor: An industry which discharges process wastewaters having the characteristics of industrial wastes, as distinct from commercial wastes or domestic wastes.

Industrial waste: Any liquid, solid, or gaseous waste, including suspended solids resulting from the processes employed in industrial or commercial establishments.

Interceptor line: Interceptor line, trunk line, or outfall line shall mean the sewer line leading from owner's/developer's property to the authority's existing sewer line, treatment plant, or treatment plant site. Said line normally collects sewage or could collect sewage from more than one (1) property owner and transport the sewage to the sewage treatment plant.

Interference: A discharge which, alone or in conjunction with a discharge or discharges from other sources, both:

(1) Inhibits or disrupts the publicly owned treatment works (POTW), its treatment processes or operations, or its sludge processes, use, or disposal; and

(2) Therefore is a cause of a violation of any requirement of the POTW's NPDES permit (including an increase in the magnitude or duration of a violation) or of the prevention of sewage sludge use or disposal in compliance with the following statutory provisions and regulations or

permits issued thereunder (or more stringent state or local regulations): Section 405 of the Clean Water Act; the Solid

Waste Disposal Act (SWDA) (including Title II, more commonly referred to as the Resource Conservation and Recovery Act [RCRA] and state regulations contained in any state sludge management plan prepared pursuant to Subtitle D of the SWDA); the Clean Air Act; the Toxic Substances Control Act; and the Marine Protection, Research and Sanctuaries Act.

National Categorical Pretreatment Standard or pretreatment standard: Any regulation containing pollutant discharge limits promulgated by the EPA in accordance with sections 307(b) and (c) of

the act (33 USC 1347) which applies to a specific category of industrial users.

National pollutant discharge elimination system (NPDES): A permit administered by the Environmental Protection Division, State of Georgia.

Natural outlet: Any outlet into a watercourse, pond, ditch, lake, or other body of surface water or groundwater.

New source:

(1) Any building, structure, facility, or installation from which there is (or may be) a discharge of pollutants, the construction

of which commenced after the publication of proposed pretreatment standards under section 307(c) of the act which will be applicable to such source if such standards are thereafter promulgated in accordance with that section, provided that:

a. The building, structure, facility, or installation is constructed at a site at which no other source is located;

or

b. The building, structure, facility, or installation totally replaces the process or production equipment that causes the discharge of pollutants at

an existing source; or

c. The production or wastewater generating processes of the building, structure, facility, or installation are

substantially independent of an existing source at the same site. In determining whether these are substantially independent, factors such as the extent to which the new facility is integrated with the existing plant and the extent to which the

new facility is engaged in the same general type of activity as the existing source should be considered.

(2) Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility, or installation meeting the criteria of subsection (1)b or (1)c above but otherwise alters, replaces, or

adds to existing process or production equipment.

(3) Construction of a new source as defined under this paragraph has commenced if the owner or operator has:

a. Begun, or caused to begin, as part of a continuous on-site construction program:

1. Any placement, assembly, or installation of facilities or equipment; or

2. Significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or

b. Entered into a binding contractual obligation for the purchase of facilities or equipment which are intended to be used in its operation within a reasonable time. Options to

purchase or contracts which can be terminated or modified without substantial loss and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this paragraph.

Nitrification: Nitrification shall mean the conversion of nitrogenous matter into nitrates.

Pass through: A discharge which exits the POTW into waters of the United States in quantities or concentrations which, alone or in conjunction with a discharge or discharges from other sources, is a cause of a violation of any requirement of the county's NPDES permit, including an increase in the magnitude or duration of a violation.

Penalty: Any amount of monies set forth by the authority to be levied against an industrial, commercial, or residential user of the waste system who does not comply with any article set forth in

this article.

Person: Any individual, firm, company, partnership, corporation, association, group, or society, and includes the State of Georgia, and agencies,

districts, commissions, and political subdivisions created by or pursuant to state law.

pH: The negative logarithm (to base 10) of the concentration of hydrogen ions expressed in grams per liter of solution.

Phosphorus: Phosphorous shall mean the chemical element phosphorous and its several compounds. "Phosphorous removal" shall mean the removal of phosphorous and phosphorous compounds by biological or chemical treatment or combination of both.

Polluted water or waste: Any water, liquid, or gaseous waste containing any of the following:

Soluble or insoluble substances of organic or inorganic nature which may deplete the dissolved oxygen content of the receiving stream; settleable

solids that may form sludge deposits; grease and oils; floating solids which may cause unsightly appearance; color; phenols and other substances to an extent which would impact any taste or odor to the receiving stream; and toxic or poisonous substances in suspension, colloidal state, solution, or gases.

Pretreatment or treatment: The reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater to a less harmful state

prior to or in lieu of discharging or otherwise introducing such pollutants into a POTW. The reduction or alteration can be obtained by physical, chemical, or biological processes or process changes and other means, except as prohibited by

40 CFR 403.6(d).

Private sewage disposal system: Any on-site facility approved for the disposal of domestic sewage and commercial wastewater. Such a facility shall only serve buildings affixed to the lot of record on which the facility is located. Sewer

systems that are not controlled by the authority and that serve more than one parcel or tract of land shall not be permitted under any circumstance.

Privy: A separate enclosed shelter or building containing a floor slab and seat riser constructed over an excavation in the earth and having no water connections, used as a toilet.

Privy vault: Excavation in the earth below a privy to receive human waste.

Properly shredded garbage: The waste from the preparation of cooking and dispensing of food that has been shredded to such a degree that all particles will be carried freely under the flow conditions normally prevailing in public sewers with no particle greater than one-half inch in any dimension.

Public sewer: A sewer in which all owners of abutting properties have equal rights and which is controlled by public authority.

Publicly owned treatment works (POTW): A treatment works as defined by section 212 of the act (33 USC 1292), which is owned, operated, or managed in this instance by the authority. This definition includes any sewers that convey wastewater to the POTW but does not include pipes, sewers, or other conveyances not connected to a

facility providing treatment. For purposes of this article, POTW shall also include any sewers that convey wastewaters to the POTW from persons outside the county who are, by contract or agreement with the authority, users of the county's

POTW.

Receiving waters: Those waters into which wastes are discharged.

Residential domestic user or contributor: A premises or person that discharges domestic wastewaters and occupying a single-family residential unit or a multifamily residential unit or an apartment unit or any other type of residence.

Sanitary sewer: A sewer intended to receive domestic sewage and admissible industrial waste but to which stormwater, surface water, and groundwaters are not intentionally admitted.

Scavenger waste: Putrid or offensive matter in the contents of all privies, septic tanks and cesspools.

Septic tank: A water-tight tank designed or used to receive the discharge of sewage from a building sewer.

Sewer: A pipe or conduit for carrying sewage.

Sewer surcharge: A charge for sewer service and treatment service for wastes having characteristics different from sanitary wastes and for which additional charges must be assessed in

order for the waste to be processed properly and to compensate the authority for additional expenses incurred.

Shall is mandatory. May is permissive.

Significant industrial user:

(1) A user subject to categorical pretreatment standards; or

(2) A user that:

a. Discharges an average of twentyfive thousand (25,000) gallons per day (GPD) or more of process wastewater to the POTW (excluding sanitary, non-contact cooling, and boiler blow-down wastewater);

b. Contributes a process waste stream which makes up five (5) percent or more of the average dry weather hydraulic or organic capacity of the POTW treatment plant; or

c. Is designated as such by the authority on the basis that it has a reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement.

(3) Upon a finding that a user meeting the criteria in subsection (2) has no reasonable potential for adversely affecting the POTW's operation or for violating any

pretreatment standard or requirement, the authority may at any time, on its own initiative or in response to a petition received from a user, and in accordance with procedures in 40 CFR 403.8(f)(6), determine that such user should not be considered a significant industrial user.

Significant noncompliance: Violations which meet one (1) or more of the following criteria are defined as significant noncompliance (SNC):

(1) Chronic violations—Sixty-six (66) percent or more of the measurements exceed the same daily maximum limit or the same average limit for the same pollutant parameter in a six-month period (any magnitude of exceedance constitutes a chronic violation).

(2) Technical review criteria (TRC) violations— Thirty-three (33) percent or more of the measurements exceed the same daily maximum limit for the same pollutant parameter or the same average limit by more than the TRC in a six-month period (exceeding the pretreatment limit by a factor of 1.4 for BOD, total suspended solids

(TSS), fats, and oil and grease (O&G) and

1.2 for all other pollutants except pH constitutes a TRC).

(3) Any other violation(s) of effluent limit (average or daily maximum) that the authority believes has caused alone or in combination with other discharges, interference or pass-through or endangered the health of plant personnel or the public.

(4) Any discharge of a pollutant that has caused imminent endangerment to human health and welfare or to the environment and has resulted in the POTW's exercise of its emergency authority to halt

or prevent such a discharge.

(5) Violations of compliance schedule milestones contained in a local control mechanism or enforcement order for starting construction, completing construction, and

attaining final compliance by ninety (90) days or more after the schedule date.

(6) Failure to provide reports for compliance schedules, self-monitoring data, or categorical standards (baseline monitoring reports, ninety-day compliance reports, and periodic reports) within thirty (30) days

from the due date.

(7) Failure to accurately report noncompliance.

(8) Any other violation(s) that the authority considers to be significant.

Slug load: A slug discharge is any discharge of a non-routine, episodic nature, including, but not limited to, an accidental spill or a non-customary batch discharge.

Standard industrial classification (SIC): The classification pursuant to the Standard Industrial Classification Manual issued by the Executive Office of the President, Office of Management and Budget, 1972, or the most recent such manual.

Standard methods: The examination and analytical procedures set forth in the most recent edition of the Standard Methods for the Examination of Water and Wastewater published jointly by American Public Health Association, American

Water Works Association, and the Water Environment Federation.

Storm drain (sometimes termed storm sewer): A sewer or drain which carries stormwater, surface water, and drainage but excludes sewage and industrial wastes other than unpolluted cooling water.

Street: Construed to embrace streets, avenues, drives, boulevards, roads, alleys, and lanes, and via ducts, and all other public highways in the sewer system area.

Suspended solids (SS): Solids that either float on the surface of or are in suspension in water, sewage, or other liquids which are removable by laboratory filtering.

Total Kjeldahl Nitrogen (TKN): The total of organic and ammonia nitrogen as defined in Standard Methods for the Examination of Water and Wastewater.

Total suspended solids (TSS): The sum of suspended matter and settleable matter, both volatile and nonvolatile.

Toxic pollutant: Any pollutant or combination of pollutants listed as toxic in regulations promulgated by the Administrator of the Environmental Protection Agency under the provision of CWA

section 307 (a) or other acts.

Trunk line: Interceptor line, trunk line, or outfall line shall mean the sewer line leading from owner's/developer's property to the authority's existing sewer line, treatment plant, or treatment plant site. Said line normally collects sewage or could collect sewage from more than one (1) property owner and transport the sewage to the sewage treatment plant.

Unpolluted water: Water not containing any pollutants limited or prohibited by the effluent standards in effect, or water whose discharge will not cause any violation of receiving water quality standards.

Unsanitary: Unsanitary shall mean unclean, unhealthy, or harmful to public health.

User: Any person who contributes, causes, or permits the contribution of wastewater into the county's POTW.

Wastewater contribution permit: As set forth in sections 3-5-276 through 3-5-299 of this article.

Wastewater or sewage: The liquid- and watercarrying industrial or domestic wastes from dwellings, commercial buildings, industrial facilities, and institutions, which is contributed to or allowed to enter the wastewater treatment plant.

Wastewater system: Any part of the authorityoperated system from the sewer collector lines, transportation on through and including the treatment plant.

Wastewater treatment plant: The treatment facilities owned or operated by the authority.

Watercourse: A channel in which flow of water occurs, either continuously or intermittently.

Waters of the state: All streams, lakes, ponds, marshes, watercourses, waterways, wells, springs, reservoirs, aquifers, irrigation systems, and drainage systems and all other bodies or accumulations of water, surface or underground, natural or artificial, public or private, which are contained within, flow through, or border upon the state or any

portion thereof.

(Ord. No. 01-09, Art. I, § 1.2, 12-03-01; Ord. No.

06-07, § I, 7-18-06) Sec. 3-5-263. Abbreviations.

(a) The following abbreviations shall have the designated meanings:

• ASTM—American Society for Testing Materials

• C—Degrees Centigrade

• CFR—Code of Federal Regulations

• COD—Chemical Oxygen Demand

• EPA—Environmental Protection Agency

• °F—Degrees Fahrenheit

• MBAS—Methylene Blue Active Substance

• mg/L—Milligrams per Liter

• USC—United States Code

• WEF—Water Environment Federation All other words or abbreviations shall be construed as having the meaning defined in Glossary, Water and Sewage Control Engineering, published by the Water Environment Federation, Washington, D.C., or by their general usage if

undefined.

(Ord. No. 01-09, Art. I, § 1.3, 12-03-01) Sec. 3-5-264. Authority.

The authority to administer the pretreatment program has been appointed in the general manager of the Henry County Water and Sewerage Authority. The general manager has in turn delegated the authority to the industrial pretreatment monitor for managing the day-to-day functional aspects of the pretreatment program, while still retaining the authority for overall pretreatment program administration.

(Ord. No. 01-09, Art. I, § 1.4, 12-03-01) Sec. 3-5-265. Use of public sewers required.

(a) It shall be unlawful for any person to place, deposit, or permit to be deposited in any unsanitary manner on public or private property within the county, or in any area under the jurisdiction of

the authority, any human or animal excrement, garbage, or other objectionable waste.

(b) It shall be unlawful to discharge to any natural outlet within the county or in any area under the jurisdiction of the authority any sewage or other polluted waters except where suitable treatment has been provided in accordance with subsequent provisions of this section.

(c) It shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended to be used or used for

disposal of sewage where public sewers are available.

(d) The owner of any house, building, or property used for human occupancy, employment, recreation, or other purpose situated within the county or in any area under the jurisdiction of the

authority, and abutting on any street, alley, or right-of-way in which there is now or shall be located a public sanitary sewer of the county, is hereby required at his or her expense to install suitable toilet facilities therein, and to connect the facilities directly with the proper public sewer in accordance with the provisions of this article within ninety (90) days after date of written notice from the general manager to the property owner requiring the property owner to make connection thereto, provided that the public sewer shall be within one hundred (100) feet of the property line.

(e) In the event that the property owner can demonstrate, because of the property owner's financial condition, that the property owner is not able to pay up front all fees due to the authority for connection onto the sewer facility, the manager, at his discretion, may set a payment schedule for such connection fees.

(Ord. No. 01-09, Art. 2, 12-03-01) Sec. 3-5-266. Private sewage disposal.

(a) Where a public sanitary sewer is not available under provisions of section 3-5-265(d), the building sewer shall be connected to a private

sewage disposal system complying with the provisions of this section.

(b) Before commencement of construction of a private sewage disposal system, septic tank, privy, privy vault, or cesspool for single-family dwelling, the owner shall first obtain a written permit from the county health department sanitarian.

(c) A permit for a private sewage disposal system shall not become effective until the installation is completed to the satisfaction of the county sanitarian.

(d) The type, capacities, location, and layout of a private sewage system shall comply with all recommendations of the Georgia Department of Human Resources or other local or state agencies having jurisdiction. No septic tank or cesspool shall be permitted to discharge to any natural outlet.

(e) The owner shall operate and maintain the private sewage disposal facilities in a sanitary manner at all times at no expense to the authority.

(f) At such time as a public sewer becomes available to a property served by a private sewage disposal system, as provided in section 3-5-265(d), a direct connection shall be made to the public sewer in compliance with this section, and any septic tank, cesspools, and similar private sewage disposal facilities shall be abandoned, cleaned of sludge, and filled with clean bank-run gravel or dirt within ninety (90) days of notification to do so by the general manager or other county or state agency having jurisdiction over such matters.

(g) No statement contained in this article shall be construed to nullify any additional requirements that may be imposed by the appropriate state or county regulatory agencies having jurisdiction over such matters.

(Ord. No. 01-09, Art. 3, 12-03-01) Sec. 3-5-267. Building sewers and connections.

(a) No person shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer or appurtenance thereof without

first obtaining a written permit from the general manager.

(b) There shall be three (3) classes of building sewer permits: (1) for residential service, (2) for commercial service, and (3) for service to establishments producing industrial wastes. In all cases, the owner or his or her agent shall make application on a special form furnished by the authority.

The permit application shall be supplemented by any plans, specifications, or other information considered pertinent to the judgment of the authority. Before connection is made to the public sewer, all connection fees shall be paid as required by the authority. Said permit and connection fees shall be in addition to any building permits and other fees required by the county.

(c) All costs and expenses incident to the installation and connection of the building sewer to the property line shall be borne by the owner. The

owner shall indemnify the county and the authority from any loss or damage that may directly or indirectly be occasioned by the installation of the

building sewer.

(d) A separate and independent building sewer shall be provided for each building except as otherwise approved for and for unusual circumstances, primarily involving existing buildings. A separate and independent building sewer and

connection shall be provided for each residential, commercial, and industrial business unit of multiunit buildings except as otherwise approved.

(e) Old building sewers may be used in connection with new buildings only when they are found, upon examination and tested by the authority, to

meet all the requirements of this section.

(f) The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and back-filling the trench shall all conform to the requirements of the building and

plumbing code or the county standards. In the absence of code provisions or amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply.

(g) Whenever possible, the building sewer shall be brought to the building at an elevation below the basement or first floor. No building sewer shall be made parallel to or within three (3) feet of any bearing wall which might thereby be weakened. The depth shall be sufficient to afford protection from live loads (automobile, etc.) which

may be superimposed. The building sewer shall be made at uniform grade and in straight alignment insofar as possible. The building sewer shall be constructed to that point as directed by the

general manager.

(h) No person shall maintain or make a connection of roof down spouts, exterior foundation drains, area-way drains, or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly

or indirectly to a public sanitary sewer.

(i) Before any underground portions thereof are covered, the applicant for the building sewer permit shall notify the authority when the building sewer is ready for inspection and connection to the public sewer. The connection shall be conducted under the supervision of an authorized representative of the authority.

(j) All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazards. Streets, sidewalks, parkways, and other public property disturbed in the course of the

work shall be restored in a manner satisfactory to the authority.

(k) The authority shall keep a permanent and accurate record of the location, depth, and direction of all new sewer connections including any landmarks as may be necessary to make an

adequate description.

(l) Grease, oil, and sand interceptors shall be provided when, in the opinion of the authority, based on sound engineering standards, they are necessary for the proper handling of liquid wastes containing grease in excessive amounts or any flammable wastes, sand, or other harmful ingredients, except that such interceptors shall not be required for private living quarters or dwelling

units. All interceptors shall be of a type and capacity approved by the authority and shall be located as to be readily and easily accessible for cleaning and inspection. All interceptors shall be supplied and properly maintained continuously in satisfactory and effective operation by the owner at his or her expense. The owner shall maintain records of the dates and means of disposal of material captured in the interceptors. Any rePUBLIC WORKS § 3-5-267 moval and hauling of the collected materials not

performed by the owner must be performed by currently licensed waste disposal firms.

(Ord. No. 01-09, Art. 4, 12-03-2001) Sec. 3-5-268. General discharge prohibitions.

(a) No person(s) shall discharge or cause to be discharged any unpolluted waters such as stormwater, groundwater, roof runoff, or subsurface drainage to any sewer. Connection directly or indirectly to roof downspouts, exterior foundation

drains, area drains, or other sources of surface runoff is not permitted to a building drain or building sewer connected to a public sanitary sewer. Existing connections of such items to a building sewer shall be disconnected at no expense to the authority when the building sewer is connected to the public sewer system.

(b) No person shall discharge or cause to be discharged any sanitary wastewater into a storm sewer system. Cooling or condensing water may be allowed to be discharged into a storm sewer system provided an NPDES permit is obtained from the Georgia Environmental Protection Division.

(c) No person shall discharge or cause to be discharged any garbage that has not been properly shredded. The installation and operation of any garbage grinder equipped with a motor of

three-quarter horsepower or greater shall be subject to the review and approval of the general manager.

(d) A user may not introduce into the authority's POTW any pollutant(s) which can cause pass through or interference. These general prohibitions apply to all such users of a wastewater system whether or not the user is subject to

national categorical pretreatment standards or any other national, state, or local pretreatment standards or requirements. A user shall not contribute the following substances to any wastewater system:

(1) Any liquids, solids, or gases which by reason of their nature or quantity are, or may be, sufficient either alone or by interaction with other substances to cause fire or explosion or be injurious in any other

way to the wastewater system or the operation of the wastewater system. Any waste streams with a closed cup flashpoint of less than one hundred forty (140) degrees Fahrenheit (60°C) using the test methods specified in 40 CFR part 261.21.

At no time shall two (2) successive readings on an explosion hazard meter at the point of discharge into the system (or at

any point in the system) be more than five

(5) percent, nor any single reading be over ten (10) percent of the lower explosive limit (LEL) of the meter. Prohibited materials include, but are not limited to, gasoline, kerosene, naphtha, benzene, toluene, xylene, ethers, alcohols, ketones, aldehydes, peroxides, chlorates, perchlorates, bromates, carbides, hydrides, and sulfides, and any other substances which

the authority, state, or EPA has notified the user, is a fire hazard or a hazard to the system.

(2) Solid or viscous substances which may cause obstruction to the flow in a sewer or other interference with the operation of the wastewater treatment facilities such as, but not limited to, grease, garbage with particles greater than one-half-inch in any dimension, animal guts or tissue, paunch manure, bones, hair, hides or fleshings, entrails, whole blood, feathers, ashes, cinders, sand spent lime, stone or marble

dust, metal, glass, straw, shavings, grass clippings, rags, spent grains, spent hops, lint or textile fibers, waste paper, wood, plastics, gas, tar, asphalt residues, residues from refining, or processing of fuel or lubricating oil, mud, or glass grinding or

polishing wastes.

(3) Any wastewater having a pH less than 6.0 or greater than 8.5 or wastewater having any other corrosive property capable of causing damage or hazard to structures, equipment, and/or personnel of the sewers or wastewater treatment plant.

(4) Any wastewater containing toxic or poisonous solids, liquids, or gases in sufficient quantity, either singularly or by interaction with other pollutants, to injure or interfere with any wastewater treatment process or sludge disposal, constitute a hazard to humans or animals, create a toxic effect in the receiving waters of the wastewater treatment plant, or to exceed the limitation set forth in a

categorical pretreatment standard. A toxic pollutant shall include, but not be limited to, any pollutant identified pursuant to section 307(a) of the act.

(5) Any liquids, gases, or solids which are sufficient to create a public nuisance or hazard to life or prevent entry into the sewers for maintenance and repair or interfere with the collection system or create a condition deterious to structures and treatment processes either alone or by interaction with other wastes.

(6) Any substance which may cause the sewers or wastewater treatment plant effluent or any other product of the sewers or wastewater treatment plant, such as residues, sludges, or scums, to be unsuitable for reclamation and reuse or to interfere

with the reclamation process. In no case shall a substance discharged to the sewers or wastewater treatment plant cause the sewers and wastewater treatment plant

to be in noncompliance with sludge use or disposal developed pursuant to the Solid Waste Disposal Act, the Clean Air Act, the Toxic Substances Control Act, or state criteria applicable to the sludge management method being used.

(7) Any wastewater with objectionable color not sufficiently removed in the treatment process which causes problems or adverse effects to receiving water alters the plant effluent from that which would be expected from domestic sewage, such as, but not limited to, dye wastes and vegetable

tanning solutions.

(8) Any wastewater having a temperature which will inhibit biological activity in the sewers or wastewater treatment plant resulting in interference, but in no case wastewater with a temperature at the introduction into the sewers which exceeds 149 degrees Fahrenheit (65° C) or wastewater treatment plant which exceeds 104 degrees Fahrenheit (40° C).

(9) Any pollutants, including oxygen demanding pollutants or unusual chlorine demanding substances released at a flow rate and/or pollutant concentration which can

cause interference with the operation of the wastewater treatment plant.

(10) Any high-level radioactive wastes or isotopes whose concentrations may exceed limits established by Public Law 92-100,

section 301 (33 U.S.C. section 1311), or amendments thereto, and the federal regulations promulgated thereunder or state regulations, or exceed limits established

by the authority.

(11) Any waters or wastes containing more than one (1.0) part per million by weight (ppm or mg/L) of the following gases:

hydrogen sulphide, sulphur dioxide or nitrous oxide, or any other noxious or malodorous gas or substance capable of creating a public nuisance or hazard to life or preventing entrance into sewers for their

maintenance inspection and repair.

(12) Any waters or waters containing concentrated acid, iron, pickling wastes, or concentrated plating solutions whether neutralized or not.

(13) Materials which exert or cause (a) unusual concentration of inert suspended solids such as, but not limited to, Fuller's

earth, lime slurries, and lime residues or

(b) of dissolved solids, such as, but not limited to, sodium chloride and sodium sulfate.

(14) Petroleum oil, non-biodegradable cutting oil, or products of mineral oil origin in amounts that will cause interference or pass through.

(15) Wastewater containing more than one hundred (100) milligrams per liter of oils, fat, grease, or wax, whether emulsified or not,

or containing substances which may solidify or become viscous at temperatures between thirty-two degrees Fahrenheit

(0° C) and one hundred fifty degrees Fahrenheit (65° C).

(16) Any pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity that may cause

acute worker health and safety.

(17) Disposal of trucked or hauled pollutants, except at discharge points designated by the general manager.

(18) Discharge of hazardous wastes:

a. The industrial user shall notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise

disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than one hundred (100) kilograms of such waste per calendar month to the POTW, the notification

shall also contain the following information to the extent such information is known and readily available to the industrial user: An identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the waste-stream

discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. All notifications must take place within one hundred eighty (180) days of the

effective date of this rule. Industrial users who commence discharging after the effective date of this rule shall provide the notification no later

than one hundred (180) days after the discharge of the listed or characteristic hazardous waste. Any notification under this paragraph need be submitted only once for each hazardous waste discharged. However, notifications of changed discharges must be submitted under sections 3-5-

285(3) [and] 3-5-287. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of 40 CFR article 6(v).

b. Dischargers are exempt from the requirements of subsection (18)a of this section during a calendar month in

which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of non-acute hazardous wastes in a calendar month, or of

any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the industrial user discharges more than such quantities of any hazardous waste do not require additional notification.

c. In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user must notify the POTW, the EPA regional waste management division director, and state hazardous waste authorities of the discharge of such substance within ninety (90) days of

the effective date of such regulations.

d. In the case of any notification made under subsection (18)a of this section, the industrial user shall certify that it has a program in place to

reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practicable.

(18) Water or wastes containing taste or odorproducing contaminants in such quantities that after treatment of sewage these contaminants impart their tastes or odors

to receiving waters to a detrimental degree.

(19) Any contaminant which the authority or its designated agent deems harmful to the operation or efficiency of wastewater treatment plants or to the health and welfare of the residents of Henry County.

(20) Ground paper products shall be prohibited from being discharged into the public sewer system, unless otherwise approved

by the authority.

(21) Discharges of materials or substances which would cause the effluent quality from sewage treatment plants to violate state and federal standards including NPDES permit limitations and water authority standards.

(22) Any other circumstances that from time to time may be listed by the authority.

(e) The following technically based local limits apply for industrial discharges into the authority's wastewater treatment systems:

Conventional Pollutants—All Facilities Pollutant Local Limit (mg/L)

BOD5 900

TSS 900

TKN 60

NH3-N 20

Phosphorus 50 Direct Discharge Systems Pollutants of Concern Camp Creek Local Limits for Industries (mg/L) Springdale Local Limits for Industries (mg/L) Springdale Phase 2 Local Limits for Industries (mg/L) Arsenic 0.133 1.684 0.251 Cadmium 0.006 0.752 0.096 Chromium 0.760 6.106 0.808 Copper 0.109 0.109 0.109 Cyanide 0.082 0.580 0.139 Lead 0.116 0.116 0.116 Mercury 0.002 0.0020 0.0020 Molybdenum 0.113 1.406 0.203 Nickel 0.727 5.752 0.053 Selenium 0.060 2.177 0.263 Silver 0.797 6.514 0.849 Zinc 0.212 0.212 0.212 Chloroform 8.530 * * Ethylbenzene 15.835 * * Methylene Chloride 25.162 * * Phenol * 194.724 24.987 Land Application Systems Pollutants of Concern Hampton Local Limits for Industries (mg/L) Springdale Phase 1 Local Limits for Industries (mg/L) Bear Creek Local Limits for Industries (mg/L) Aluminum 1.220 22.000 18.000 Antimony 0.037 0.660 0.540 Arsenic 0.002 1.114 0.929 Asbestos None None None Barium 12.131 216.941 180.000 Beryllium 0.024 0.440 0.360 Cadmium 0.002 1.261 1.051 Chloride 1525.424 27500.000 22500.000 Chromium 1.504 26.596 21.766 Copper 0.282 24.601 20.146 Cyanide 0.101 0.569 0.479 Fluoride 24.247 433.217 354.492 Iron 1.212 6.693 5.638 Lead 0.116 0.116 0.116 Manganese 0.251 3.186 2.621 Mercury 0.003 0.497 0.407 Molybdenum 0.006 1.300 1.080 Nickel 0.005 6.030 5.033 Nitrate 61.017 1100.000 900.000 Nitrite 6.102 110.000 90.000 Total NO3 + NO2 61.017 1100.000 900.000 Selenium 0.008 1.733 1.440 Silver 0.369 6.370 5.215 Sulfate 1525.424 27500.000 22500.000

TDS 3050.847 55000.000 45000.000

Thallium 0.012 0.220 0.180 Zinc 0.212 0.212 0.212 Phenol * 1372.899 * Most Stringent Limitation at Springdale WWTP Pollutants of Concern Springdale (mg/L) Springdale Phase 2 (mg/L) Springdale Phase 1 (mg/L) Most Stringent Local Limit (mg/L) Aluminum * * 22.000 22.000 Antimony * * 0.660 0.660 Arsenic 1.684 0.251 1.114 0.251 Asbestos * * None * Barium * * 216.941 216.941 Beryllium * * 0.440 0.440 Cadmium 0.752 0.096 1.261 0.096 Chloride * * 27500.000 27500.000 Chromium 6.106 0.808 26.596 0.808 Copper 0.109 0.109 24.601 0.109 Pollutants of Concern Springdale (mg/L) Springdale Phase 2 (mg/L) Springdale Phase 1 (mg/L) Most Stringent Local Limit (mg/L) Cyanide 0.580 0.139 0.569 0.139 Fluoride * * 433.217 433.217 Iron * * 6.693 6.693 Lead 0.116 0.116 0.116 0.116 Manganese * * 3.186 3.186 Mercury 0.0020 0.0020 0.497 0.0020 Molybdenum 1.406 0.203 1.300 0.203 Nickel 5.752 0.053 6.030 0.053 Nitrate * * 1100.000 1100.000 Nitrite * * 110.000 110.000 Total NO3 + NO2

* * 1100.000 1100.000 Selenium 2.177 0.263 1.733 0.263 Silver 6.514 0.849 6.370 0.849 Sulfate * * 27500.000 27500.000

TDS * * 55000.000 55000.000

Thallium * * 0.220 0.220 Zinc 0.212 0.212 0.212 0.212 Phenol 194.724 24.987 1372.899 24.987

(f) The general manager may issue permits specifying concentration limits greater than the local limits in the sewer use ordinance (SUO) based on special agreements with the authority, provided that all applicable state and/or federal categorical pretreatment requirements are met and provided that treatment plant headworks loadings are not violated. The permission to exceed concentration limits will be revoked if local treatment plant mass loadings are exceeded. The

authority may levy surcharge for the treatment of such waste. Additional testing requirements will be necessary for an industry which seeks permission to exceed concentration limits and may include testing of the waste treatment plant influent and effluent as well as the user's own effluent.

The costs associated with such testing will be paid by the user for the parameter they seek permission to exceed.

(g) The authority reserves the right to modify the industrial discharge limits and conditions at the time of the permit renewal. Industrial users requesting a permit variance must do so at least sixty (60) days prior to the expiration of their discharge permit.

(h) Any person, upon written application to the authority, who shows, in the case of the activity being conducted or operated, that compliance with a section of these rules should either be impossible or would constitute an undue hardship

because of time limitations may be granted a variance. If a variance is granted by the authority, it shall be only for such reasonable period of time as determined by the authority under the specified conditions set by the authority. In the event that the person to whom the variance is granted

fails to comply with the specifications of the authority within the time set, the authority shall have the right to revoke the variance granted and terminate all service (water and sewer) to the customer until all requirements of the authority have been complied with. A variance shall not be granted under the provisions of this section where the person applying, therefore, is causing a nuisance or other injury to the public. Any variance granted under the provisions of this section shall

not relieve the person receiving the variance from any liability or penalties imposed by law for the commission or maintenance of a public nuisance.

(i) Should a customer (user) be found to be in violation of the restrictions on public sewer use as provided in this article, the authority may take appropriate action to terminate the customer's water and sewer service until such time as the violation is abated and payment is made to the authority for any damages caused thereby to the sewerage system.

(j) Should any person who is not a customer of the authority be found in violation of the restrictions on public sewer use as provided in this article, the authority may take appropriate action

to have civil and/or criminal action taken against said person violating the terms of this article.

(Ord. No. 01-09, Art. 5, 12-03-2001) Sec. 3-5-269. Protection from damage.

(a) No unauthorized person shall maliciously, willfully, or negligently break, damage, destroy, uncover, deface, or tamper with any structure, appurtenance, or equipment which is a part of the sewage works. Any person violating this provision shall be subject to immediate arrest for violation of laws of the state.

(b) Any person violating this section shall become liable to the authority for any loss, damage, or expense incurred by the authority including,

but not limited to, all costs of labor, material expenses, loss of income, attorney's fees, expert witness fees, court costs, surveying/engineering expenses and any out of pocket funds expended by the authority, by reason of such violation and shall be punished as hereinafter provided.

(Ord. No. 01-09, Art. 9, 12-03-2001) Sec. 3-5-270. Amendments.

The authority does hereby reserve the right to amend this article in cases of emergency, in cases in which the authority is required to adopt immediate rules or regulations to comply with federal, state or regulatory agency rules, regulations, and

laws, and in those portions of this article that apply to construction, operation and maintenance of the water and sewer system of Henry County without notice and without consent of the Board of Commissioners of Henry County. Except as set forth above, all other amendments to this article will be made jointly by the authority and the Board of Commissioners of Henry County.

(Ord. No. 01-09, Art. 16, 12-03-2001) Secs. 3-5-271—3-5-275. Reserved.

DIVISION 2. INDUSTRIAL DISCHARGE

PERMITS AND REQUIREMENTS

Sec. 3-5-276. Permit required.

(a) It shall be unlawful for any significant industrial user to discharge industrial wastes to the sewer or the wastewater treatment plant except as authorized by the general manager pursuant to a permit to discharge issued by the authority. All significant industrial users proposing to connect to or contribute to the sewer collection system or wastewater treatment plant

shall obtain a wastewater discharge permit before connecting or contributing wastewater. All existing significant industrial users shall apply for a wastewater discharge permit within ninety (90)

days after the effective date of this ordinance and all proposed new significant industrial users shall apply at least ninety (90) days prior to connecting or contributing wastewater to the wastewater system.

All wastewater discharge permit applications and user reports must be signed by an authorized representative of the user and contain the following certification statement:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with

a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that

there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

(Ord. No. 01-09, Art. 6(a), 12-03-2001) Sec. 3-5-277. Application.

Users required to obtain a wastewater discharge permit shall complete and file an application form prescribed by the authority. In support of the application, the user shall submit, in units

and terms appropriate for evaluation, the following information:

(1) Name, address, and location (if different from the address).

(2) SIC number according to the Standard Industrial Classification Manual, Office of Management and Budget, 1972, as amended.

(3) Wastewater constituents and characteristics including, but not limited to, those mentioned in section 3-5-268 as determined by a reliable analytical laboratory.

(Sampling and analyses shall be performed in accordance with procedures established by the EPA pursuant to section 304(g) of the act and contained in 40 CFR

part 136, as amended. Results collected within the previous year will be acceptable).

(4) Time and duration of contribution.

(5) Average daily and peak wastewater flow rates, including daily, monthly, and seasonal variations, if any.

(6) Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, sewer connections and appurtenances by the size, location, and elevation.

(7) Description of activities, facilities and plant processes on the premises including all materials which are or could be discharged.

(8) Where known, the nature and concentration of any pollutants in the discharge which are limited by county, state, or

federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance and/or additional pretreatment is required for the user to meet applicable pretreatment standards.

(9) If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the

shortest schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard.

(Ord. No. 01-09, Art. 6(b), 12-03-2001) Sec. 3-5-278. Permit appeals.

The general manager shall provide public notice of the issuance of a wastewater discharge permit. Any person, including the user, may petition the general manager to reconsider the terms of a wastewater discharge permit within thirty

(30) days of notice of its issuance. The following conditions shall apply to the appeal process:

(1) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal.

(2) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the wastewater discharge permit.

(3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal.

(4) If the general manager fails to act within thirty (30) days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit shall be considered as a final administrative action.

(5) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint with the Superior Court of Henry County.

(Ord. No. 01-09, Art. 6(c), 12-03-2001) Sec. 3-5-279. Permit modification.

The general manager may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons:

(1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements.

(2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the

time of wastewater discharge permit issuance.

(3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge.

(4) Information indicating that the permitted discharge poses a threat to the POTW, personnel, or the receiving waters.

(5) Violation of any terms or conditions of the wastewater discharge permit.

(6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any

required reporting.

(7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13.

(8) To correct typographical or other errors in the wastewater discharge permit.

(9) To reflect a transfer of the facility ownership or operation to a new owner or operator.

(Ord. No. 01-09, Art. 6(d), 12-03-2001) Sec. 3-5-280. Term of permit.

Wastewater discharge permits will be issued for a term or duration not to exceed five (5) years.

The user must reapply for the permit renewal a minimum of ninety (90) days prior to permit expiration. The authority retains the right to modify allowable discharge limits for specific pollutants if federal or state standards are changed in the interim or for other just cause.

(Ord. No. 01-09, Art. 6(e), 12-03-2001) Sec. 3-5-281. User responsibilities.

The permit will specify the user's responsibilities that shall be required of the user. Failure of the user to comply with the permit requirements

will result in penalties and/or discontinuance of sewerage service. Permits will provide the following information:

(1) Statement of permit duration (in no case more than five (5) years).

(2) Statement of nontransferability without, at a minimum, prior notification to the POTW and provision of a copy of the existing control mechanism to the new owner or operator.

(3) Effluent limits based on applicable general pretreatment standards, federal categorical pretreatment standards, local limits, and state and federal law.

(4) Self-monitoring, sampling, reporting, notification, and record-keeping requirements, including an identification of the pollutants to be monitored, sampling location, sampling frequency, and sample type, based on applicable general pretreatment standards, federal categorical pretreatment standards, local limits, and

state and federal law.

(5) Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend beyond applicable federal deadlines.

In addition, the permit may also contain the following information:

(1) The unit charge or schedule of user's charges and fees for the wastewater to be discharged to a community sewer.

(2) Limits on the average and maximum wastewater constituents and characteristics.

(3) Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization.

(4) Requirements for installation and maintenance of inspection and sampling facilities.

(5) Specifications for monitoring programs, which may include sampling locations, frequency of sampling, number, types, and standards for tests, and reporting schedule.

(6) Requirements for submission of technical reports or discharge reports.

(7) Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the authority,

and affording authority access thereto.

(8) Requirements for notification of the authority of any new introduction of wastewater constituents or any substantial change in the volume or character of the

wastewater constituent being introduced into the wastewater treatment system.

(9) Requirements for notification of slug discharges.

(10) Other conditions as deemed appropriate by the authority to ensure compliance with this article.

(Ord. No. 01-09, Art. 6(f), 12-03-2001) Sec. 3-5-282. Permit specificity.

Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without

prior notification (at a minimum) to the POTW and provision of a copy of the existing control mechanism to the new owner or operator. Any succeeding owner or user shall also comply with the terms and conditions of the existing permit.

(Ord. No. 01-09, Art. 6(g), 12-03-2001) Sec. 3-5-283. Pretreatment facilities.

(a) Industrial users may be required by the general manager to install, in their effluent waste system immediately prior to entrance into the county sewer, a stainless steel automatic mechanically cleaned screen of either a vibration or brush type. The owner must maintain the screening

facility in proper working condition at all times.

(b) Users shall provide necessary wastewater treatment as required to comply with this article and shall achieve compliance with all federal categorical pretreatment standards within the time limitations as specified by the federal pretreatment regulations. Any facilities required to pretreat wastewater to a level acceptable to the authority

shall be provided, operated, and maintained at the user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the authority for review, and shall be prepared by a registered professional engineer before construction of the facility. The review of such plans and operating procedures will in no way relieve the user from the responsibility of modifying the facility as necessary to produce an effluent acceptable to the authority

under the provisions of this article. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to the

authority prior to the user's initiation of the changes. The authority, in no way, shall be responsible for the design or operation of the plant; the review is intended only to ensure compatibility of

the pretreatment system with the POTW.

The industrial user must appoint a State of Georgia certified industrial operator to be in responsible charge of its pretreatment system.

The operator should have a Class III or higher industrial operator license.

"Operator in responsible charge" means any operator who has direct general charge of the day-to-day field operation of a wastewater treatment plant, wastewater collection system, water distribution system, or public water supply system, and who is responsible for the quality of the treated water or wastewater effluent.

"Wastewater treatment" means biological, physical/chemical, or settling processes which remove pollutants from industrial or domestic wastewaters prior to discharge to a stream, sewer, or land.

It includes only those processes permitted by the authority and specifically excludes those processes that consist solely of screening, pH adjustment, sedimentation processes without mechanical solids removal, septic tanks, grease traps, or oil-water separators.

(Ord. No. 01-09, Art. 6(h), (i), 12-03-2001) Sec. 3-5-284. Publication of significant noncompliants.

The authority may annually publish in the local newspaper a notification of the users that were in significant noncompliance with any pretreatment requirements or standards during the previous twelve (12) months. The notification shall summarize any enforcement actions taken against the user(s) during the same twelve (12) months.

(Ord. No. 01-09, Art. 6(j), 12-03-2001) Sec. 3-5-285. Periodic reporting.

The user will be required to submit to the general manager reports indicating the nature and concentration of effluents on a periodic basis.

Specific reporting requirements will be indicated in the user's permit.

(1) Analytical requirements: All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and procedures approved by EPA.

(2) Sample collection:

a. Except as indicated in subsection b, below, the user must collect wastewater samples using flow proportional composite collection techniques.

In the event flow proportional sampling is not feasible, the general manager may authorize the use of time proportional sampling or a minimum of four (4) grab samples where the user demonstrates that this will

provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits.

b. Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques.

(3) Timing: Written reports will be deemed to have been submitted on the date postmarked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall

govern.

(4) Record keeping: Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to monitoring activities required by this article and any

additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the

date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses.

These records shall remain available for a period of at least three (3) years. This period shall be automatically extended for the duration of any litigation concerning the user or the authority, or when the user has been specifically notified of a longer retention period by the general manager.

(Ord. No. 01-09, Art. 6(k), 12-03-2001) Sec. 3-5-286. Additional requirements.

(a) No industry will exceed the pretreatment limits as established by the EPA in accordance with sections 307(b) and (c) of the act (33 USC 1347) which applied to a specific category of industrial users.

(b) No user shall ever increase the use of process water or in any other way dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with a

pretreatment standard or requirement. The authority may impose mass limitations on industrial users who are using dilution to meet applicable pretreatment standards or requirements or in other cases where the imposition of mass

limitations is appropriate.

(Ord. No. 01-09, Art. 6(l), (m), 12-03-2001) Sec. 3-5-287. Reports of changed conditions.

(a) Each user must notify the general manager of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least ninety (90) days before the change.

(1) The general manager may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 3-5-277.

(2) The general manager may issue a wastewater discharge permit under section 3-5- 280 or modify an existing wastewater

discharge permit in response to changed conditions or anticipated changed conditions.

(3) For purposes of this requirement, significant changes include, but are not limited to, flow increases of twenty (20) percent or

greater, and the discharge of any previously unreported pollutants.

(Ord. No. 01-09, Art. 6(n), 12-03-2001) Sec. 3-5-288. Confidentiality.

Information and data on a user obtained from reports, questionnaires, permit applications, permits and monitoring programs, and inspections shall be available without restriction unless the

user contends such information and data constitutes a trade secret, in which case the information may be withheld from the general public. The

effluent data will never be considered as confidential information. Information accepted by the authority as confidential portions of a report which might disclose trade secrets or secret processes,

shall be available for review by a governmental agency, when required to document compliance with the pretreatment program. In matters of judicial review or enforcement proceedings against an industrial user, the authority shall provide all available information pertaining to that industry to the reviewing court or governmental agency.

(Ord. No. 01-09, Art. 6(o), 12-03-2001) Sec. 3-5-289. Monitoring facilities and flow measurement.

The authority shall require to be provided and operated at the user's own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user's premises, but the authority may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located

so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user.

(Ord. No. 01-09, Art. 6(p), 12-03-2001) Sec. 3-5-290. New standards; notification.

Upon the promulgation of the federal categorical pretreatment standards for a particular industrial subcategory, the federal standard, if more stringent than limitations imposed under this

article for sources in that subcategory, shall immediately supersede the limitations imposed under this article. The general manager shall notify all affected users of the new standard and applicable reporting requirements.

When the authority's wastewater treatment system achieves consistent removal of pollutants limited by federal pretreatment standards, the authority may apply to the state for modification of specific limits in the federal pretreatment standards. "Consistent removal" shall mean reduction in the amount of a pollutant or alteration of the

nature of the pollutant by the wastewater treatment system to a less toxic or harmless state in the effluent which is achieved by the system and

ninety-five (95) percent of the samples taken when measured according to the procedures set forth in section 403.7(c)(2) (or title 40 of the Code of Federal Regulation, part 403) "General Pretreatment Regulations for Existing and New Sources of Pollution" promulgated pursuant to the act.

The authority may then modify pollutant discharge limits in the federal pretreatment standards if the requirements contained in 40 CFR part 403, section 403.7, are fulfilled and prior

approval from the authority is obtained.

(Ord. No. 01-09, Art. 6(q), 12-03-2001) Sec. 3-5-291. National categorical pretreatment standards.

The categorical pretreatment standards found at 40 CFR chapter I, subchapter N, parts 405 through 471 are hereby incorporated.

(1) When a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the general manager may impose equivalent concentration or

mass limits in accordance with 40 CFR Part 03.6(c).

(2) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the general manager shall impose an alternate limit using the combined waste stream formula in 40 CFR Part 403.6(e).

(3) A user may obtain a variance from a categorical pretreatment standard if the user can prove, pursuant to the procedural and substantive provisions in 40 CFR Part 403.13, that factors relating to

its discharge are fundamentally different from the factors considered by EPA when developing the categorical pretreatment standard.

(4) A user may obtain a net gross adjustment to a categorical standard in accordance with 40 CFR Part 403.15.

(Ord. No. 01-09, Art. 6(r), 12-03-2001) Sec. 3-5-292. Baseline monitoring reports.

(a) Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR Part 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit

to the general manager a report which contains the information listed in paragraph (b), below. At least ninety (90) days prior to commencement of their discharge, new sources and sources that become categorical users subsequent to the promulgation of an applicable categorical standard shall submit to the general manager a report

which contains the information listed in paragraph (b) (1) to (5), below. A new source shall report the method of pretreatment it intends to

use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.

(b) Users described above shall submit the information set forth below.

(1) Identifying information: The name and address of the facility, including the name of the operator and owner.

(2) Environmental permits: A list of any environmental control permits held by or for the facility.

(3) Description of operations: A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include

a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.

(4) Flow measurement: Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams

and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e).

(5) Measurement of pollutants:

a. The categorical pretreatment standards applicable to each regulated process.

b. The results of sampling and analysis identifying the nature and concentration, and/or mass, when required by the standard or by the general

manager, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, when required, shall be reported. The sample shall

be representative of daily operations and shall be analyzed in accordance with accepted procedures.

c. Sampling must be performed in accordance with procedures provided in article 3-5-285(2).

(6) Certification: A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if

not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements.

(7) Compliance schedule: If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the

compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in the

ensuing section.

(8) Signature and certification: All baseline monitoring reports must be signed and certified.

(Ord. No. 01-09, Art. 6(s), 12-03-2001) Sec. 3-5-293. Compliance schedule progress reports.

The following conditions shall apply to the compliance schedule:

(1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation

of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer,

completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation).

(2) No increment referred to above shall exceed nine (9) months.

(3) The user shall submit a progress report to the general manager no later than fourteen (14) days following each date in the schedule and the final date of compliance

including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule.

(4) In no event shall more than nine (4) months elapse between such progress reports to the general manager.

(Ord. No. 01-09, Art. 6(t), 12-03-2001) Sec. 3-5-294. Reports on compliance with categorical pretreatment standard deadline.

Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the general manager a report containing the information described in

section 3-5-292(b)(4) through (6). For users subject to equivalent mass or concentration limits established in accordance with the procedures in

40 CFR Part 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified.

(Ord. No. 01-09, Art. 6(u), 12-03-2001) Sec. 3-5-295. Periodic compliance reports.

(a) All significant industrial users shall, at a frequency determined by the general manager, but in no case less than two (2) times per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with section

3-5-276.

(b) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in

good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of

its discharge.

(c) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the general manager,

using the procedures prescribed in this article, the results of this monitoring shall be included in the report.

(Ord. No. 01-09, Art. 6(v), 12-03-2001) Sec. 3-5-296. Notice of violation; repeat sampling and reporting.

If sampling performed by a user indicates a violation of wastewater discharge limitation, the user must notify the general manager within twenty-four (24) hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the authority within thirty (30) days after becoming aware of the violation. The user is not required to resample if the authority resamples between the user's initial sampling and when the user receives the results of this sampling or if the authority performs sampling at the industrial user's facility at a frequency of at least once per month.

(Ord. No. 01-09, Art. 6(w), 12-03-2001) Sec. 3-5-297. Accidental discharge.

Each industrial user shall provide protection from accidental discharge or slug loading of prohibited materials or other substances regulated by this division. A slug discharge is any discharge

of a non-routine, episodic nature, including, but not limited to, an accidental spill or a noncustomary batch discharge. Facilities to prevent accidental discharge or slug loading of prohibited

materials shall be provided and maintained at the owner's or user's own cost and expense. Detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the authority for review before construction of the facility. The authority shall evaluate all industrial users for the need for developing a slug discharge plan at least every two (2) years. Industrial users shall complete such a plan within ninety (90) days after being notified by the authority. No user shall be permitted to introduce pollutants into the system until accidental discharge or slug control procedures have been approved by the authority. A slug control plan shall contain (at a minimum) the following elements:

• Description of discharge practices, including non-routine batch discharges.

• Description of stored chemicals.

• Procedures for immediately notifying the POTW of slug discharges, including any discharge that would violate a prohibition under section 3-5-268(d) with procedures for follow-up written notification within five (5) days.

• If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading opera-

tions, control of plant site runoff, training of workers, building of containment structures or equipment, measures for containment of toxic organic pollutants (including solvents), and/or measures and equipment for emergency response.

Review of such plans and operating procedures shall not relieve the industrial user from the responsibility to modify the user's facility as necessary to meet the requirements of this article. In the case of an accidental discharge or slug loading, it is the responsibility of the user to immediately telephone and notify the authority of the incident. The notification shall include location of

discharge, type of waste, concentration and volume, and corrective actions.

(1) Written notice: Within five (5) days following an accidental discharge or slug loading, the user shall submit to the general manager a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability

which may be incurred as a result of damage to the wastewater system, fish kills, or any other damage to person or property; nor shall such notification relieve the user of any fines, civil penalties, or other liability which may be imposed

by this article or other applicable law.

(2) Notice to employees: A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees whom to call in the event of a dangerous discharge. Employers shall ensure that all employees who may cause to occur or suffer such a dangerous discharge to occur are advised of the emergency notification procedure.

(3) Upset:

a. For the purposes of this section, "upset" means an exceptional incident in which there is unintentional and

temporary noncompliance with categorical pretreatment standards or the local limits because of factors

beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless

or improper operation.

b. An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical

pretreatment standards if the requirements of subsection c below are met.

c. A user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence, that:

1. An upset occurred and the user can identify the cause(s) of the upset.

2. The facility was at the time being operated in a prudent manner and in compliance with applicable operation and maintenance procedures.

3. The user has submitted the following information to the general manager within twentyfour (24) hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five (5) days).

i. A description of the indirect discharge and cause of the indirect discharge and cause of noncompliance.

ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue.

iii. Steps being taken and/or planned to reduce, elimiPUBLIC WORKS § 3-5-297 nate, and prevent recurrence of the noncompliance.

4. In any enforcement proceeding, the user seeking to establish the occurrence of an upset shall have the burden of proof.

5. Users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action

brought for noncompliance with categorical pretreatment standards.

6. Users shall control production of all discharges, to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternate method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the

treatment facility is reduced, lost, or fails.

(4) Prohibited discharge standards. A user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general prohibitions of this article or the specific prohibitions if it can prove that it did not know, or have reason to know, that its discharge,

alone or in conjunction with discharges from other sources, would cause pass through or interference and that either:

a. A local limit exists for each pollutant discharged and the user was in compliance with each limit directly prior to, and during, the pass through or

interference; or

b. No local limit exists, but the discharge did not change substantially in nature or constituents from the

user's prior discharge when the authority was regularly in compliance with its NPDES permit, and in the

case of interference, was in compliance with applicable sludge use or disposal requirements.

(5) Bypass:

a. For the purposes of this section:

1. "Bypass" means the intentional diversion of waste streams from any portion of a user's treatment facility.

2. "Severe property damage" means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property

damage does not mean economic loss caused by delays in production.

b. A user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for

essential maintenance to ensure efficient operation.

1. If a user knows in advance of the need for a bypass, it shall submit prior notice to the general manager, at least ten (10) days before the date of the bypass, if possible.

2. A user shall submit oral notice to the general manager of an unanticipated bypass that exceeds applicable pretreatment standards within twenty-four

(24) hours from the time it becomes aware of the bypass. A written submission shall also

be provided within five (5) days of the time the user becomes aware of the bypass. The written submission shall contain a description of the bypass and

its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or

planned to reduce, eliminate, and prevent reoccurrence of the bypass. The general manager may waive the written report on a case-by-case basis if the oral report has been received within twenty-four (24) hours.

3. The general manager may take an enforcement action against a user for a bypass, unless:

i. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage.

ii. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering

judgment.

iii. The industrial user submitted notices as required in subsection(5)b.2.

(Ord. No. 01-09, Art. 6(x), 12-03-2001) Sec. 3-5-298. Feasibility study and construction expenses.

(a) Any owner/developer desiring sewer service to his or her property shall deliver to the authority a plat of survey of the property to be

sewered along with a letter setting forth the intended use or uses of the property. The authority shall review said documents and with the assistance of the authority's engineer determine

the costs to be incurred to perform the necessary engineering studies and requirements of carrying the sewer from the owner/developer's property to the authority's nearest existing facility having sufficient capacity to process the sewage to be generated from said property. Once said costs have been determined, the general manager shall notify owner/developer, and owner/developer shall deposit said funds with the authority. After said funds have been deposited with the authority and the authority's engineer has commenced with the Sewerage Feasibility Study, said funds shall become nonrefundable. The results of the completed study shall be provided to the owner/developer.

(b) The owner/developer of the property will be required to construct, at his or her own expense, any and all sewer lines and sewerage facilities that are located on the owner/developer's property that are determined by the authority to be needed for the adequate sewering of said property

or that are required to service owner/developer's property.

(c) The owner/developer may, with prior authorization from the authority, employ its own contractor to construct the sewer lines from owner/ developer's property to the authority's nearest

facilities having capacity to process the sewage generated from said property. The sewer lines appurtenances thereto, and other facilities required, will be constructed according to the specifications of the authority and will be inspected by the authority prior to covering. If the authority

allows the owner/developer to employ its own contractor, then said contractor shall deliver to the authority prior to commencement of work a certificate of insurance which will insure and protect the authority from all claims of damage to person or property occurring as a result of said construction. The amount of insurance shall be set by the general manager.

(Ord. No. 01-09, Art. 6(y—aa), 12-03-2001) Sec. 3-5-299. Easement acquisition.

(a) If the authority determines that it is in the best interest of the authority to enlarge the sewer lines and sewerage system facilities from the owner/developer's property line to the sewerage system facilities, the authority will pay the additional costs for the increased size of sewer line and sewer facilities.

(b) The owner/developer shall make a good faith effort to obtain all easements required to install the sewer lines and sewerage system facilities from the owner/developer's property to authority's facility. In the event an owner/developer is unable to obtain the sewer easements required, said owner/developer shall notify the

authority in writing. The authority will then determine the anticipated cost for condemning the easements required and notify the owner/ developer in writing. Upon the owner/developer depositing with authority the estimated costs, the authority will authorize its attorney to proceed with condemnation of the easement. If the costs as hereinafter defined exceed the amount estimated by the authority, the owner/developer shall pay to the authority the additional costs within

ten (10) days from receipt of notification. Failure to pay said funds within said time will result in the authority placing a fi.fa. on owner/developer's property. If estimated costs paid to the authority do not exceed the actual cost incurred, the excess funds will be returned to the person initially paying said funds within thirty (30) days after date of determination of actual costs involved.

Costs referred to above shall include, but not be limited to, the amount paid by the authority for the easement or title to property, all attorney's fees, expert witness fees, court costs, litigation expenses, survey and engineering expenses, and any out-of-pocket funds expended by the authority.

(c) The authority will employ its own surveyor or engineer to survey the property on which the easement or title to property is required to carry the sewer line from owner/developer's property to authority's existing facility. An estimated cost of such expense will be provided by the general manager to the owner/developer in writing, and the owner/developer shall deposit said funds with the authority. Upon receipt of said estimated costs, the authority will proceed to survey said property and have said easements prepared by the authority's attorney. If the costs as hereinafter defined exceeds the amount estimated by the authority, owner/developer shall pay to the authority the additional costs within ten (10) days from receipt of notification. Failure to pay said

funds within said time will result in the authority placing a fi.fa. on owner/developer's property. If estimated costs paid to the authority do not exceed the actual costs incurred, the excess funds will be returned to the person initially paying said funds within thirty (30) days after date of determination of actual costs involved. Costs referred to above shall include, but not be limited to, the

amount paid by the authority for the easement or title to property, all attorney's fees, expert witness fees, court costs, litigation expenses, surveying and engineering expenses, and any out-of-pocket funds expended by the authority.

(Ord. No. 01-09, Art. 6(bb—dd), 12-03-2001) Sec. 3-5-300. Removal, transportation, and disposal of scavenger wastes.

(a) The authority may require a formal permit for the discharge of scavenger wastes after submission of an application on forms supplied by the county. All other materials and substances, chemicals or chemical compounds, and/or industrial wastes will not be permitted to be discharged into

the public sewerage system except as heretofore provided.

(b) The discharge of the wastes in subsection

(a) above and trucked or hauled pollutants shall be made only at a location in the sewage treatment plant as shall be designated by the general manager.

(c) Scavenger wastes will be admitted into the sewerage system only by permit and subject to payment of fees or fixed charges. The fee or charge shall be based on the full capacity of each scavenger vehicle for each discharge.

(d) The applicant shall be the owner of the vehicle discharging the wastes. Any false, misleading, or untruthful statements as to the nature of the material shall be cause for termination of any

further discharge from the applicant.

(e) Discharges in subsection (a) above may also be suspended or terminated at any time by the general manager for willful, continued, or persistent violations of these rules and regulations.

(f) All equipment, such as trucks, tanks, pumps, and hoses used in the collection and/or transportation of scavenger wastes shall be modern equipment in good condition. When more than one (1) vehicle is used by an applicant, each vehicle shall

bear an identifying number.

(g) All applicants for a permit shall furnish the following information with each application:

(1) Name and address of applicant.

(2) Volume of scavenger waste for each numbered vehicle.

(3) Number of scavenger vehicles in collection service.

(Ord. No. 01-09, Art. 7, 12-03-2001) Sec. 3-5-301. Powers and authority of inspector testing.

(a) Search warrants and orders from superior court. If the general manager has been refused access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the authority designed to verify compliance with this article any permit or order issued hereunder, or to protect the overall public health, safety, and welfare of the community, the general manager may seek issuance of a search warrant or order from the Superior Court

of Henry County.

(b) While performing the necessary work on private properties referred to in subsection (a) above, any claims resulting from injury or death to the general manager or duly authorized employees of the authority shall be compensated by the company when there is negligence on the part

of the company.

(c) Right of entry; inspection and sampling.

The general manager or his or her representative shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this article and any wastewater discharge permit or order issued hereunder. Users shall allow the general manager or his representative ready access to all parts of the

premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties.

(1) When a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the general manager or his or her representative will be permitted to

enter without delay for the purposes of performing specific responsibilities.

(2) The general manager or his or her representative shall have the right to set up on the user's property, or require installations of, such devices as are necessary to conduct sampling and/or metering of the

user's operation.

(3) The general manager or his or her representative may require the user to install monitoring equipment as necessary. The

facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by

the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated (once a month) to ensure their accuracy.

(4) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the general manager or his or her representative and shall not be replaced. The costs of clearing such access shall be born by the user.

(5) Unreasonable delays in allowing the general manager or his or her representative access to the user's premises shall be a

violation of this article.

(d) At the order of the general manager, all persons discharging wastewater into the authority's sewer system shall have their discharge tested by an authority-approved independent testing laboPUBLIC WORKS § 3-5-301 ratory at said person's expense at a frequency

specified by the general manager at his or her discretion.

(e) In the event of a violation of any provision of this article, the general manager shall have the authority to terminate water and sewer services to the violator until such violations have been brought into compliance.

(f) The general manager shall have the right to assess and collect fines and restitution penalties authorized by this article, and shall have the right to terminate water and sewerage services as set forth in paragraph (e) above, until all fines and restitution costs have been paid.

(g) The clerk of the authority shall have the right to issue fi.fas. for the collection of fines, fees and restitution costs for damages due to the

authority.

(Ord. No. 01-09, Art. 8, 12-03-2001) Sec. 3-5-302. Sewerage fees and rates.

(a) Henry County as a whole shall be considered one sewerage district. The authority, from time to time, shall review and set all impact fees,

connection fees, sewerage user fees, surcharges and penalties which they deem reasonable and financially appropriate.

(b) Impact fees, as that term is defined by the Impact Fee Ordinance of Henry County, shall be set from time to time by the authority, and governed by said ordinance.

(c) The impact fee is set at the time of connection on to the sewerage system and based on the present anticipated usage. The authority from

time to time will determine whether or not the customer is using more capacity in the sewage treatment plant and the sewer lines than was originally purchased. If the authority determines that there is an increase in usage by the customer, the authority will assess additional impact fees based on the impact fee rate that is in existence at the time of the determination by the authority.

The customer shall notify the authority thirty

(30) days prior to the commencement of any additions to the customer's present facilities to determine if sewage treatment facilities and sewage facilities are available and have adequate capacity to accommodate the anticipated additional usage.

(d) A connection fee is charged to the customer for connection to the authority's sewerage system.

The connection fee shall be set from time to time by the authority.

(e) A sewerage user fee is charged to the customer on a monthly basis for the sewage processed by the authority. The sewerage user fee is set by the authority from time to time. The

authority will charge a minimum monthly charge to all sewer users.

(f) The authority from time to time may set and collect additional fees and surcharges as it deems appropriate.

(g) The authority from time to time may set and collect deposits from customers. Any deposit so collected will be deposited in the general operating account and used for the operation of the authority. The authority shall not be required to

pay interest on any deposit collected. Upon termination of services, the deposit shall be applied to any balance owed to the authority, and the balance of any deposit, if any, shall be returned to the customer within ninety (90) days of termination

of services.

(h) If the payment of the sewer fees or any surcharge assessed is allowed to go into default by the customer, the authority may take appropriate action to terminate the customer's water and sewer service until all sums due the authority, including penalties, are paid in full.

(i) The authority shall from time to time review the fees set forth above and adjust same as may be necessary to defray operational and maintenance costs and provide for financial capitalization including replacements and other system improvements. The authority shall have the right

from time to time to increase or decrease any sewer fees or sewer rates charged by it without further approval of the board of commissioners of the county.

(j) Except as otherwise negotiated and approved, the authority reserves the right to refuse sewer service to any person not using authority

water.

(Ord. No. 01-09, Art. 10, 12-03-2001) Sec. 3-5-303. Construction and extension of sewer lines.

(a) Prior to construction or extension of any sewer line, a property owner shall prepare and deliver to the authority for review and approval plans of the proposed sewer line. At a minimum, the plans for the proposed sewer line shall show:

(1) The line's proximity to existing sewer lines;

(2) The location of the sewer line;

(3) The location of all outfalls;

(4) The location of all interceptors;

(5) The estimated amount of sewerage to be processed on a day-to-day basis and the capacity of the sewer lines to be installed;

(6) Such other information as is required by the authority from time to time.

(b) Any plans submitted to the authority for review and approval shall be prepared by a registered engineer.

(c) All gravity flow sewer lines constructed in Henry County shall have a minimum diameter of eight (8) inches.

If the general manager desires to enlarge the diameter of a sewer line to better serve the drainage basin, the authority or its designee shall determine the routing for said line and shall install it. In such an event, the authority shall estimate the cost of an eight-inch line (not including unfit soil and rock) and shall deliver said estimate to the developer. Upon receipt, the developer shall pay the estimate of cost for the eight-inch line within thirty (30) days of receipt.

(1) If rock and/or unfit soil is encountered by the authority during installation of the enlarged line, the developer will pay the increased cost caused by said soil or rock within thirty (30) days of receipt of a bill from the authority.

(d) Property owners desiring to extend lines to existing authority sewer lines shall be responsible for paying all costs of the line extension. Further, it shall be the responsibility of the property owner to build within the property to be served, sewerage lines according to the specifications of the authority.

(Ord. No. 01-09, Art. 11, 12-03-2001) Sec. 3-5-304. Industrial waste surcharges.

(a) If the authority authorizes any customer to discharge industrial wastes into the public sewers, said customer shall be charged and assessed a surcharge in addition to any sewer service

charges, if these wastes have a concentration greater than the following concentrations:

(1) A five-day, twenty-degree Celsius biochemical oxygen demand (BOD5) concentration of three hundred (300) milligrams per liter (mg/L), which is also referred to

as parts per million (ppm).

(2) A total suspended solids (TSS) concentration of three hundred (300) mg/L.

(3) For wastewater discharging to a treatment plant where nitrification is required, a Total Kjeldahl Nitrogen (TKN) and/or ammonia (NH3-N) of two (2) mg/L

(separately or in combination).

(4) For wastewater discharging to a treatment plant where phosphorous removal is required, phosphorous and/or phosphorous compounds (as P) of twenty-five (25) mg/L.

The above constituents shall be sampled and analyzed in accordance with Standard Methods for the Examination of Water and Wastewater or other analytical procedure approved by the U.S.

EPA or the regulatory agency of the state having jurisdiction. The surcharge shall be based on an average of at least three (3) twenty-four-hour composite samples (or composite samples during the daily discharge) or based on an average of at least six (6) grab samples taken at different hours of operation over at least a three-day period.

Where different processes are used or different products are manufactured, the highest strength discharge over a five-day period, as sampled above, shall be used as the basis of the surcharge. The amount of such surcharge, which may be charged and assessed against persons discharging industrial waste into the public sewers, shall reflect the cost incurred by the authority in handling the

excess of the previously listed constituents. This surcharge shall include a proportionate share of the operational and maintenance costs and replacement costs on the portions of the plant and affected sewerage system and other incidental

expenses (monitoring, testing, and other) including salaries and other administrative expenses.

(b) When any or all of the total suspended solids, BOD, phosphorous, TKN, or ammonia of the wastewater accepted for admission to the authority's sewerage works exceeds the aforementioned values of these constituents, the excess concentration in any or all, as the case may be,

shall be subject to a surcharge on the amount derived in accordance with the following formula:

Amount of surcharge in dollars = (pounds of excess constituent) × (prorated facility replacement cost per excess pound + prorated operational, maintenance, and incidental costs per excess pound).

Excess poundage shall be calculated as follows:

(Wastewater discharged in MGD × excess concentration in mg/L × 8.34 lbs/gallons) Example:

1 MGD of wastewater 200 mg/L excess BOD (500 mg/L − 300 mg/L) Excess poundage = 1 MGD × 200 × 8.34 = 1,668 pounds

(c) The rates of surcharges shall be reviewed annually by the authority in order that the above factors may correctly represent current treatment costs and may be modified at any time. The current surcharge rates are available at the authority.

(d) Industrial waste surcharges provided for in this article shall be prepared and rendered with the regular water and sewerage bill. The manager or other duly authorized employee of the authority shall be permitted to enter any property for the purpose of inspection, observation, measuring, sampling, and testing in accordance with the provisions of this article.

(e) The volume of flow used to compute industrial waste surcharges shall be based on metered, estimated, or prorated water consumption as shown

in the records of meter reading maintained by the authority. In the event that a person discharging waste into the public sewerage system produces evidence to the manager that a significant portion of the total annual volume of water used for all purposes does not reach the public sewer system, an estimated percentage of total water consumption to be used in computing charges may be agreed on between the manager and persons

discharging industrial wastes into the sewer.

(f) The industrial waste of each person, corporation, or legal entity discharging into the public sewerage system shall be subject to annual inspection and determination of character and concentration of said waste; such action may be made more often as may be deemed necessary by the

authority. Samples shall be collected in such a manner as to be representative of the actual quality of the waste. The laboratory methods used in examination of said waste shall be those set forth in Standard Methods for the Examination of Water and Wastewater.

(g) In the event that an analysis of waste, determined by the sampling and gauging of waste from a person or industry by the authority is disputed, a program of resampling and gauging, with subsequent chemical determinations, may be instituted as follows:

(1) The person or industrial user interested must submit a request for resampling and gauging of its waste to the manager by letter and bind itself to bear the expenses incurred by the authority in the resampling and gauging the subsequent chemical determination of the waste.

(2) The chemist or engineer employed by the company or person responsible for the request submitted to the authority must confer with the authority's person in charge of gauging and sampling. He or she will establish the length of the return and the methods to be employed to determine the flow and to sample the flow.

(3) The chemist or engineer engaged by the person or industry may be present during the gauging and sampling operation and also in the laboratory during the determination of the analysis.

(4) The results of the analysis, determined from the quantity and quality of the flow, shall be considered by analysis of record and shall be used to establish current billing procedures.

(Ord. No. 01-09, Art. 12, 12-03-2001) Secs. 3-5-305—3-5-310. Reserved.

DIVISION 3. PENALTIES AND REMEDIES

Sec. 3-5-311. Administrative remedies.

(a) Notification of violation. When the authority finds that any industrial user has violated or is violating this article, or a wastewater permit or

order issued hereunder, the authority may serve upon said user written notice of the violation.

Within ten (10) days of the receipt date of this notice, an explanation of the violation and a plan for the satisfactory correction and prevention thereof, to include specific required actions, shall be submitted to the authority. Submission of this plan in no way relieves the user of liability for any violations occurring before or after receipt of the notice of violation.

(b) Consent orders. The general manager is hereby empowered to enter into consent orders, assurances of voluntary compliance, or other similar documents establishing an agreement with the industrial user responsible for the noncompliance. Such orders will include specific action to be taken by the industrial user to correct the noncompliance within a time period also specified by the order. Consent orders shall have the same

force and effect as the compliance orders issued pursuant to subsection (d) below.

(c) Show-cause order. The general manager may order any industrial user which causes or contributes to a violation of this article or wastewater permit or order issued hereunder, to show cause why a proposed enforcement action should

not be taken. Notice shall be served on the user specifying the time and place for the meeting, the proposed enforcement action, the reasons for such action, and a request that the user show cause why this proposed enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least ten (10) days prior to the hearing. Such notice may be served on any principal executive, general partner, or corporate officer. Whether or not a duly notified industrial user appears as noticed, immediate enforcement action may be pursued.

(d) Compliance order. When the general manager finds that an industrial user, has violated or continues to violate this article or a permit or

order issued thereunder, he or she may issue an order to the industrial user responsible for the discharge directing that, following a specified time period, sewer service shall be discontinued unless adequate treatment facilities, devices, or other related appurtenances have been installed and are properly operated. Orders may also contain such other requirements deemed reasonably necessary and appropriate to address the noncompliance, including the installation pretreatment technology, additional self-monitoring, and management practices.

(e) Cease-and-desist orders. When the general manager finds that an industrial user has violated or continues to violate this article or any permit or order issued hereunder, the general

manager may issue an order to cease and desist all such violations and direct those persons in noncompliance to do one of the following:

(1) Comply with the order.

(2) Take appropriate remedial or preventive action needed to properly address a continuing or threatened violation, including halting operations and terminating the

discharge.

(Ord. No. 01-09, Art. 13, § 13.1, 12-03-2001) Sec. 3-5-312. Termination of service.

(a) Termination for cause.

(1) The general manager and his designees are hereby authorized to terminate water and sewerage services to customers who violate any provision of this article.

(2) The following procedures shall be followed prior to termination of water and sewerage services:

a. The authority, through its employees, shall forward to each violating customer notice of the violation of

which the customer has been charged.

The notice shall state the cutoff date on which the water and sewerage services will be cut off if the violation is not remedied by that date.

b. If a violating customer has not cured the violation by the date shown on the notice, the authority will cut off water and sewerage service. The general manager or his designee is authorized to direct personnel of the authority to terminate water and

sewerage services without notice to any customer that the general manager has reason to believe is willfully violating this article.

c. Once service has been discontinued, a customer can re-establish service by remedying the violation and paying the total amount due the authority in fees, fines, restitution and penalties together with any other applicable charges.

d. If a customer disputes violation of the article, the customer may request a hearing. A request for hearing may be made as follows:

1. In writing, addressed to the general manager and mailed to the authority at 1695 Highway 20

West, McDonough, Georgia 30253;

2. In writing, addressed to the general manager and delivered to the authority at 1695 Highway

20 West, McDonough, Georgia 30253; or

3. By contacting the general manager by telephone during normal business hours at (770) 957- 6659.

e. A hearing date and time will be set.

The general manager or his designee shall conduct the hearing and determine whether a violation of the article has occurred. If a violation is found, the same shall be cured by

4:30 p.m. on the following business day. If the violation is not cured by said date and time, water and sewerage services shall be terminated.

(b) Emergency termination of service. The general manager may immediately suspend a user's discharge and water use, after informal notice to

the user, whenever such suspension is necessary to stop an actual or threatened discharge which reasonably appears to present or cause an imminent or substantial endangerment to the health or welfare of persons. The general manager may

also immediately suspend a user's discharge and water service, after notice and opportunity to respond, that threatens to interfere with the operation of the POTW, or which presents, or may present, an endangerment to the environment.

(1) Any user notified of a suspension of its discharge shall immediately stop or eliminate its contribution. In the event of a user's failure to immediately comply voluntarily with the suspension order, the general manager may take such steps as

deemed necessary, including immediate severance of water and sewer connection, to prevent or minimize damage to the POTW or its receiving stream or endangerment to any individuals. The general manager may allow the user to recommence its discharge when the user has demonstrated to the satisfaction of the

general manager that the period of endangerment has passed, unless the termination proceedings in section 3-5-312(c) of this article are initiated against the user.

(2) A user that is responsible, in whole or in part, for any discharge presenting imminent endangerment shall submit a detailed written statement describing the causes of the harmful contribution and

the measures taken to prevent any future occurrence to the general manager prior to the date of any show-cause or termination hearing.

(3) Nothing in this section shall be interpreted as requiring a hearing prior to any emergency suspension under this section.

(c) Termination of discharge. The authority may revoke a wastewater discharge permit for good cause, including, but not limited to, the following reasons. Such user will be notified of the proposed termination of its discharge and be offered an opportunity to show cause why the proposed action should not be taken. Exercise of this option by the general manager shall not be a bar to, or a prerequisite for, taking any other action against the user.

(1) Violation of wastewater discharge permit conditions;

(2) Failure to accurately report the wastewater constituents and characteristics of its discharge;

(3) Failure to report significant changes in operations or wastewater volume, constituents, and characteristics prior to discharge;

(4) Refusal of reasonable access to the user's premises for the purpose of inspection, monitoring, or sampling; or

(5) Failure to notify the general manager of significant changes to the wastewater prior to the changed discharge;

(6) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application;

(7) Falsifying self-monitoring reports;

(8) Tampering with monitoring equipment;

(9) Refusing to allow the general manager timely access to the facility premises and records;

(10) Failure to meet effluent limitations;

(11) Failure to pay fines;

(12) Failure to pay sewer charges;

(13) Failure to met compliance schedules;

(14) Failure to complete a wastewater survey or the wastewater discharge permit application;

(15) Failure to provide advance notice of the transfer of business ownership of a permitted facility; or

(16) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this article.

(Ord. No. 01-09, Art. 13, § 13.2, 12-03-2001) Sec. 3-5-313. Administrative penalty.

(a) (1) Any person including, but not limited to, industrial users that perform any of the following acts or omissions shall be subject to a administrative penalty of up to one thousand dollars ($1,000.00) per day for each

violation for each day during which the act or omission continues or occurs:

a. Violates any effluent standard or limitation imposed by a pretreatment program.

b. Violates the terms or conditions of a permit issued pursuant to a pretreatment program.

c. Fails to complete a filing requirement of a pretreatment program.

d. Fails to allow or perform an entry, inspection, monitoring, or reporting requirement of a pretreatment program.

e. Fails to pay user or cost recovery charges imposed by a pretreatment program.

f. Violates a final determination or order of the authority.

g. Violates any provisions of this ordinance, the pretreatment permit, or any order.

(2) Any administrative penalty shall be assessed in the following manner:

a. The general manager may issue an assessment against any person or industrial user responsible for the violation.

b. In assessing the administrative penalty, the general manager may consider the following factors:

1. Whether the administrative penalty imposed will be a substantial economic deterrent to the illegal activity.

2. Damages to the authority, including compensation for the damage or destruction of the facilities of the POTW, which also includes any penalties, costs, and attorneys' fees incurred by the authority as a result of the illegal activity, as well as the expenses involved in enforcing this section and the costs involved in rectifying any damages.

3. Cause of the discharge or violation.

4. The severity of the discharge and its effect on the facilities of the POTW and on the quality and quantity of the receiving waters.

5. Effectiveness of action taken by the violator to cease the violation.

6. The technical and economic reasonableness of reducing or eliminating the discharge.

7. The economic benefit gained by the violator.

c. Any person or industrial user against whom an assessment has been issued may secure a review of such assessment by filing with the general manager a written petition setting forth the grounds and reasons

for his or her objections and asking for a hearing on the matter involved before the board. If a petition for review of the assessment is not filed within ten (10) days of the date the assessment is served, the violator shall be deemed to have consented to the assessment, and it shall become final.

d. When any assessment becomes final because of a person's failure to appeal to the general manager, the general manager

may apply to the Superior Court or State Court of Henry County for a judgment and seek execution of such judgment and the court, in such proceedings, shall

treat a failure to appeal such assessment as a confession of judgment in the amount of the assessment.

e. In addition, the clerk of the authority may file a fi fa with the superior court against all property of the person or industry against whom the assessment was made.

(Ord. No. 01-09, Art. 13, § 13.3, 12-03-2001) Sec. 3-5-314. Civil penalties.

(a) Civil penalties are obtained through the Superior Court or State Court of Henry County by maintaining a civil action against the person or industrial user who is in alleged violation of the pretreatment ordinance [this article]. When the authority pursues a civil action, it is generally seeking compensatory and punitive damages against the person or industrial user for alleged harm resulting from the industrial user's violations.

Any user who is found to have violated or continues to violate an order of the authority or who fails to comply with any provision of this article, or the orders, rules, regulations or permits issued hereunder shall be liable for civil penalties in at least the amount of one thousand dollars ($1,000.00) per day for each violation. Each day on which a violation occurs or continues shall be deemed a separate and distinct offense. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation. In addition, the

authority may recover reasonable attorneys fees, court costs, court reporters' fees, expert witness fees and other expenses of litigation from the industrial user who is the losing party in the civil litigation.

(Ord. No. 01-09, Art. 13, § 13.4, 12-03-2001) Sec. 3-5-315. Criminal penalties.

(a) The authority may request the county district attorney's office or state court or county solicitor's office to pursue a criminal action against

any person and industrial user in the following circumstances:

(1) A user who violates any provision of this article will be prosecuted and sentenced as authorized by the laws of the state.

(2) A user who violates any provision of this article to the extent that the same does not otherwise qualify as a felony or misdemeanor under the laws of the state, shall be charged with a misdemeanor.

(b) In addition to any other criminal penalties, to the extent that the authority is required to pay any fines, penalties, or other fees or charges by any federal or state governmental agency, division or other entity, the violating user shall pay as restitution the amount of whatever fine, fee, penalty or charge has been assessed against the authority as a result of the violator's violation

together with costs incurred by the authority in collection of said restitution. Costs shall include but not be limited to all attorney's fees, expert witness fees, court costs, litigation expenses, survey and engineering expenses, and any out-ofpocket funds expended by the authority.

(Ord. No. 01-09, Art. 13, § 13.5, 12-03-2001) Sec. 3-5-316. Injunctive relief.

When the authority finds that a user has violated, or continues to violate, any provision of this article, a wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the authority may petition Superior Court or the State Court of

Henry County for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the wastewater discharge permit, order, or other requirement imposed by this article on activities of the user. The authority may also seek such other

action as is appropriate for legal and/or equitable relief, including a requirement for the user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against a user.

(Ord. No. 01-09, Art. 13, § 13.6, 12-03-2001) Sec. 3-5-317. Billing and service disconnection.

(a) Sewer charges shall be billed with water charges, and failure to pay sewer charges shall be treated in the same manner as for failure to pay water charges as defined in the Henry County Water Ordinance [see articles II and IV of this subchapter 3].

(b) The authority shall levy a BOD5 surcharge for industrial users whose BOD5 concentrations exceed a certain minimum value called the surcharge concentration. Surcharge will be levied up to a maximum concentration, which is the local

limit. Beyond the local limit, escalating levels of enforcement action will be pursued by the county.

The current surcharge amount and the surcharge basis may be found in the fee schedule on file with the county offices. The authority reserves the right to revise the surcharge concentration for BOD5 and the surcharge rate by providing a thirty-day notice to the industrial users.

(c) The authority reserves the right to terminate water and wastewater disposal services and disconnect a customer from the system when:

(1) A governmental agency informs the authority that the effluent from the wastewater treatment plant is no longer of a quality permitted for discharge into a

watercourse, and it is found that the customer is discharging wastewater into the public sewer that cannot be sufficiently

treated or requires treatment that is not provided by the authority as normal domestic treatment; or

(2) The customer:

a. Discharges industrial waste or wastewater that is in violation of the permit issued by the approving authority; or

b. Discharges wastewater at an uncontrolled, variable rate in sufficient quantity to cause an imbalance in

the wastewater treatment process;

or

c. Fails to pay monthly bills for sanitary sewer service when due; or

d. Repeats a discharge of prohibited wastes into public sewers.

(d) The general manager and his designees are hereby authorized to terminate water and sewerage services to customers who violate any provision of this article.

(1) The following procedures shall be followed prior to termination of sewerage services:

a. The authority, through its employees, shall forward to each violating customer notice of the violation of

which the customer has been charged.

The notice shall state the cutoff date on which the water and sewerage services will be cut off if the violation is not remedied by that date.

b. If a violating customer has not cured the violation by the date shown on the notice, the authority will cut off water and sewerage service. The general manager or his designee is authorized to direct personnel of the authority to terminate water and

sewerage services without notice to any customer that the general manager has reason to believe is willfully violating this article.

c. Once water and sewerage service has been discontinued, a customer can re-establish service by remedying the violation and paying the total amount due the authority in fees, fines and penalties together with

any other applicable charges.

d. If a customer disputes violation of the article, the customer may request a hearing within ten (10) days of receipt of said notice. A request for

hearing may be made as follows:

1. In writing, addressed to the general manager and mailed to the authority at 1695 Highway 20

West, McDonough, Georgia 30253;

2. In writing, addressed to the general manager and delivered to the authority at 1695 Highway

20 West, McDonough, Georgia 30253; or

3. By contacting the general manager by telephone during normal business hours at (770) 957- 6659.

e. A hearing date and time will be set.

The general manager or his designee shall conduct the hearing and determine whether a violation of the article has occurred. If a violation is found, the same shall be cured by

4:30 p.m. on the following business day. If the violation is not cured by said date and time, water and sewerage services shall be terminated.

(e) The authority reserves the right to discontinue its water and sewer service without notice for the following reasons:

(1) To prevent fraud or abuse.

(2) Customer's willful or negligent disregard of the terms of the article and any amendments thereto or any of the rules of the authority.

(3) Emergency repairs.

(4) Insufficiency of water supply because of circumstances beyond authority's control.

(5) Insufficiency of sewage treatment system.

(6) Legal processes.

(7) Direction of public authorities.

(8) Strike, riot, fire, flood, unavoidable accident, actions of others, or acts of God.

(f) The authority reserves the right to terminate all services granted by the authority for any other reason other than those stated above by

giving the customer ten (10) days' written notice of the date of termination and further providing the customer with a right to hearing prior to termination of the service.

(Ord. No. 01-09, Art. 14, 12-03-2001) Sec. 3-5-318. Fees, penalties and fines, etc., collection.

The authority shall be authorized to file of record fi fas to collect any outstanding fees, penalties, fines, restitution and other costs due the authority. In addition, the authority shall be

authorized to terminate water and sewerage service to any customer who has been found to violate any provision of this article, and said

service shall remain terminated until all fines, fees, penalties, restitution and other charges due the authority have been paid and all violations have been brought into compliance.

(Ord. No. 01-09, Art. 15, 12-03-2001) Secs. 3-5-319—3-5-350. Reserved.

ARTICLE IV. RATES AND CHARGES

Sec. 3-5-351. Definitions.

The definitions in article II of this subchapter shall apply to this article.

Sec. 3-5-352. Rate schedule.

(a) The rate schedule used for the authority is set from time to time. However, water rates will not increase without thirty (30) days' notice to the consumer. Notice will be sufficiently given to the consumer by a publication of the rate changes for once a week for four weeks in the official newspaper of the county prior to the rate increase.

(b) The water rate shall be as follows:

Gallons of Water Used Monthly Charge 0—3,000, minimum $7.85 3,000—10,000 2.35 (per 1000 gallons) Gallons of Water Used Monthly Charge 10,000—100,000 1.85 (per 1000 gallons) 100,000 and above 1.55 (per 1000 gallons)

(c) Municipal consumers of the authority located in the county shall pay on a monthly basis eighty-five cents ($0.85) per one thousand (1,000)

gallons for water purchased by a municipality from the authority.

(d) Since sewer rates are based on the amount of water used, the sewer rate for consumers of the authority shall be as follows:

Gallons of Water Used Monthly Charge 0—3,000, minimum $7.85 3,000—10,000 2.35 (per 1000 gallons) 10,000—100,000 1.85 (per 1000 gallons) 100,000 and above 1.55 (per 1000 gallons)

(e) Water meters shall be classified as either "active meters," "inactive meters," "cancelled meters," "line extension meters" or "subdivision meters." Said meters are further defined as follows:

(1) Active meters are defined as meters that are in use or that were purchased after August 1, 1983. All active meters will be charged on a monthly basis the rates set forth above. If an active meter is not used for a period of six (6) months after installation, or if the customer requests in writing that service be temporarily discontinued, then the meter shall be classified as an "inactive meter" and shall be treated

as hereinafter provided. A customer can maintain an active meter status by paying a monthly minimum water bill provided for herein.

(2) Inactive meters are defined as meters that are installed, but have not been used by the customer for a period of six (6) months, or the customer has notified the authority in writing to temporarily terminate service. If a meter remains unused for a period of six (6) months, or the customer

requests in writing that service be temporarily terminated, the authority will seal the meter and declare the meter an inactive meter. If a customer desires to obtain water services after the meter has been

declared inactive, the customer shall pay the authority a reconnection fee of one hundred fifty dollars ($150.00), together with any previous bills assessed against said meter prior to obtaining any additional service from the authority. Once the connection fee and any past due bills

have been paid, the meter will be reclassified as an "active meter" as defined above.

(3) Cancelled meters are defined as meters that are installed but are not used for a period of twelve (12) months, or the customer has notified the authority that the customer does not desire to obtain any

further water service from the authority.

If a meter is declared a cancelled meter, the meter will be removed and the connection sealed. A customer desiring reconnection of a cancelled meter shall pay the tap-on fee that is in effect as of the date of

the application.

(4) Line extension meters are defined as meters purchased to aid in line extensions, but the customer has not requested that the meter be installed. At the time of the purchase of the meter, the authority anticipated that the customer would connect onto the water system within a reasonable time. A number of line extension meters have been purchased, but the customer has not requested that the meter be installed. Due to the customer's failure to

connect onto the line extension, pay the minimum monthly water bill, the authority cannot recoup the cost of the line as originally anticipated. Any customer holding a line extension meter who fails to connect on prior to January 1, 1985, shall

be assessed an additional connection fee of one hundred fifty dollars ($150.00) at the time of connection. The customer may avoid the payment of the additional connection fee by paying the minimum monthly water bill until such time as the

meter is connected, at which time the meter will be classified as an "active meter" as defined above.

(5) Subdivision meters are defined as meters that were purchased for installation in subdivisions in which the water lines were constructed and installed at no expense to the authority. Any subdivision meters that were purchased prior to August 1, 1983, that are not installed prior to January 1, 1985, shall be charged an additional connection fee of one hundred fifty dollars ($150.00). This charge is assessed because

of the increased cost of operation and maintenance of the water system of Henry County. Subdivision meters that are installed but do not become "active meters" by January 1, 1984, will be classified as

"inactive meters" and shall be governed as such.

(f) All customers who pay a connection fee to the authority after August 1, 1983, will be required to pay a minimum monthly payment as set forth above commencing ninety (90) days after the

date of payment of the connection fee or on the next billing date after connection, whichever occurs first. The monthly minimum charge set forth above shall be paid whether the meter has been

installed or not.

(Ord. No. 83-27, Art. IX, 8-23-83; Ord. No. 84-13, 8-21-84) Sec. 3-5-353. Meter readings.

The water meter serving the consumer's property shall be read on a monthly basis and official records of each reading thereof shall be kept for a

period of one (1) year.

(Ord. No. 83-27, Art. X, 8-23-83) Sec. 3-5-354. Billing and collections.

(a) The consumer shall pay promptly on a monthly basis all water registered by the meter serving said property at the rate or rates set by the authority from time to time, which shall include water used, water wasted, or leakage, except for water that may be traced by the authority to the authority's system.

(b) Said bill shall be paid within fifteen (15) days from the date of said bill. In the event that said bill is not paid within fifteen (15) days from date thereof, ten (10) percent of the unpaid balance on a monthly basis will be assessed as a penalty. In the event that the bill and any penalties assessed thereon are not paid within twenty

(20) days from the date of said bill, the authority shall have the right to commence procedures to terminate the water service.

(c) If water service is discontinued for nonpayment of bill, the authority will not resume water service to the consumer until the bill and all

penalties have been paid in full and a twenty-five dollar ($25.00) nonrefundable reservice fee has been paid to the authority by the consumer.

(Ord. No. 83-27, Art. XI, §§ 1—3, 8-23-83) Sec. 3-5-355. Complaints and adjustments.

(a) If the consumer believes his bill to be in error, he shall present his claim, in writing to the authority, at the office of the authority before the bill becomes delinquent. Such claim, if made after the bill has become delinquent, shall not be effective in preventing discontinuance of service as heretofore provided. The consumer may pay such

bill under protest and said payment shall not prejudice his claim.

(b) Settlement of claims and adjustments of bills are subject to the following additional provisions:

(1) Any consumer who fails to notify the authority in writing within thirty (30) days after the date of said bill of any irregularities or errors that may be in said bill shall waive any right or claim for correction or refund under said bill.

(2) Water meters will be tested at the request of the consumer. If the meter is found to be malfunctioning, no charge will be made.

However, if the meter is found not to be malfunctioning, consumer will be required to pay a fee of twenty-five dollars ($25.00). Said fee will be added to the next

months billing.

(3) If the seal of a meter is broken by any person other than the authority's representative, or if the meter fails to register correctly or is stopped for any cause, the

consumer shall pay an amount which is the average of the three (3) previous months bills.

(Ord. No. 83-27, Art. XII, 8-23-83) Secs. 3-5-356—3-5-375. Reserved.

ARTICLE V. TOWALIGA WATERSHED

PROTECTION DISTRICT*

Sec. 3-5-376. Intent.

The intent and purpose of this article is to create a zoning district to be known as The Towaliga Watershed Protection District, which such area has a unique environmental importance to the county. This article is intended to maintain the current high water quality of the

surface water (rivers, creeks, streams and springs) and underground water of the Towaliga River Basin and to preserve and ensure the same continuing high water quality of said basin for the future. The zoning for this district is intended to

provide for certain permitted uses as hereinafter provided and to protect the underground and surface water of said basin from polluting effects of more intense development and from encroachments of those uses that are not compatible with a protected watershed.

(Ord. No. 83-23, § I, 7-5-83) Sec. 3-5-377. Definitions, etc.

The following definitions and rules of construction shall apply to this article:

(1) The Towaliga Watershed Protection District shall hereinafter be designated as

T.W.P.D.

(2) The T.W.P.D. shall hereinafter be described and designated as all that parcel of tract of land that lies in the 2nd, 3rd,

6th and 7th Districts of Henry County, Georgia, as designated by the shaded area shown in Exhibit "A" attached to Ordinance No. 83-23 and made a part hereof.

(3) Any setback measurements hereinafter stated shall be measured from the outer edge of any river, creek, stream, spring or body of water that is located within T.W.P.D., or the outer property line of any property owned, operated, managed or maintained by the county or the Henry County Water and Sewerage Authority as a water source, whichever is greater.

(4) The words "surface water" as herein used shall mean and include any river, creek, stream, spring or body of water located within T.W.P.D.

(5) The words "underground water" as herein used shall mean and include any water located underground in the T.W.P.D.

(6) The word "toxic" as herein used shall mean any chemical or substance that has been defined as toxic by the Environmental Protection Agency of the United States (E.P.A.), environmental protection department of the state (E.P.D.), or the department of agriculture of the state (A.D.).

(Ord. No. 83-23, § II, 7-5-83) Sec. 3-5-378. Preexisting conditions.

All parcels of land within the T.W.P.D. that do not conform or come within the permitted uses or the minimum standards provided by this article shall be governed by section 3-7-159 chapter 3-7 of this Code.

(Ord. No. 83-23, § III, 7-5-83) Sec. 3-5-379. Zoning and building permits.

(a) This section must be complied with prior to obtaining rezoning or building permit within the

T.W.P.D.

(b) Should the owner of a lot, parcel or tract of land, included in the T.W.P.D. propose to divide any portion of his property that lies within the T.W.P.D., the owner or his authorized agent shall submit a plat or drawing to scale showing the exact location of any surface water that is located on or within two hundred fifty (250) feet of the prope:rty to be zoned or permit to be issued upon.

(Ord. No. 83-23, § IV, 7-5-83) Sec. 3-5-380. Permitted uses.

The following uses of the property located within T.W.P.D. are permitted provided they meet all the requirements stated in this article and Chapter 3-7 of this Code:

(1) Single-family dwellings.

(2) Multi-family dwellings that are served by public sewerage.

(3) Row crops and pasture.

(4) Commercial agriculture so long as the commercial agricultural activity and any other activity associated therewith complies with

Georgia Pesticide Act of 1976, Georgia Pesticide Use and Application Act of 1976, and

O.C.G.A.2-1-4.

(5) Non-commercial agriculture, poultry, horse and livestock raising as an accessory use to a single-family dwelling for the principal benefit of the occupants thereof.

(6) Riding stables and academies.

(7) Sale of products and commodities raising on the premises only.

(8) Accessory buildings.

(9) Home occupations.

(10) Public, private or parochial, elementary and high schools and publicly owned and operated community structures, lands and athletic fields.

(11) Public utility structures.

1789

(12) Privately operated day nurseries, preschools and kindergartens.

(13) Churches and other places of worship and accessory facilities.

(14) Public and private golf courses and accessory facilities.

(15) Fishing clubs and fishing lakes, swimming pools, hunting and hunting clubs, gun clubs, golf driving ranges and similar recreational uses.

(16) Lakes and impoundments built to soil conservation service specifications.

(17) Authorized commercial activities that are not hereinafter prohibited.

(18) Authorized industrial activities that are not hereinafter prohibited.

(Ord. No. 83-23, § V, 7-5-83) Sec. 3-5-381. Prohibited uses.

The following are prohibited uses in the T.W.P.D.

(1) No sewage treatment facility shall be constructed in the T.W.P.D. unless prior approval is granted by Henry County Water and Sewerage Authority and E.P.D.

(2) No commercial business which uses, sells, stores or maintains any toxic chemicals, toxic wastes or toxic products.

(3) No agricultural business which uses, sells, stores or maintains any toxic chemicals, toxic wastes or toxic products.

(4) No agricultural activity that does not strictly comply with Georgia Pesticide Act of 1976, Georgia Pesticide Use and Application Act of 1976, and Georgia O.C.G.A.2-1-4.

(5) No industry, business or facility which uses, makes or creates as a product or byproduct any toxic wastes, heavy materials, grease, animal fat or organic loading.

(6) No dumping, discharging, releasing, spraying, distributing of any toxic or other harmful products onto the land, into the atmosphere or in a stream or body of water located in the area above described.

(Ord. No. 83-23, § VI, 7-5-83) Sec. 3-5-382. Land below reservoirs, dams, etc.

(a) This section shall apply to land lying in the T.W.P.D. that is located below any existing water reservoir, dam or any planned water reservoir or dam.

(b) No buildings or accessory buildings shall be constructed. any lower than the maximum flood elevation for a distance of one mile downstream from said reservoir dam.

(Ord. No. 83-23, § VII, 7-5-83) Sec. 3-5-383. Restricted use of certain land.

(a) Any property lying adjacent or within one thousand (1,000) feet to any property owned, managed, maintained or operated by the county or the Henry County Water and Sewerage Authority as an existing water reservoir within the T.W.P.D. or any property that is designated by

the county or the Henry County Water and Sewerage Authority as a reservoir within the T.W.P.D.

shall have in addition to the restrictive uses hereinafter set out the following restrictions:

(1) Permitted Residential Uses:

a. Minimum lot size: three (3) acres.

b. Minimum Setback Lines for Buildings or Structures: two hundred fifty (250) feet.

c. Minimum Setback Lines for Nitrification Field Lines: two hundred fifty (250) feet.

(2) Permitted Agricultural Uses:

a. Minimum Setback Lines for Building or Structures: Two hundred fifty (250) feet.

b. Minimum Setback Lines for Nitrification Field Lines: Two hundred fifty (250) feet.

c. Minimum Setback Lines for Cultivation:

Two hundred fifty (250) feet.

(3) Commercial· No commercial structures or uses of any nature.

(4) Industrial: No industrial structures or uses of any nature.

(b) The following restrictions and limitations shall apply to all other properties that are not located in specified areas set forth in subsection above:

1790

(1) Permitted Residential Use:

a. Single-Family Dwellings-Minimum Lot Size: One and one-quarter (1 ¼) acres (unless served by public sewerage).

b. Multi-family dwellings which are served by public sewerage.

c. Minimum Setback lines for Building or Structure for Single and Multi-Family Dwellings: One hundred (100) feet.

d. Minimum Setback lines for Nitrification Field Line for Single Family Dwelling:

One hundred (100) feet.

(2) Permitted Agricultural Use:

a. Minimum Setback Lines for Building or Structure: One hundred (100) feet.

b. Minimum Setback Lines for Nitrification Field Line: One hundred (100) feet.

(3) Permitted Commercial Use:

a. Minimum Lot Size: One and one-quarter (1 ¼) acres.

b. Minimum Setback Lines for Structure, Accessory Building or Parking Lot: Two hundred (200) feet.

c. Minimum Setback lines for Nitrification Field Lines: Two hundred (200) feet.

(4) Permitted Industrial Use:

a. Minimum Lot Size: Five (5) acres.

b. Minimum Setback Lines for Structure, Accessory Building or Parking Lot: Two hundred (200) feet.

c. Minimum Setback Lines for Nitrification Field Lines: Two hundred (200) feet.

(Ord. No. 83-23, § VIII, 7-5-83) Sec. 3-5-384. Variances.

Variances may be made by the board of commissioners or by any municipal governing authority located in the T.W.P.D. as to lot sizes, uses and activities, provided that sewage generated by

the facility located on said property is serviced by an approved public sewage facility. However, variances cannot be made as to any residential, com-mercial, agricultural or industrial facilities which

uses, makes or creates as a product or byproduct any toxic substance or wastes.

(Ord. No. 83-23, § IX, 7-5-83) Secs. 3-5-385—3-5-450. Reserved.

Subchapter 4 Utilities

ARTICLE I. IN GENERAL

Sec. 3-5-451. Relocation of utility lines, pipes, mains, etc.

(a) Application for permit; bond. Before any utility does any work to construct, install, maintain, remove or relocate pipes, mains, conduits, cables, wires, poles, towers, traffic and other

signals, and other equipment, facilities, or appliances in, on, along, over or under the public roads of the county, the utility shall make an application in writing to the licensing department of Henry County and shall specifically describe the

nature, extent, and location of the portion of the utility effected and shall specifically describe the type of work to be done and shall attach to the application a detailed engineer's drawing providing specifications for work to be done. The applicant shall also furnish the projected dates for the work to be started and finished and an estimated

cost of the work. The applicant shall also furnish an indemnity bond or other acceptable security in an amount to be set by the licensing department to pay any damages to any part of the county road system or to any member of the public caused by work of the utility performed under authority of the permit issued.

(b) Fee. The fee for the permit application shall be fifty dollars ($50.00).

(c) Notice to remove. When the governing authority of the county shall reasonably determine that any pipe, main, conduit, cable, wire, pole,

tower, or other signal and equipment, facilities, or appliances of any utility, in, on, along, over, or under the public roads of the county should be removed or relocated, because it has become an obstruction or interference with the use and operation of a county road or will become an obstruction or interference with the use and safe operation of a county road, which the governing authority has undertaken to improve or intends to improve,

a written notice shall be directed to the utility company, giving at least sixty (60) days' notice in which to make such change as is necessary for the removal or relocation as may be necessary. The removal or relocation shall be at the expense of the utility company. If the utility does not thereafter begin removal within a reasonable time sufficient to allow for engineering and other procedures reasonably necessary to the removal and relocation of the utility facility, the governing

authority may give the utility a final notice directing that such removal shall commence not later than ten (10) days from the receipt of such

final notice. If such utility does not, within ten

(10) days from receipt of such final notice, begin to remove or relocate the facility, or, having so begun removal or relocation, thereafter fails to complete the removal or relocation within a reasonable time, the governing authority may direct that its department remove or relocate the same with its own employees or by employing or contracting for the necessary engineering, labor, tools, equipment, supervision, or other necessary services or materials and whatever else is necessary to accomplish the removal or relocation; and the expenses thereof shall be charged to said utility.

Such expense shall be certified to the county attorney, who shall have the authority to proceed with suit against the utility for same if payment or arrangements to make payment are not made within sixty (60) days.

(Ord. No. 85-20, 11-19-85) Sec. 3-5-452. Theft of utilities.

(a) That the following practices or acts are hereby declared to be illegal and are prohibited by the Henry County Board of Commissioners:

(1) The cutting, removing or in any manner making ineffective any seal, locking band, or lock on an electrical or natural gas meter.

(2) Restoration of service by any means after service has been terminated for nonpayment, or obtaining electricity or natural gas, without making the proper deposit

with a utility company or receiving proper authorization from the respective utility company.

(3) Obtaining electricity or natural gas by use of jumper wires, or by any other means which bypass a metering device either partially or completely.

(4) Damaging or tampering in any manner with any part of a metering device belonging to a utility company.

(5) Changing or altering the normal installed position of a metering device in any fashion which causes the normal accurate recording of utility service received to be

altered and inaccurate.

(6) Obtaining electricity or natural gas by use of a metering device which is not authorized by a utility company.

(7) Interfering with the automatic registration, recording and transmission of electricity or natural gas consumption when readings are recorded and/or transmitted

electronically.

(8) Fraudulently obtaining, or attempting to obtain service from a utility company by using a false name or identification.

(9) Fraudulently obtaining, or attempting to obtain service from a utility company by placing the account in the name of someone else after the service has been disconnected for nonpayment or theft of service while the person in whose name the service was in when disconnected is still living at the location of the service; the

utility company may refuse or discontinue service to an applicant in this case.

(10) Any other reception of electrical power or natural gas service without proper authorization from the respective utility company.

(b) Alleged violations of this section shall be tried in the magistrate court of Henry County.

Any person found guilty of violating any section or part of this section shall be fined a sum not less than two hundred fifty dollars ($250.00) nor more than one thousand dollars ($1,000.00) on each count. Each day that the violation continues is a separate count.

(c) Any person found violating any section or part of this section will be required to make full restitution to the utility company for the cost of the services obtained in violation of this section, for damage to equipment of a utility company and for all associated costs of the investigation. In calculating the amount of restitution to be paid, the court is authorized to consider the following evidence:

(1) The cost of the service rendered as a result of violating this section shall be computed by the utility company.

(2) The cost of any damage to utility equipment shall be based on the actual costs.

Costs may be computed and updated annually.

(3) Investigative and any associated costs will be computed and updated annually by the utility company.

(d) Any person in possession of any premises as owner, occupant, or tenant who is found to have an electric or natural gas meter which has been tampered with or altered in violation of this section or found to be receiving electricity or natural gas as a result of any of the methods described above shall be presumed to have knowingly violated the terms of this section. Such receipt of electricity or natural gas shall be deemed

prima facie evidence of intent to defraud or deprive the utility company of recovering proper charges for payment for such service.

(e) All ordinances or parts of ordinances in conflict herewith are hereby repealed to the extent of said conflict.

(f) That the provisions of this section are hereby declared to be severable, and if any section, phrase or provision shall be declared or held invalid, such invalidity shall not affect the remainder of the sections, phrases or provisions.

(g) The Henry County Board of Commissioners finds that there is a continuing problem by individuals illegally obtaining electricity and natural gas service by various means and that this results in a loss of revenue to utility companies

and creates a dangerous situation that can result in the loss of life or property.

(h) This section shall be cumulative to O.C.G.A.

§ 16-7-25, and is enacted pursuant to O.C.G.A.

§ 16-7-25(c) which states:

"O.C.G.A. 16-7-25 Damaging, injuring, or interfering with property of public utility companies, municipalities, or political subdivisions.

(a) It shall be unlawful for any person intentionally and without authority to injure or destroy any meter, pipe, conduit, wire,

line, post, lamp, or other apparatus belonging to a company, municipality, or political subdivision engaged in the manufacture or sale of electricity, gas, water, telephone, or other public services; intentionally and without authority to prevent a meter from properly registering the quantity of such service supplied, in any way to interfere with the proper action of such

company, municipality, or political subdivision; intentionally to divert any services of such company, municipality, or political

subdivision; or otherwise intentionally and without authority to use or cause to be used, without the consent of the company, municipality, or political subdivision, any service manufactured, sold, or distributed by the company, municipality, or political subdivision.

(b) Where there is no evidence to the contrary, the person performing any of the illegal acts set forth in subsection (a) of this Code section and the person who with knowledge of such violation receives the benefit of such service without proper charges as a

result of the improper action shall be presumed to be responsible for the act of tampering or diversion.

(c) This Code section shall be cumulative to and shall not prohibit the enactment of any other general and local laws, rules, and regulations of state or local authorities or agencies and local ordinances prohibiting such activities which are more restrictive than this Code section.

(d) Any person who violates this Code section shall be guilty of a misdemeanor.

(Ga. L. 1897, p. 69; Penal Code 1910, 783;

Ga. L. 1916, p. 153, 1; Code 1933, 26-3801, 26-3802; Ga. L. 1957, p. 490, 1—5; Code 1933, 26-1507, enacted by Ga. L. 1976, p.

773, 1; Ga. L. 1978, p. 1658, 1.)"

(i) For purposes of this section solely, the term "utility company" shall be defined as: Any company, electrical membership corporation, municipality, or political subdivision engaged in the manufacture or sale of electricity or provision of

natural gas service.

(Ord. No. 10-03, 2-2-10) Secs. 3-5-453—3-5-489. Reserved.

ARTICLE II. RESERVED*

Secs. 3-5-490—3-5-498. Reserved.

ARTICLE III. STORMWATER

MANAGEMENT†

Sec. 3-5-499. Findings.

The board of commissioners of Henry County, Georgia finds as follows:

(a) Henry County is authorized by the Georgia Constitution of 1983, including, without limitation, Article IX, Section II, Paragraphs I and III thereof and O.C.G.A. § 36-82-62 to provide

stormwater management services, systems and facilities throughout the stormwater management utility service area as defined in this article.

(b) In promulgating the regulations contained in this article, Henry County is acting pursuant to authority granted by the Constitution and laws of the State of Georgia to provide for stormwater management services. A system for the collection, conveyance, storage, treatment and disposal of stormwater which provides services to all properties within the stormwater service area.

(c) Henry County presently owns and operates stormwater management systems and facilities that have been developed over many years. The future usefulness of the existing stormwater management systems owned and operated by the county, and of additions and improvements thereto,

rests on the ability of the county to effectively manage, protect, control, regulate, use, maintain, and construct stormwater management systems and facilities in concert with the management of other water resources in the county. The county must have adequate, stable, and dedicated funding for its stormwater management program operating, planning, maintenance, infrastructure development, and capital investment needs.

(d) Failure to effectively manage stormwater runoff from these systems and facilities may:

1. Cause erosion of lands, threaten businesses and residences, and other facilities with water damage and may environmentally impair the rivers, streams and other bodies of water within, and downstream

of, the county.

2. Adversely affect the operations of the sanitary sewer system operated by Henry County thereby increasing the likelihood

of infiltration and inflow into the sanitary sewer system.

3. Contribute to the potential degradation of the quality of both surface water and groundwater resources.

(e) Henry County is required under federal and state regulations (i.e., the Federal Clean Water Act, the county's National Pollutant Discharge Elimination System (hereinafter "NPDES") Phase II Stormwater Permit) to provide enhanced

management of stormwater runoff quality to mitigate the impacts of pollutants which may be discharged from the public municipal separate

storm sewer system (MS4) and stormwater conveyance system into State of Georgia or United States' waters. Compliance with the regulatory

obligations of the county's NPDES Phase II Stormwater Permit, the Metropolitan North Georgia Water Planning District (MNGWPD), the National Flood Insurance Program (NFIP) and the other applicable regulatory programs will affect

the cost of providing stormwater management services, systems and facilities above what is currently being spent for stormwater management program implementation, water quality management, drainage system maintenance, floodplain management, capital construction and other program activities.

(f) The professional engineering and financial analysis submitted to the county by ARCADIS properly assesses and defines the stormwater management problems, needs, goals, program priorities, and funding opportunities of the county.

(g) Given the problems, needs, goals, program priorities, and funding opportunities identified in the professional engineering and financing analysis, it is appropriate to authorize the formation of an organizational and accounting entity dedicated specifically to the management, maintenance, protection, control, regulation, use, and enhancement of stormwater management systems in Henry County, Georgia, in concert with other water resource management programs.

(h) Stormwater management is applicable and needed throughout unincorporated Henry County.

While specific service and facility demands may differ from area to area at any given point in time, a stormwater management service area encompassing all lands and water bodies within unincorporated Henry County is consistent with the present and future needs of the community.

(i) The stormwater needs in Henry County include, but are not limited to, protecting the public health, safety, and welfare. The provision of stormwater management programs and facilities renders and/or results in both service and benefit to all properties, property owners, citizens, and residents of Henry County in a variety of ways as identified in the professional engineering and financial analysis. The service and benefit rendered or resulting from the provision of

stormwater management systems and facilities may differ depending on many factors and considerations, including, but not limited to, location, demands, and impacts imposed on the stormwater

management systems and programs, as well as risk exposure.

(j) The Henry County Board of Commissioners finds, concludes, and determines that a stormwater management utility provides the most effective and appropriate means of properly delivering and funding stormwater management services in Henry County in a fair and equitable manner.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-500. Establishment of a utility and enterprise fund.

(a) There is hereby established a stormwater management utility under the operational control of the Henry County Board of Commissioners, which shall be responsible for stormwater management throughout the county's service area, which shall comprise the unincorporated area of

the county. The Henry County Stormwater Management Utility shall provide for the management, protection, control, regulation, use, and enhancement of stormwater management systems and facilities in the service area.

(b) The county manager shall establish a stormwater enterprise fund in the county budget and accounting system for the purpose of dedicating and protecting all funding applicable to the purposes and responsibilities of the utility, including, but not limited to, rentals, rates, charges, fees, and licenses as may be established by the

board of commissioners. Any revenues and receipts of the stormwater management utility shall be placed in the stormwater enterprise fund in

trust and be expended solely for stormwater management related purposes and services. Stormwater management utility revenue shall only be used

for operating expenses and/or capital investments of the stormwater management program. Other forms of revenue and/or financial resources, not accounted for in the stormwater management utility revenue, may be allocated as deemed appropriate by the Henry County Board of Commissioners, upon recommendation of the county manager, to provide supplemental funding to the county stormwater management program and for

the provision of stormwater management services.

(c) The Henry County Board of Commissioners shall place responsibility with the county manager (or his/her designee) for the delivery of stormwater management program services as well

as for the operation, maintenance and regulation of the existing stormwater management systems and facilities owned and heretofore operated by the county and other related assets, including, but not limited to, county-owned properties upon which such facilities are located, easements, rightsof-entry and access, and certain equipment.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-501. Service recipients/beneficiaries.

The service recipients and beneficiaries of the stormwater management utility shall include all persons, properties, and entities served by or creating a demand and an associated cost for stormwater management services and/or benefiting directly or indirectly from the utility's acquisition, management, maintenance, extension, or improvement of the public stormwater management systems and facilities, and the regulation of public and private stormwater management systems and facilities, and activities related thereto, and persons, properties, and entities that will

ultimately be served or benefited as a result of the stormwater management program.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-502. Definitions of special terms.

[The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]

Credit: Credit shall mean a conditional reduction in the amount of a stormwater service charge to an individual property based on the provision

and continuing presence of an effectively maintained and operational on-site stormwater system or facility or the provision of a service or activity

by property owner, which system, facility, service, or activity reduces the stormwater management utility's cost of providing stormwater services and facilities. Credits for on-site stormwater managePUBLIC WORKS § 3-5-502 ment systems shall be generally proportional to

the affect that such systems have on the stormwater runoff from the site.

Customers: Customers of the stormwater management utility shall include all persons, properties, and entities served by and/or benefiting from the utility's acquisition, management, maintenance, extension, and improvement of the public stormwater management systems and facilities

and regulation of public and private stormwater management systems, facilities, and activities related thereto, and persons, properties, and entities which will ultimately be served or benefited as a result of the stormwater management program.

Developed land: Developed land shall be all real property altered from a natural state by grading, paving, compaction, construction of structures, impervious surfaces, or drainage works so that the hydrologic response of the property is

changed from that which would occur in the natural undeveloped condition.

Hydrologic response: The hydrologic response of a property is the manner and means whereby stormwater collects, remains, infiltrates, and is conveyed from a property. It is dependent on several factors including, but not limited to, the presence of impervious area; the size, shape, topographic, vegetative, and geologic conditions of a property; antecedent moisture conditions; and groundwater conditions on a property.

Impervious: Impervious means not allowing the passage of water through the surface of the ground or ground covering or a substantial reduction in the capacity for water to pass through the surface of the ground or ground covering as it

would under natural conditions. The following types of surfaces will be considered "impervious" for purposes of this chapter: the vertical projected area of buildings; asphalt, concrete, brick or stone paved areas; improved vehicular drives and parking areas; compacted gravel surfaces; fabric or plastic coverings; and other surfaces that prevent

or impede the natural infiltration of stormwater runoff or that change the hydrologic response of the property that existed prior to development.

Impervious unit (IU): Given the direct and primary relationship between stormwater runoff and imperviousness, an impervious unit is defined to serve as a common reference point for comparing various properties and attaining an

equitable distribution of the cost of services and facilities through a stormwater management service charge. The impervious unit in Henry County has been determined through engineering analyses to be represented by the average area of imperviousness of the developed single-family residential parcels of record in 2005 in Henry County.

The unit has been determined to be four thousand seven hundred eighty (4,780) square feet of impervious area. The unit of four thousand seven hundred eighty (4,780) square feet of impervious

area is hereinafter referred to as the impervious unit (IU) and is the metric that shall be used to determine and compute the service charge for all properties within Henry County.

Service charges: Service charges shall mean the periodic rate, fee, or charge applicable to a parcel of land, which charge shall be reflective of the service provided by the Henry County Stormwater Management Utility. Service charges are based on measurable parameters which influence the stormwater management utility's cost of providing services and facilities, with the most

important factor being the amount of impervious area on each parcel of land. The use of impervious area as a service charge rate parameter shall not preclude the use of other parameters, or the grouping of properties having similar characteristics through the use of ranges or rounding up or down to a consistent numerical interval, or the

use of flat-rate charges for one (1) or more classes of similarly-situated properties whose impact on the stormwater management utility's cost of providing stormwater management services and facilities is relatively consistent. Stormwater service charges may also include special charges to the owners of particular properties for services or

facilities uniquely related to stormwater management of that property, including, but not limited to, charges for development plan review, inspection of development projects and on-site stormwater control systems, and enhanced level of stormwater

services above those normally provided by the county.

Stormwater management systems: Stormwater management systems shall include facilities, operations, and programs that address the issues of drainage management (flooding) and environmental quality (pollution, erosion, and sedimentation) of receiving rivers, streams, creeks, lakes, ponds,

and reservoirs through improvements, maintenance, regulation, and funding of plants, works, instrumentalities, and properties used or useful

in the collection, retention, detention, and treatment of stormwater or surface water drainage.

Undeveloped land: Land in an unaltered natural state or land that has been modified to such minimal degree as to have a hydrologic response

comparable to land in an unaltered natural state shall be deemed undeveloped. Undeveloped land shall have no pavement, asphalt, or compacted gravel surfaces or structures that create an impervious surface that would prevent infiltration of stormwater or cause stormwater to collect, concentrate, or flow in a manner materially different than that which would occur if the land was in an

unaltered natural state.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-503. Defining the service area, purposes, and powers of the utility.

The stormwater management utility shall be responsible for stormwater management throughout the unincorporated areas of Henry County.

The stormwater management utility shall provide for the conservation, management, protection, control, use, and enhancement of stormwater through planning, acquisition, construction, installation, management, operation, maintenance, regulation, extension, and improvement of the

public stormwater systems to collect, control, convey, store, detain, retain, recharge, and treat stormwater and through regulation of stormwater

management systems on private property. It shall be the primary objective of the county to provide a level of service that is comparable and consistent to similarly situated properties throughout the service area and the cost to provide those services shall be allocated proportionate to the services received and demands imposed by a parcel on the county stormwater management program.

(a) The county stormwater system consists of all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainageways, channels, ditches, swales, storm sewers, culverts, inlets, catch basins, pipes, headwalls and other structures, natural or manmade,

within the political boundaries of the county that control and/or convey stormwater through which the county directs, regulates or otherwise controls surface waters from its public streets and properties. The county owns or has legal

access for purposes of operation, maintenance, and improvements to those segments of this system that:

(b) (1) Are located within public streets, rights-of-way, and easements;

(2) Are subject to easements, rights-ofentry, rights-of-access, rights-of-use, or other permanent provisions for

adequate access for operation, maintenance, and/or improvement of systems and facilities; or

(3) Are located on public lands to which the county has adequate access for operation, maintenance, and/or improvement of systems and facilities.

(c) Operation and maintenance of stormwater management systems and facilities that are located on private property or public property not owned by the county and for which there has been no public dedication of such systems and facilities for operation, maintenance, and/or improvement of the systems and facilities shall be and

shall remain the legal responsibility of the property owner, except as that responsibility may be assumed by the stormwater management utility through written agreement or otherwise affected by the laws of the State of Georgia and/or the United

States.

(d) It is the intent of this article to protect the public health, safety, and general welfare of all properties and persons in general, but not to create any special duty or relationship with any individual person or to any specified property within or outside the boundaries of Henry County.

The county expressly reserves the right to assert all available immunities and defenses in any action seeking to impose monetary damages upon the county, its

officers, employees, and agents arising out of any alleged failure or breach of duty or relationship as may now exist or hereafter be created. To the extent any permit, plan approval, inspection or similar act is

required by the county as a condition precedent to any activity by or upon property not owned by the county, pursuant to this or any other regulatory ordinance,

regulation or rule of the county or under federal or state law, the issuance of such permit, plan approval, or inspection shall not be deemed to constitute a warranty, express or implied, nor shall it afford the basis for any action, including any action based on failure to permit or negligent issuance of a permit, seeking the imposition of money damages against the county, its officers, employees or agents.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-504. Requirements for privately owned stormwater management systems.

(a) The appropriate and efficacious management of the stormwater management system by the county on behalf of its citizens and in compliance with applicable state and federal law places necessary and appropriate obligations on private

property owners as well. All property owners and developers of developed real property within Henry County shall provide, manage, maintain, and operate on-site stormwater management systems sufficient to collect, convey, detain, and discharge stormwater in a safe manner consistent with all county development regulations and state and federal law. Failure to meet this obligation shall constitute a nuisance and be subject to an abatement action filed by the county in a court of proper jurisdiction.

(b) In the event a public nuisance is found by the court to exist, which the owner fails to properly abate within such reasonable time as allowed by the court, the county may enter upon the

property and cause such work as is reasonably necessary to be performed, with the actual cost thereof assessed against the owner in the same manner as a tax levied against the property. From the date of the filing of such action, the county shall have lien rights that may be perfected, after judgment, by filing a notice of lien on the general execution docket of the superior court of Henry County. The county shall have the right, pursuant to the authority of this article, for its designated officers and employees to enter upon private and public property owned by entities other than the county, upon reasonable notice to the owner thereof, to inspect the property and conduct surveys and engineering tests thereon in order to assure compliance.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-505. General funding policy.

(a) It shall be the policy of the county that funding for the stormwater management utility is fairly and equitably derived through methods that have demonstrable relationships to the varied demands and costs imposed by developed parcels of land on the stormwater management

systems and programs and/or the level of service provided as a result of the provision of stormwater services and facilities.

(b) Service charges for stormwater management shall be fair, equitable and reasonable and the service charges shall bear a substantial relationship to the cost of providing services and facilities. The cost of stormwater services and

facilities may include administrative, operating, capital investment, debt service, engineering and planning, and reserve expenses, and may also include related regulatory expenses associated with watershed management requirements. Properties shall be charged rentals, rates, charges, fees, or licenses in general proportion to their

related cost of service impact.

(c) Service charge rates shall be designed to be consistent and coordinated with the use of other funding methods employed for stormwater management by the county, whether within or outside the stormwater management utility, including,

but not limited to, plan review and inspection fees, special fees for services, fees in-lieu of regu- latory requirements, impact fees, system development charges, and special assessments, where applicable.

(Ord. No. 12-19, 11-20-12) Sec. 3-5-506. Stormwater management utility service charges.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:henry-county/code/whole@2026-05-28-069c6a0ab9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.