--- title: Jasper County Code of Ordinances, Sec. 113-26. Minimum requirements/BMPs collection: local-codes id: local-code:jasper-county/code/113-26 cite_as: Jasper County, Ga., Code of Ordinances § 113-26 canonical_url: https://georgiacommons.org/counties/jasper/code/113-26 md_url: https://georgiacommons.org/counties/jasper/code/113-26.md text_url: https://georgiacommons.org/counties/jasper/code/113-26/text source_url: https://library.municode.com/ga/jasper_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:jasper jurisdiction_name: Jasper County county_fips: "13159" corpus_version: local-codes-jasper-county-9ae0e531e6c7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/jasper/code/~part-ii/~part-b/~chapter-113/~article-ii.md previous: https://georgiacommons.org/counties/jasper/code/113-25.md next: https://georgiacommons.org/counties/jasper/code/113-27.md index: https://georgiacommons.org/counties/jasper.md branch: code edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:jasper-county/code/113-26@2026-11-23-0312547bc0 --- # Jasper County Code of Ordinances, Sec. 113-26. Minimum requirements/BMPs > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 113 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL / Article II - MINIMUM REQUIREMENTS FOR EROSION, SEDIMENTATION AND POLLUTION CONTROL USING BEST MANAGEMENT PRACTICES (a) Best management practices as set forth in this section and section 113-27 of this chapter shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with subsection (b) of this section or any substantially similar terms contained in a permit for the discharge of storm water issued pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act . As used in this subsection the terms proper design and properly designed mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b). (b) A discharge of storm water runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This subsection shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres. (c) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the �Georgia Water Quality Control Act,� for each day on which such failure occurs. (d) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur. (e) The LIA may set more stringent buffer requirements than stated in section 113- 27(15), (16) and (17), in light of O.C.G.A. § 12-7-6(c). ## History (Ord. of 1-8-2018, § IV(B))