Skip to content
Georgia Commons
Menu

Jasper County · Code of Ordinances

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 20 - ROADS AND BRIDGES / Article II - DRIVEWAY CULVERTS

Sec. 20-19. Requirements.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Driveways and culvert sites shall be inspected and approved by the county building inspector, code enforcement officer, public works director or a designated agent prior to the installation of any culvert on the right-of-way of a public road in the county in order to:

(1) Reduce or eliminate hazardous conditions resulting from erosion caused by unmanaged stormwater runoff from private drives;

(2) Reduce or eliminate hazardous conditions resulting from debris deposited in the roadway by unmanaged stormwater runoff from private drives; and

(3) Protect water quality by reducing sedimentation of state waters caused by unmanaged stormwater runoff from private drives.

(b) Driveways must be both designed and maintained to prevent excess stormwater runoff.

Driveways must be maintained with an all-weather surface.

(c) If required by the building inspector, code enforcement officer, public works director or a designated agent, the property owner must take immediate action to satisfy this requirement to prevent soil erosion and sedimentation.

(d) Culverts shall have a minimum diameter of 15 inches and a minimum length of 20 feet.

Any exceptions to these measurements must be approved in writing by the building inspector or his designated agent. Plastic pipe is prohibited.

(e) All persons obtaining a driveway culvert installation permit for culverts shall pay a fee for the initial inspection of the site and follow-up inspection of the installation. The amount of the fee shall be as established by the board of commissioners from time to time.

(f) Substandard culverts located on county rights-of-way may be removed by the public works department. The cost of such removal shall be at the property owner's expense.

(g) Any person failing to obtain a permit prior to the installation of a culvert on county right-of-way shall be punished according to the general penalties described in section 1-11, in addition to the regular permit fee.

(h) Failure to retain or accommodate stormwater runoff from private driveways which results in erosion and sedimentation of public roads and rights-of-way in the county shall be considered a violation of this article. Each day the violation continues shall be considered a separate offense.

(i) Violations must be corrected within 20 days of notice of violation. Fines, as described in the general penalties under section 1-11, may be imposed.

History

The history line the source prints at the end of the section.

(Code 2000, § 50-31; Ord. of 6-1-1998; Ord. of 5-4-2010)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jasper-county/code/20-19@2026-11-23-aba628a875

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Jasper County Code of Ordinances, Sec. 20-19. Requirements | Georgia Commons