(a) Application stage. The following information is required in the application stage: (1) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures; (2) Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed; (3) Design certification from a registered professional engineer or architect that any proposed nonresidential floodproofed structure will meet the floodproofing criteria of this article; (4) Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development. (b) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.