(a) The temporary placement or construction of a ramp across a ditch for purposes of loading and unloading machinery and equipment, or the removing of timber, crops or other materials or substances shall not constitute a violation of this article, providing that the temporary ramp is placed or constructed so as not to significantly restrain or divert the water flow from the roadbed or restrain or divert the water flow through the ditch on or over which the ramp is placed or constructed. (b) For the temporary ramp to be excluded as a violation of this article the temporary ramp must provide for continued normal water flow either by the installation of an adequate size pipe under the ramp or by some other means; furthermore, the person, company or other entity placing the temporary ramp over the ditch must restore the ditch and right-of-way to same or better condition as the ditch and right-of-way were prior to the placement of the temporary ramp. (c) For purposes of this section, the term "temporary" means a period of time not to exceed ten days, except for the harvesting and removal of timber, in which case the term "temporary" means the reasonable amount of time required to harvest and remove the timber. (d) If a temporary ramp is needed for a period of time in excess of that authorized in subsection (c) of this section, then the person desiring to extend the temporary period shall apply to the county administrator for an extension of time. Upon good cause shown, the county administrator, or in his absence, the county clerk or chairperson of the board of commissioners, may grant a reasonable extension of the period for a temporary ramp.