--- title: Jefferson County Code of Ordinances, Sec. 10-150. Operational requirement collection: local-codes id: local-code:jefferson-county/code/10-150 cite_as: Jefferson County, Ga., Code of Ordinances § 10-150 canonical_url: https://georgiacommons.org/counties/jefferson/code/10-150 md_url: https://georgiacommons.org/counties/jefferson/code/10-150.md text_url: https://georgiacommons.org/counties/jefferson/code/10-150/text source_url: https://library.municode.com/ga/jefferson_county/codes/code_of_ordinances date: 2024-07-09 status: active jurisdiction: county:jefferson jurisdiction_name: Jefferson County county_fips: "13163" corpus_version: local-codes-jefferson-county-29604a8e2e06 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/jefferson/code/~part-ii/~chapter-10/~article-v.md previous: https://georgiacommons.org/counties/jefferson/code/10-149.md next: https://georgiacommons.org/counties/jefferson/code/10-151.md index: https://georgiacommons.org/counties/jefferson.md branch: code edition: As published by Municode, current through 2024-07-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:jefferson-county/code/10-150@2024-07-09-48ca065ce1 --- # Jefferson County Code of Ordinances, Sec. 10-150. Operational requirement > As published by Municode, current through 2024-07-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 10 - BUSINESSES AND BUSINESS REGULATIONS / Article V - TIMBER HARVESTING (a) Driveway installation. (1) The timber operator shall follow all requirements of the Jefferson County driveway pipe installation policy before commencing work on any tract. (2) The timber operations shall post one sign in each direction from point of access to the road. Each sign will be located at a distance of 750 feet from that access point stating "WARNING-LOGGING OPERATION AHEAD, TRUCKS—EQUIPMENT ENTERING ROADWAY". Signs shall be 36" x 36"and must meet standards of GDOT size and reflectability. (b) Notice of commencement of operations. Representatives of the timber operation must notify the Jefferson County Code Enforcement Officer or his representative by phone to provide the date that the first piece of equipment is actually moved to the site. (c) Timber operations. During the period of operations the timber operator shall comply with the following: (1) Logging and skidding of logs on county roads and rights-of-way is strictly prohibited. (2) Ditches and rights-of-way shall be kept clear of all debris and residue at all times to permit proper drainage. (3) There shall be no blockage of county roads at the access site and roads must remain open at all times. (4) No equipment, trucks, or trailers shall be allowed to park on any public road or right-of-way. (5) Mud shall not be carried onto paved roads by logging vehicles. Where necessary, a temporary construction exit of gravel shall be maintained by the timber operation to eliminate any hazard to traffic or unsightly conditions on the public right-of-way. ## History (Ord. No. 002-13, § 3, 1-15-2013)