(a) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure. (b) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety. (c) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (d) In reviewing such requests, the county planning and zoning board shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this article.