Sec. 16-195. Best management practices applicable.
About this text
- As published by Municode, current through 2024-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Best management practices as set forth in sections 16-195, 16-196, and 16-197 shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with subsection (c) of this section or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to subsection O.C.G.A. § 12-5-30(f), a portion of the Georgia Water Quality Control Act.
(b) As used in this subsection the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b).
(c) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by the local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), a portion of the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm-water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This subsection (c) shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
(d) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by the local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), a portion of the Georgia Water Quality Control Act, for each day on which such failure occurs.
(e) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.
(f) The county may set more stringent buffer requirements than stated in this section under the authority of O.C.G.A. § 12-7-6(c).
History
(Ord. of 10-12-2010(02), § IV(B))