With the exception of certain exempted activities identified in section 16-449, application for a development permit within the groundwater recharge area district shall include a site plan. The following information is required for all site plans: (1) Map scale requirements. A map, or maps, drawn to a scale of one inch equals 50 feet, showing all planned improvements, including the width, depth and length of all existing and proposed structures, roads, watercourses and drainageways, water lines, wastewater and stormwater facilities, and utility installations, shall be provided by the applicant. (2) Impervious surfaces. Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site. (3) Perennial streams. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (4) Spill and leak collection systems. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.