Skip to content
Georgia Commons
Menu

Jefferson County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article V - PLUMBING / Division 3 - HIGH EFFICIENCY FIXTURES

Sec. 8-211. Exemptions.

About this text

  • As published by Municode, current through 2024-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The county, under authority granted in O.C.G.A. § 8-2-3, may by ordinance provide an exemption to the requirements of this division relative to new construction or repair or renovation of existing buildings, in the following circumstances:

(1) When the repair or renovation of the existing building does not include the replacement of the plumbing or sewage system servicing toilets, faucets, or shower heads within such existing building;

(2) When such plumbing or sewage system within such existing building, because of its capacity, design, or installation, would not function properly if the toilets, faucets, or shower heads required by this division were installed;

(3) When such system is a well or gravity flow from a spring and is owned privately by an individual for use in such individual's personal residence; or

(4) When units to be installed are specifically designed for use by persons with disabilities, or are specifically designed to withstand unusual abuse or installation in a penal institution, or are toilets for juveniles.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jefferson-county/code/8-211@2024-07-09-a88bb5bf11

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.