Johnson County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article VI - SOIL EROSION AND SEDIMENTATION CONTROL / Division 3 - PERMIT AND PLAN REQUIREMENTS
Sec. 26-224. Minimum plan requirements.
About this text
- As published by Municode, current through 2022-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Plans must be prepared to meet the minimum requirements of this division. Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the state soil and water conservation commission as a guide; or through the use of more stringent, alternate design criteria that conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local articles and state laws.
History
(Ord. of 2-9-2003, § V)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.