Any road before approval for acceptance in the county-maintained road system must conform to the standards set forth in this article. Person desiring to place a road on the county road system must apply, in writing, to the board of commissioners with a plat of survey attached containing the following information: (1) The preliminary plat shall meet the minimum standards of size, design and requirements for the predevelopment review by the county health department as contained in section 66-93 of the county Code and shall also have the following information: a. Description: 1. Proposed name of subdivision, including unit, phase, and lines separating phases and/or units. 2. Names, addresses, and telephone numbers of subdivider, engineer, landscape architect, and surveyor. 3. Graphic scale, north arrow, and date; the north point shall be identified as magnetic, true, or grid north. 4. Location map showing the relationship of the subdivision site to the surrounding area, including directions and distances to readily identifiable landmarks in the surrounding area. 5. Acreage to be subdivided. 6. Proposed number of lots. 7. Proposed density in dwellings per acre (gross). 8. Total lineal feet of proposed roads (per phase and total). b. Existing conditions: 1. Topographic contours and vertical intervals of not more than two feet when a new road is involved in a subdivision including outline of wooded areas, vegetation, and surface drainage. 2. Topographic data shall be based on field survey or aerial survey. 3. Soil conditions according to US Soil Conservation Service Classifications Manual. 4. Deed record names and addresses of adjoining property owners or subdivisions. 5. In case of a resubdivision, a copy of existing plat with proposed resubdivision imposed thereon. 6. Location of streams, lakes, wetlands, and land subject to a 100-year flood hazard, including contour elevations. State if elevations are taken from a surveyed stream on a FEMA map or if the elevations are from an independent study (HEC-2, QUICK-2, etc.). Wetland areas shall be field located. 7. Notation that live streams and/or wetlands lie (do not lie) within this subdivision, or unit and phase. Provide a copy of wetlands delineation report from a registered soil scientist in the state. 8. State whether or not a project is in a 100-year floodplain; whether or not wetlands exist on the site; or, if the area lies within portions of the limited development area or the water quality critical area of any watershed protection district. 9. Location of existing and platted property lines, location, width, and names of all platted roads, railroads, utility rights-of-way, public areas, existing buildings or structures. 10. Existing sewers, water mains, drains, culverts or other underground facilities within the tract or within the right-of-way of boundary roads with sizes, grades, and invert elevations from field surveys or other sources. All sizes and data on all utilities shall be provided. 11. Existing drainage patterns. The boundaries of the predeveloped drainage basins shall be shown on a map. The map shall include the number of acres in each basin, the predeveloped runoff coefficient, and the time of concentration. c. Proposed conditions: 1. Layout and names of proposed roads, alleys, public walkways/bikeways (i.e., sidewalks, trails, paths, bicycle facilities), with width of pavement and rights-of-way. 2. Layout of all lots, including building setback lines and lot dimensions, including lot area. Lots with detention ponds must meet minimum area requirements outside the area of the detention pond. Show all existing and proposed easements. Show drainage easements for storm drainage pipes which cross individual lots. 3. Flood elevations on any lots within a 100-year flood hazard area. In addition, the foundation elevation that is a minimum of one foot above the established 100-year flood elevation shall be shown. This data may be shown either on the lot layout or in tabular form. 4. Construction plans of roads including typical cross section and grade profiles. Show percent of each grade and length of each vertical curve. The minimum centerline stopping sight distance for interior roads is 200 feet. 5. Improvements construction plan of sanitary sewers with grades, service, pipe size, and points of discharge and connection to other trunk or lateral sewers. 6. Show the centerline stopping distance for all points of access onto county roads. Show posted speed limit of existing county roads. 7. Construction plans of storm drainage systems with pipe sizes, length, grade, location of outlets, runoff and velocity calculations, etc. All storm drainage systems carrying off-site runoff shall be designed for the 100-year storm event. All storm pipes within the county right-of-way or proposed county right-of-way for roads shall meet county standards. 8. Construction plan of improvements in the water supply system with pipe sizes and location of hydrants, valves, and all appurtenances if scheduled. 9. Draft of proposed deed restrictions to be imposed. 10. Easements for drainage and future sanitary sewers along all side and rear lot lines. 11. Proposed soil erosion and sedimentation control. 12. Documentation of compliance with state or federal stormwater management requirements. 13. All geometric design standards promulgated pursuant to section 50-22(b). (2) Road construction plans must be approved by the board of commissioners before construction begins. (3) A minimum of an 80-foot right-of-way must be granted to the county, certified by an attorney. Conveyance must be in compliance with subsection (14) of this section (4) Adequate drainage must be provided with side drain fields a minimum of 15 inches and across drains a minimum of 18 inches. (5) All roadbeds connecting with county maintained dirt roads must be stabilized with six inches of subbase mix, at least eight inches of approved topsoil or state department of transportation (DOT) standard sand-clay mix with proper compaction of the roadbed, being 100 percent compaction and covered with a minimum of two inches of aggregate surface course. Landowner or developer will provide a soil test run by an approved laboratory. (6) All roadbeds connecting to county maintained paved roads where the individual parcels are six acres or more shall at a minimum have roadbeds in compliance with subsection (5) of this section. The area of right-of-way connecting the proposed road to the county maintained system paved road must have adequate drainage, a pipe of designated specifications as approved by the department of transportation and paved to the department of transportation specifications. All cost associated with compliance of this section shall be paid by the landowner. (7) All roadbeds connecting subdivisions where individual parcels are less then six acres to county maintained paved roads must be stabilized with six inches of subbase mix, at least eight inches of approved topsoil. DOT standard sand-clay mix or Chert base with proper compaction of the roadbed being 100 percent compaction and paved with a triple surface treatment, STN size 5,7, & 89, GP 1 or 2. These road sections must comply with the typical DOT grading, drainage, base and surface section. The area of right-of-way connecting the proposed road to the county maintained system paved road must have adequate drainage, a pipe of designated specifications as approved by the department of transportation and paved to the department of transportation specifications. All cost associated with compliance of this section shall be paid by the landowner. (8) All roadbeds connecting with a state or federal highway must meet the requirements of this section and the state DOT specification and approval process for connections to a state maintained road. (9) Right-of-way will be cleared of all stumps, limbs and foreign materials. All slopes and shoulders shall have approved grassing. (10) Each roadbed shall be a minimum of 24 feet or as required by DOT standards as applicable. (11) Landowner or developer shall provide maintenance on the road for a minimum period of one year and shall continue until accepted by the county. (12) Prior to the expiration of one year, the county will inspect the road, provide owner with a list of any defects found, and owner will correct defects at owner's expense. Once the road is approved by the county, the road can then be deeded to the county (subsection (14) of this section) and placed on the county road system. (13) All construction work, stabilization cost, legal work, survey expenses and all other expenses shall be the expense of the landowner/developer. (14) Subdivision roads and rights-of-way and other lands to be dedicated to the public shall be accepted and dedicated by the county only upon the delivery to the board of commissioners of the general warranty deed conveying fee simple title of such rights-of-way and lands. The warranty deed shall be accompanied by an attorney's certificate of title and a tax transfer form addressed to the county board of commissioners certifying that the grantor in such deed is vested with marketable fee simple title to the property conveyed thereby, free and clear of all liens and encumbrances, and further that the individual executing such deed has full authority to do so. Acceptance of such dedication shall be accomplished by resolution of the board of commissioners, a certified copy of which shall be attached to both the deed of dedication and the final plat.