144.9. Erosion control. Before commencement of any land-disturbing activity, a land disturbance permit must be obtained from the planning and zoning office. All erosion and sedimentation control methods shown on the plan approved by the Natural Resources Conservation Service will be installed and inspected by the public works director prior to any land disturbance. All silt fences will be trenched into the ground a minimum of six inches with a mechanical trencher. All requirements of the Jones County Soil Erosion and Sedimentation Control Ordinance and Sections 161, 162, 163 and 171, pages 108—128 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. All required erosion and sedimentation control methods will be maintained until final stabilization is achieved. 144.10. Clearing and grubbing. Clearing and grubbing shall begin after all erosion control measures are properly installed. The clearing operation will be checked periodically by the public works director. All clearing has to be completed and approved by the public works director before grading can begin. All clearing and grubbing will be performed in accordance with section 201, pages 129—134 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. 144.11. Subgrade construction. Grading construction operations will begin after the clearing and grubbing has been approved by the public works director. The streets will be graded according to the typical section found in section 145.10 of this resolution. The public works director will do periodic checks during the grading operations and call for compaction tests as needed. Ninety-five percent compaction is required with the last six inches being 100 percent compaction. Any unsuitable material is to be removed and replaced. All subgrade construction will be performed in accordance with section 209, pages 156—159 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. 144.12. Graded aggregate construction. After the top six inches of subgrade have been completed as per the typical section found in section 145.10, have achieved 100 percent compaction, and have been approved by the public works director, the contractor may begin placing graded aggregate base material. The base shall be six inches thick with 100 percent compaction as shown in the typical section. All graded aggregate base construction will be performed in accordance with section 310, pages 226—230 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. 144.13. Bituminous prime. After the graded aggregate base operations are complete with 100 percent compaction that conforms to the typical section and has been approved by the public works director, it shall be primed. After the prime has been applied, a seven-day waiting period is needed for curing. All bituminous prime will be applied in accordance with section 412, pages 283—285 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. 144.14. Hot mix recycled asphaltic concrete. After the curing period is complete on the bituminous prime, the contractor can begin placing the two inches of recycled asphaltic concrete "B" binder. Once the binder material has been placed, the contractor will place the one and five-tenths inches of recycled asphaltic concrete "E" mix. Both layers of the recycled asphaltic concrete are to have a compaction of 96 percent of the theoretical density. All recycled asphaltic concrete will be applied in accordance with Sections 402 and 828, pages 270—273, 919—924 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition.