--- title: "Jones County Code of Ordinances, 145.113. All patching will be performed in the following manner:" collection: local-codes id: local-code:jones-county/code/145.113 cite_as: Jones County, Ga., Code of Ordinances § 145.113 canonical_url: https://georgiacommons.org/counties/jones/code/145.113 md_url: https://georgiacommons.org/counties/jones/code/145.113.md text_url: https://georgiacommons.org/counties/jones/code/145.113/text source_url: https://library.municode.com/ga/jones_county/codes/code_of_ordinances date: 2026-01-16 status: active jurisdiction: county:jones jurisdiction_name: Jones County county_fips: "13169" corpus_version: local-codes-jones-county-76525be09d8f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/jones/code/~appendix-a/~article-xiv.md previous: https://georgiacommons.org/counties/jones/code/145.9.md next: https://georgiacommons.org/counties/jones/code/146.md index: https://georgiacommons.org/counties/jones.md branch: code edition: As published by Municode, current through 2026-01-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:jones-county/code/145.113@2026-01-16-de51fda86b --- # Jones County Code of Ordinances, 145.113. All patching will be performed in the following manner: > As published by Municode, current through 2026-01-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - COMPREHENSIVE LAND DEVELOPMENT / Article XIV - REQUIRED SUBDIVISION IMPROVEMENTS A. Entire outlined section will be excavated to firm material. B. New sub-base will be installed to 95 percent compaction with the final six inches compacted to 100 percent compaction. All subgrade construction will be performed in accordance with section 209, pages 156—159 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. C. After the top six inches of subgrade have achieved 100 percent compaction and have been approved by public works, the contractor may begin placing graded aggregate base material. The base shall be six inches thick with 100 percent compaction. All graded aggregate base construction will be performed in accordance with section 310, pages 226—230 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. D. Once 100 percent compaction has been achieved on the graded aggregate base, the contractor can begin placing the two inches of recycled asphaltic concrete "B" binder. After the binder material has cooled, the contractor will place the one inch of recycled asphaltic concrete "E" mix. Both layers of the recycled asphaltic concrete are to have a compaction of 96 percent of the theoretical density. All recycled asphaltic concrete will be applied in accordance with Sections 402 and 828, pages 270—273, 919—924 of the Georgia Department of Transportation Standard Specifications Construction of Roads and Bridges, 1993 Edition. 145.114. Any intersections with patches in them, or if patches are within 20 feet of the intersection, will need to be overlaid. The entire intersection will need to be overlaid to the back of the radius with 90# overlay. 145.115. Any and all patches are to be overlaid with 90# of asphaltic concrete "G" for the entire width of the road. No skips in overlay are to be less than 100 feet apart. 145.116. If, during the excavation of an area to be patched, it is found to have less than six inches of base, additional asphalt around the patch will be removed until six inches of base is found. ## History (Ord. No. 201203-2o, 3-20-2012)