148.51. Subdividers' responsibility. The subdivider shall incur the cost of construction and installation of all required public improvements based on the following: (1) Streets: Incur the cost for the construction of streets up to 27 feet in pavement width from back of curb to back of curb, or 24 feet in pavement width from edge of pavement to edge of pavement if no curbs and gutters are installed. (2) Water and sewer systems: Incur the cost for the installation of all water and sewer systems which are required to serve the new subdivision and tie in with existing water and sewer systems, based on the specifications set forth herein. (3) Sidewalks: Entire cost. (4) Monuments: Entire cost. (5) Traffic control and street signs: Entire cost. 148.52. Board of commissioners' responsibility. The board of commissioners shall partially participate in sharing the cost of construction and installation of required public improvements for the following conditions: (1) Streets: Incur the cost for any additional required pavement which is in excess of 27 feet for streets with curbs and gutters and in excess of 24 feet for streets without curbs and gutters, and any additional grading and paving relating thereto. (2) Water and sewer system: Incur cost for any difference in the cost of the laying of oversized pipe and outfall systems which are needed in excess of the required water and sewer facilities needed to exclusively serve the new subdivision, as determined by the planning and zoning commission and board of commissioners.