--- title: Jones County Code of Ordinances, Section 149. Testing collection: local-codes id: local-code:jones-county/code/149 cite_as: Jones County, Ga., Code of Ordinances ยง 149 canonical_url: https://georgiacommons.org/counties/jones/code/149 md_url: https://georgiacommons.org/counties/jones/code/149.md text_url: https://georgiacommons.org/counties/jones/code/149/text source_url: https://library.municode.com/ga/jones_county/codes/code_of_ordinances date: 2026-01-16 status: active jurisdiction: county:jones jurisdiction_name: Jones County county_fips: "13169" corpus_version: local-codes-jones-county-76525be09d8f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/jones/code/~appendix-a/~article-xiv.md previous: https://georgiacommons.org/counties/jones/code/148.53.md next: https://georgiacommons.org/counties/jones/code/article-xv.md index: https://georgiacommons.org/counties/jones.md branch: code edition: As published by Municode, current through 2026-01-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:jones-county/code/149@2026-01-16-9f1540b5b9 --- # Jones County Code of Ordinances, Section 149. Testing > As published by Municode, current through 2026-01-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - COMPREHENSIVE LAND DEVELOPMENT / Article XIV - REQUIRED SUBDIVISION IMPROVEMENTS Engineering analysis shall be performed according to the following matrix: Table 17 Type of Tests to be Performed Minimum Number of Tests to be Performed Testing Standard Subgrade compaction (density - in place) One per 500 linear feet of roadway 95% maximum density ASTM -1557, D-1556, D-2992, and Subgrade fill compaction One per every 2 to 3 feet of D-2167 vertical fill Base compaction (density - in place) One per 500 linear feet of roadway 100% maximum density ASTM -1557 modified proctor Depth check Same as compaction Asphaltic concrete (density - in place) One per 1,000 linear feet of roadway 92% laboratory density 149.1. Required notification. The developer shall notify the director of public works, or other authorized county official, a minimum of 24 hours in advance when the roadway is ready to be tested. 149.2. Financial responsibility. The developer will be financially responsible to the testing agency for all required tests. 149.3. Proofroll. All base will be load tested with a minimum 18-ton tandem dump, or equal, to cover base thoroughly by lapping the tires on width each pass to assure a minimum tolerance of one-half inch of settling and to ensure no cracking or pumping prior to paving. This is to be witnessed by the director of public works, or designated county representative. ## History (Ord. No. 201203-2o, 3-20-2012)