Skip to content
Georgia Commons
Menu

Jones County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article IV - FLOW-RATE RESTRICTIONS ON PLUMBING FIXTURES

Sec. 18-114. Product certification.

About this text

  • As published by Municode, current through 2026-01-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The manufacturer shall certify compliance with the standards in section 18-113 by labeling the fixture and packaging as described in this section and providing, upon request, appropriate certification by an independent national testing organization acceptable to the county building official. Effective April 1, 1992, all toilets, urinals, showerheads or faucets shall be clearly labeled to indicate the maximum flow rate or water usage of the fixture at the specified test pressure. Toilets and urinals shall additionally be labeled ASME A112.19.2M, as prescribed in section 8 of such standard. The label shall be affixed to the fixture and remain there until the proper building and/or plumbing inspections have been conducted. Also, the packaging must be clearly marked to identify water use rates when offered for retail.

History

The history line the source prints at the end of the section.

(Ord. of 1-8-1991, § 4)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jones-county/code/18-114@2026-01-16-690d1e3fc5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Jones County Code of Ordinances, Sec. 18-114. Product certification | Georgia Commons