Skip to content
Georgia Commons
Menu

Jones County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article VII - STORMWATER MANAGEMENT / Division 3 - POST-DEVELOPMENT STORMWATER MANAGEMENT PERFORMANCE CRITERIA

Sec. 18-292. Water quality.

About this text

  • As published by Municode, current through 2026-01-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:

It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;

Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and,

Runoff from hotspot land uses and activities identified by the zoning director are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices.

History

The history line the source prints at the end of the section.

(Ord. No. 200612-1o, § 4.1, 12-5-2006)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jones-county/code/18-292@2026-01-16-28a52843a3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.