Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches: Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer; 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event; Erosion prevention measures such as energy dissipation and velocity control.