Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the 1-year, 24-hour storm under section 18-293 is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided.