--- title: Jones County Code of Ordinances, Sec. 18-298. Drainage system guidelines collection: local-codes id: local-code:jones-county/code/18-298 cite_as: Jones County, Ga., Code of Ordinances § 18-298 canonical_url: https://georgiacommons.org/counties/jones/code/18-298 md_url: https://georgiacommons.org/counties/jones/code/18-298.md text_url: https://georgiacommons.org/counties/jones/code/18-298/text source_url: https://library.municode.com/ga/jones_county/codes/code_of_ordinances date: 2026-01-16 status: active jurisdiction: county:jones jurisdiction_name: Jones County county_fips: "13169" corpus_version: local-codes-jones-county-76525be09d8f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/jones/code/~part-ii/~chapter-18/~article-vii/~division-3.md previous: https://georgiacommons.org/counties/jones/code/18-297.md next: https://georgiacommons.org/counties/jones/code/18-299.md index: https://georgiacommons.org/counties/jones.md branch: code edition: As published by Municode, current through 2026-01-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:jones-county/code/18-298@2026-01-16-4192615db3 --- # Jones County Code of Ordinances, Sec. 18-298. Drainage system guidelines > As published by Municode, current through 2026-01-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article VII - STORMWATER MANAGEMENT / Division 3 - POST-DEVELOPMENT STORMWATER MANAGEMENT PERFORMANCE CRITERIA Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public right-ofways. Stormwater conveyance facilities that are designed to carry runoff from more that one parcel, existing or proposed, shall meet the following requirements: (1) Methods to calculate stormwater flows shall be in accordance with the stormwater design manual; (2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and, (3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual. ## History (Ord. No. 200612-1o, § 4.7, 12-5-2006)