Jones County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article VII - STORMWATER MANAGEMENT / Division 4 - CONSTRUCTION INSPECTIONS OF POST-DEVELOPMENT STORMWATER MANAGEMENT SYSTEM
Sec. 18-311. Inspections to ensure plan compliance during construction.
About this text
- As published by Municode, current through 2026-01-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Periodic inspections of the stormwater management system construction shall be conducted by the zoning director or any county employee designated by the zoning director or conducted and certified by a professional engineer who has been approved by Jones County. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.
All inspections shall be documented with written reports that contain the following information:
(1) The date and location of the inspection;
(2) Whether construction is in compliance with the approved stormwater management plan;
(3) Variations from the approved construction specifications; and,
(4) Any other variations or violations of the conditions of the approved stormwater management plan.
If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.
History
(Ord. No. 200612-1o, § 5.1, 12-5-2006)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.