--- title: Jones County Code of Ordinances, Sec. 34-173. Inspection of permitted sites; notice to comply; failure collection: local-codes id: local-code:jones-county/code/34-173 cite_as: Jones County, Ga., Code of Ordinances ยง 34-173 canonical_url: https://georgiacommons.org/counties/jones/code/34-173 md_url: https://georgiacommons.org/counties/jones/code/34-173.md text_url: https://georgiacommons.org/counties/jones/code/34-173/text source_url: https://library.municode.com/ga/jones_county/codes/code_of_ordinances date: 2026-01-16 status: active jurisdiction: county:jones jurisdiction_name: Jones County county_fips: "13169" corpus_version: local-codes-jones-county-76525be09d8f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/jones/code/~part-ii/~chapter-34/~article-iv/~division-1.md previous: https://georgiacommons.org/counties/jones/code/34-172.md next: https://georgiacommons.org/counties/jones/code/34-174.md index: https://georgiacommons.org/counties/jones.md branch: code edition: As published by Municode, current through 2026-01-16 edition_date_kind: current_through source_publisher: Municode version_id: local-code:jones-county/code/34-173@2026-01-16-84b82ed5c2 --- # Jones County Code of Ordinances, Sec. 34-173. Inspection of permitted sites; notice to comply; failure > As published by Municode, current through 2026-01-16 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - ENVIRONMENT / Article IV - SOIL EROSION AND SEDIMENTATION CONTROL / Division 1 - GENERALLY The zoning director or other county employee designated by the zoning director will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article. ## History (Ord. No. 2010-07, 7-20-2010; Ord. No. 201801-1o, 1-16-2018)