(a) Where an existing permitted SES is either undergoing routine maintenance or being upgraded, in a manner that does not increase the footprint, power output, light reflectivity, impervious surface, risk to animals and vegetation, or otherwise affect the health, safety and welfare of the neighboring or nearby property, no additional zoning review shall be required. However, an updated decommissioning plan shall be filed and signage shall be updated within three days of the upgraded facility being brought on line for power generation. (b) In regard to an SES operating prior to the effective date of this chapter: (1) If the SES is undergoing routine maintenance, and otherwise does not to increase the footprint, power output, light reflectivity, impervious surface, risk to animals and vegetation, or otherwise affect the health, safety and welfare of the neighboring or nearby property, no additional zoning review shall be required. (2) If the SES is receiving an upgrade, the entire system shall be evaluated as a new application under the relevant sections of both this section and Section 117. (c) The zoning enforcement officer, or their designee, shall be the sole determiner of fact as to whether proposed maintenance or upgrades increase the footprint, power output, light reflectivity, impervious surface, risk to animals and vegetation, or otherwise affect the health, safety and welfare of the neighboring or nearby property.