98.51. No new tower or cell site may be established if there is a technically suitable space available on an existing communications tower within the geographic area that the new site is to serve. 98.52. All structures shall be located no closer to the nearest adjoining property line than its finished height. 98.53. All structures must meet the requirements of Part 77 of the Federal Aviation Regulations, and guidelines of the Federal Communications Commission. Said certifications shall be the responsibility of the applicant. 98.54. All obsolete or unused facilities shall be removed within 12 months of cessation of operations at the site. 98.55. For all towers that are required to be illuminated, a dual lighting mode of red at night and strobe during day shall be allowed. Strobe at night shall not be permitted.